网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the ______.
A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
参考答案
更多 “ In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the ______.A.chemical and physical properties of the materialB.name of the alternative standard or specificationC.the ASTM or ABS specification the material approximatesD.manufacturer or origin of the material ” 相关考题
考题
Of the following,______means the sufficiency of a vessel in materials,construction,equipment,crew,and outfit for the trade or service in which it is employed.A.ProficiencyB.SeaworthinessC.CargoworthinessD.Readiness
考题
______ is issued under the provision of International Convention for the Prevention of Pollution from Ships,1973,as modified by the Protocol of 1978 relating thereto.A.INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATEB.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATEC.CARGO SHIP SAFETY EQUIPMENT CERTIFICATED.CARGO SHIP SAFETY RADIOTELEPHONY CERTIFICATE
考题
A ship under construction or major repair will acquire permanent magnetism due to ______ while sitting stationary in the earth's magnetic field.A.hammering and jarringB.vibration and poundingC.varying magnetic fieldsD.stable or permanent magnetism of the ship
考题
When patching holes in the hull of a ship,pillows,bedding,and other soft materials can be used as ______.A.caulkingB.gasketsC.strongbacksD.wedges
考题
Which of the following materials is not appropriate for a teacher to use in listening practice?A.Materials with different dialects.
B.Comprehensible authentic materials.
C.Materials with comprehensible new words for students.
D.Materials with contents beyond students’ comprehension capacity.
考题
An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()A、The location and extent of application of different grades and strengths of materialsB、The approved and available welding procedure adopted in the constructionC、Restrictions or prohibitions of repairing or modificationD、None of them
考题
An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()A、The location and extent of application of different grades and strengths of materials.B、The approved and available welding procedure adopted in the constructionC、Restrictions or prohibitions of repairing or modificationD、None of them
考题
单选题In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().A
chemical and physical properties of the materialB
name of the alternative standard or specificationC
the ASTM or ABS specification the material approximatesD
manufacturer or origin of the material
考题
单选题The construction portfolio may be included as part of the ship().A
general plansB
operating manualC
builders documentationD
CCS file
考题
单选题It is requested that the ship’s personnel are()the port regulations.A
to conform toB
to draw upC
to comply withD
to be applicable to
考题
单选题Which one is not true?()A
Two main areas of skill are involved in the construction of shipB
There are distinct divisions in responsibilities between naval architects and marine engineersC
Each ship will assume varying proportions according to its typeD
Ships can be divided into different categories from different perspectives
考题
单选题According to Annex Ⅴ of MARPOL 73/78, the dunnage, lining and packing materials which will float can be discharged when the ship is more than()away from the nearest land.A
3 n mileB
5 n mileC
12 n mileD
25 n mile
考题
单选题A seaman assaults the Second Mate and injures him with a beer bottle while the ship is at sea. The incident is logged in the Official Logbook. In subsequent suspension and revocation proceedings against the seaman,according to the regulations,().A
the Second Mate and the Master must testify as to the facts of the assaultB
the case will be dismissed if the logbook entries are improperly madeC
the logbook entry is prima facie evidence of the facts if it complies with the lawD
the logbook is inadmissible if the logbook entries do not conform to the law
考题
单选题In ship construction,bulkheads in the quarters are generally().A
structuralB
watertightC
non-structuralD
continuous
考题
单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().A
INTERNATIONAL LOAD LINE CERTIFICATEB
PASSENGER SHIP SAFETY CERTIFICATEC
CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED
GENERAL DECLARATION
考题
单选题There is implied term()the Charterer must act with reasonable dispatch and in accordance with the ordinary practice of the port in doing those acts which he must do to enable the vessel to become an arrived ship.A
whereB
whichC
thatD
whether
考题
单选题Which of the following shall not the officers in charge of the navigational watch do?()A
continue to be responsible for the safe navigation of the shipB
Leave the bridgeC
Keep the watch on the bridgeD
Use any available navigational aids necessary to ensure that the ship follows the planned course
考题
单选题Please arrnge for the workers to do the()work during loading the trucks and heavy cargo on the ship, and also supply the necessary materials for the work.A
lashingB
shiftingC
liftingD
tallying
考题
单选题()is issued under the provision of International Convention for the Prevention of Pollution from Ships,1973,as modified by the Protocol of 1978 relating thereto.A
INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATEB
CARGO SHIP SAFETY CONSTRUCTION CERTIFICATEC
CARGO SHIP SAFETY EQUIPMENT CERTIFICATED
CARGO SHIP SAFETY RADIOTELEPHONY CERTIFICATE
考题
单选题By saying “raw materials do not exist, they are created” the author means _____.A
that there will be no more raw materials on the earth some time later, and man will have to create materials by themselvesB
that it is use that makes raw materials valuableC
that people have created various useful materials by using their intelligence and wisdomD
human creativity is amazing
考题
单选题A ship under construction or major repair will acquire permanent magnetism due to()while sitting stationary in the earth’s magnetic field.A
hammering and jarringB
vibration and poundingC
varying magnetic fieldsD
stable or permanent magnetism of the ship
考题
单选题A simplified construction plan may be included in the ship construction portfolio provided it adequately defines the().A
areas where special materials are usedB
hazardous areasC
location of emergency repair equipmentD
type and strength of materials used
考题
单选题The purpose of sheer in ship construction is to().A
allow the ship to ride waves with drier decksB
eliminate the need for butt strapsC
eliminate the need for margin platesD
give greater strength at the deck edge
考题
多选题An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()AThe location and extent of application of different grades and strengths of materialsBThe approved and available welding procedure adopted in the constructionCRestrictions or prohibitions of repairing or modificationDNone of them
考题
多选题An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()AThe location and extent of application of different grades and strengths of materials.BThe approved and available welding procedure adopted in the constructionCRestrictions or prohibitions of repairing or modificationDNone of them
考题
单选题A record of the types and strengths of steels used on a ship must be included in the().A
general plansB
builder's documentationC
Certificate of InspectionD
construction portfolio
热门标签
最新试卷