网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding ______.
A.18 months
B.2 years
C.3 years
D.5 years
参考答案
更多 “ Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding ______.A.18 monthsB.2 yearsC.3 yearsD.5 years ” 相关考题
考题
Compliance with the terms of the load line certificate on a ship is the responsibility of the ______.A.Ballast Control OperatorB.Barge SupervisorC.Master or Offshore Installation ManagerD.operators representative
考题
A load line for a ship is assigned by the ______.A.Minerals Management ServiceB.Department of EnergyC.Corps of EngineersD.A recognized classification society approved by the Coast Guard
考题
When must the Master or person in charge of a ship log the position of load line marks in relation to the surface of the water in the logbook?A.Once a dayB.At the change of every watchC.Only when in fresh or brackish waterD.Prior to getting underway
考题
The document that certifies the correctness of the load line marks on a ship is called the ______.A.Certificate of InspectionB.Load line certificateC.Certificate of DocumentationD.SOLAS Certificate
考题
Which statement about the dangerous cargo manifest,carried on a ship,is TRUE ________.A.The manifest must be made up by the Master or other designated ship's officerB.Shipments of hazardous and non-hazardous cargo may be listed on the manifest if they are destined for the same consigneeC.The manifest must be kept in a designated holder on or near the bridgeD.The type of label(s)required for each cargo must be indicated
考题
A load line of a ship is assigned by ______.A.Minerals Management ServiceB.Department of EnergyC.Corps of EngineersD.A recognized classification society approved
考题
A tug would NOT assist a ship to steer if the tug is made up to the large vessel ______.A.by a tow line ahead of the vesselB.forward on either bow of the vesselC.approximately amidships of the vesselD.on the vessel’s quarter
考题
在集合地点集合。()A、Meet in front of the muster station.B、Get hold of the ladder.C、Drop me a heaving line to lift my bag.D、A ship is made fast to the equipment by mooring lines.
考题
单选题Deck beams on a ship are generally spaced at equal intervals and run().A
longitudinallyB
verticallyC
transverselyD
intermittently
考题
单选题The downflooding angle for a ship is the minimum angle at which().A
the load line becomes submergedB
a non-watertight opening is at still water levelC
offset becomes excessiveD
reserve buoyancy is a maximum
考题
单选题Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().A
18 monthsB
2 yearsC
3 yearsD
5 years
考题
单选题Berthing means bringing a vessel to her berth until().A
the ship is made fastB
the ship‟s first line is sent ashoreC
the ship is dredging anchorD
the ship‟s pilot disembarks
考题
单选题When a ship is in tropical zone and in seawater of density 1025,she must not load to more than the upper edge of the line marked().A
SB
TC
WD
F
考题
单选题A tug would NOT assist a ship to steer if the tug is made up to the large vessel().A
by a tow line ahead of the vesselB
forward on either bow of the vesselC
approximately amidships of the vesselD
on the vessel's quarter
考题
单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().A
INTERNATIONAL LOAD LINE CERTIFICATEB
PASSENGER SHIP SAFETY CERTIFICATEC
CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED
GENERAL DECLARATION
考题
单选题When a ship is in summer zone and in seawater of density1025,she must not load to more than the upper edge of the line marked().A
SB
TC
WD
F
考题
单选题A load line is assigned to a ship to insure adequate stability and().A
mooring tensionB
riser tensionC
lifesaving equipmentD
structural strength
考题
单选题Compliance with the terms of the load line certificate on a ship is the responsibility of the().A
Ballast Control OperatorB
Barge SupervisorC
Master or Offshore Installation ManagerD
operators representative
考题
单选题A load line of a ship is assigned by the().A
minerals management serviceB
Department of energyC
corps of engineersD
a recognized classification socitey approved
考题
单选题If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().A
when the line pull reaches the rated winch capacityB
after the line pull exceeds the rated winch capacityC
after a short build-up of torqueD
immediately
考题
单选题When must the Master of a vessel log the position of load line marks in relation to the surface of the water in the Official Logbook?()A
Once a dayB
At the change of every watchC
Only when in fresh or brackish waterD
Prior to getting underway
考题
单选题The duration of an Internationl Load Line Exemption Certificate issued by an Administration to a ship exempted under paragraph(2) of article 6 shall not exceed。()A
2yearB
3yearsC
4yearsD
5years
考题
单选题Which is the winter load waterline on the load waterline mark?().A
The line over the summer load waterlineB
The line above the tropical load waterlineC
The line below the tropical load waterlineD
The line between the summer and the winter north Atlantic load waterline
考题
单选题A branch line valve of a fire extinguishing system on a ship must be marked with the().A
maximum pressure allowed at that branchB
name of the space or spaces which it servesC
date of the last maintenance inspectionD
pressure needed to maintain an effective stream at that point
考题
单选题The document that certifies the correctness of the load line marks on a ship is called the ().A
Certificate of InspectionB
Load line certificateC
Certificate of DocumentationD
SOLAS Certificate
考题
单选题Where advance freight is agreed upon,payment does not depend on delivery and must be made ()the ship is lost and the cargo never delivered.A
UnlessB
WhenC
BecauseD
Even though
考题
单选题When must the Master or person in charge of a ship log the position of load line marks in relation to the surface of the water in the logbook?()A
Once a dayB
At the change of every watchC
Only when in fresh or brackish waterD
Prior to getting underway
热门标签
最新试卷