网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
The two courses of action if the underwater hull of a ship is severely damaged are to plug the openings and to ______.
A.dewater the compartment
B.establish and maintain flooding boundaries
C.secure power to the compartment
D.counter flood to maintain even keel
参考答案
更多 “ The two courses of action if the underwater hull of a ship is severely damaged are to plug the openings and to ______.A.dewater the compartmentB.establish and maintain flooding boundariesC.secure power to the compartmentD.counter flood to maintain even keel ” 相关考题
考题
A decision is a choice______(make)from among alternative courses of action that are available.
考题
As the brochures you sent us were() damaged in the mail, we would like you to mail us some more.A、badB、hardlyC、veryD、severely
考题
______, where the ship is docked for hull coating renewal, and for any other required underwater work to be carried out, when the opportunity is taken to make other repairs.A.Voyage repairsB.Routine dockingC.Damage repairsD.Conversion
考题
The objective of shoring the damaged area of a ship is to ______.A.force the warped,bulged,or deformed sections back into placeB.support and hold the area in the damaged positionC.withstand subsequent additional damageD.make a watertight seal at the damaged area
考题
The wooden plug inserted in the vent of a damaged tank should be removed if you are going to ______.A.pump from the damaged tankB.fight a fireC.abandon shipD.use the crossover system
考题
A ship lists and trims about the ______.A.Center of gravityB.Center of buoyancyC.Center of flotationD.Centroid of the underwater volume
考题
单选题The two courses of action if the underwater hull of a ship is severely damaged are to plug the openings and to().A
dewater the compartmentB
establish and maintain flooding boundariesC
secure power to the compartmentD
counter flood to maintain even keel
考题
单选题If the buoyant force on a ship’s hull is equal to the displacement tonnage,the ship will().A
require ballastB
be down by the headC
sinkD
float
考题
单选题The port gang way caught on a()on the wharf and was severely damaged.A
bollardB
bittC
stemD
keel
考题
单选题Our ship has not been to shipyard for a long time, the fouling on the ship’s hull greatly decreases her().A
resistanceB
weightC
speedD
displacement
考题
单选题()is applied to the area of the ship’s hull which is out of water when the ship is loaded.A
Boottopping paintB
Topside paintC
Bottom paintD
Primer
考题
单选题In the event of damage to the DEEP WATER SHIP which results in flooding to one of the lower-hull tanks,pump from().A
nearby damaged tanksB
nearby undamaged tanks containing ballastC
tanks on the opposite cornerD
the opposite trim tank
考题
单选题When a vessel is inclined by an external force,the().A
shape of the vessel's underwater hull remains the sameB
vessel's center of gravity shifts to the center of the vessel's underwater hullC
vessel's center of buoyancy shifts to the center of the vessel's underwater hullD
vessel's mean draft increases
考题
单选题Your vessel is listing 4° to port and has a short rolling period. There is loose firefighting water in the hull. The ship is trimmed down by the head with one foot of freeboard at the bow. Which action should you take FIRST?()A
Press up the slack NO.1 starboard double bottom tankB
Pump out the forepeak tankC
Eliminate the water in the 'tween decks aft
考题
单选题If the buoyant force on a ship’s hull is equal to the displacement tonnage, the ship cause().A
require ballastB
be down by the headC
sinkD
float
考题
单选题The two factors which make underwater hull repair difficult are accessibility and the().A
availability of toolsB
shape of the hullC
pressure exerted by the waterD
threat of progressive flooding
考题
单选题I hereby request permission to()the ship hull for routine maintenance.A
operateB
repairC
oilD
paint
考题
单选题A circuit that has one wire in contact with the hull of the ship is a()A
series circuitB
grounded circuitC
short circuitD
closed circuit
考题
单选题(),where the ship is docked for hull coating renewal, and for any other required underwater work to be carried out, when the opportunity is taken to make other repairs.A
Voyage repairsB
Routine dockingC
Damage repairsD
Conversion
考题
单选题A ship lists and trims about the().A
center of gravityB
center of buoyancyC
center of flotationD
centroid of the underwater volume
考题
单选题The depth of the ship below waterline measured vertically to the lowest part of the hull is called ().A
trimB
leanC
draftD
tonnage
考题
单选题The objective of shoring the damaged area of a ship is to().A
force the warped,bulged,or deformed sections back into placeB
support and hold the area in the damaged positionC
withstand subsequent additional damageD
make a watertight seal at the damaged area
考题
单选题The wooden plug inserted in the vent of a damaged tank should be removed if you are going to ().A
pump from the damaged tankB
fight a fireC
abandon shipD
use the crossover system
考题
单选题The centre of lateral resistance is().A
the center of the hydrodynamic forces acting on the underwater hull to resist the effect of the windB
the point of influence of wind on the shipC
the pivot pointD
the point on the ship's above-water structure upon which the whole force of the wind can be considered an act
考题
单选题The wooden plug inserted in the vent of a damaged tank of a ship should be removed in case it is decided to().A
pump from the damaged tankB
fight a fireC
abandon the rigD
use the crossover system
考题
单选题The athwartship hull structural members of a ship are().A
stringersB
girdersC
breasthooksD
deck beams
热门标签
最新试卷