考题
A note of protest is a declaration made by the Master of a vessel before a notary public.Its purpose is to ________ .A.protest acts of violence or misconduct by the vessels crewB.state that damage to cargo or vessel was caused by improper loading or pilferage by others rather than ships personnelC.state that the damage to ship,cargo or both was due to the perils of the seaD.state that the perishable cargo was damaged because of negligence by port authorities or other officials
考题
It has been decided that to be lawful merchandise, goods loaded under the charter-party must not only be such as can be loaded without breach of the law in force at the port of loading, but must also be such as can lawfully be carried and discharged at the ________ .A.port of dischargeB.port of sailingC.port of flagD.port of departure
考题
The time of voyage insurance with cargo on board will,in accordance with PICC Clauses, commence from the time of ________ .A.unmooring at port of sailingB.weighing anchor at port of sailingC.loading at port of sailingD.sailing from port of sailing
考题
A vessel has completed loading cargo in the port of San Francisco. What document is signed by the Master stating the terms that goods were delivered by the shipper and were received by the ship? ______.A.Bill of GoodsB.Bill of LadingC.Cargo ManifestD.Cargo Receipt
考题
In every case the Owners shall ______ his own Broker or Agent both at the port of loading and the port of discharge.A.appointB.give name toC.makeD.take
考题
______ my knowledge the figure at the loading port is not quite accurate.A.AtB.InC.ToD.With
考题
When loading a container vessel,the operation is basically that of vertical loading.The important factors to be considered when loading containers are port of discharge,______.A.Available dunnage,and chockingB.Crushability,and inherent viceC.Sweat,and weightD.Weight,and refrigeration
考题
材料:162007 0900LT MASTER SIDUSDEAR CAPTAINQUOTESAILING INSTRUCTIONS FOR YR VESSELTHIS IS R.S.PLATOU,OSLOSUBJ:FIXTURE OF YR VSL YOU ARE KINDLY REQUESTED TO PROCEED TO SAN NICOLAS(POSITION S 15° 14′,W O 75° 14′)TO LOAD BLAST FURNACE PELLETS FOR KAOHSIUNG,TAIWAN.(POSITION N 22°37′,E 120°15′).STOWAGE FACTOR 0.461 CUBIC METERS PER METRIC TONNE ACCORDING TO TIME CHARTERER SHOUGANG HIERRO PERU S.A LAYCAN:16 OCT/26 OCTQUANTITY:FULL CARGOTERMS:ACCORDING TO TIME CHARTER NYPE:FIOAGENT LOAD PORT:CONSORCIO EMPRESARIAL AGNAV S.ATELEPHONE(0051)330-6605 FAX:(0051)330-2664AGENT DISCH PORT:TO BE COMMUNICATED TO U SHORTLYREPORTS:ETA MUST BE SENT“MINIHIERRO”LIMA AND TO SAN NICOLAS 5 DAYS IN ADVANCE,AND CONFIRMED 48 HRS AND 24 HRS BEFORE ARRIVALSPECIAL ATTENTION:WHEN CONTACT MADE WITH THE RADIO STATION OAS AT SAN JUAN,A PRE-STOWAGE HATCH LIST WITH SEQUENCE OF LOADING TO BE SENT TO LOAD PORT NOT LESS THAN 48 HRS IN ADVANCE.THE RADIO STATION WILL ALSO COMMUNICATE BERTHING INSTRUCTIONS.ON ARRIVAL SUPPLIER REQUIRES YOUR PRE-STOWAGE PLAN PRIOR TO LOADING,TOTAL CARGO,ESTIMATED HATCH TONNAGE,LOADING SEQUENCE,FUEL WATER AND STORES ON BOARD,DRAUGHT, STABILITY AND TRIM ON FINISHING LOADING.DEBALLASTING:ALLOWED AT BERTH PROVIDED CLEAN SUBJECT TO APPROVAL BY PORT AUTHORITY.SURVEYS:HOLDS TO BE INSPECTED BEFORE LOADING. CARGO OFFICER TO ACCOMPANY INSPECTOR.ON AND OFF HIRE SURVEYS REQUIRED ACCORDING TO CHARTER PARTY.FURTHER INSTRUCTIONS TO FOLLOW SHORTLY.BEST REGARDS ROTASJ/KNMEND QUOTE问题:The nominated agent for the Vessel at the loading port is ________.A.MINIHIERROB.CONSORCIO EMPRESARIAL AGNAV S.AC.SAN NICOLASD.SAN JUANThe BERTHING INSTRUCTIONS will be obtained from ________.A.the agent at the loading portB.discharge port authorityC.further instructions to follow shortlyD.the radio station OAS at San JuanAccording to this fixture,________.A.the vessel is not liable for the expenses of loading and dischargingB.the cargo will be discharged at San NicolasC.the freight of this voyage is likely to be charged as per measurement tonnage of the cargoD.the canceling date of this fixture is 16 OctOn and off hire surveys should be carried out ________.A.in accordance with the charter-partyB.as per further instructionsC.by the cargo officer on boardD.48 hours prior to arrival at the loading port请帮忙给出每个问题的正确答案和分析,谢谢!
考题
汉译英:“装运港;卸货港”,正确的翻译为( )。
A. port of transfer ; port of discharge B. port of loading ; port of discharge
C. port of transfer ; port of destination D. port of loading ; port of desdnafion
考题
汉译英:“目的港”,正确的翻译为( )。
A. port of loading B. port of destination
C. port of discharge D. port of dispatch
考题
汉译英:“装货港;到达日期”,正确的翻译为:()
A.Port of loading ; Date of departure
B.Port of discharge ; Date of departure
C.Port of loading ; Date of arrival
D.Port of discharge ; Date of arrival
考题
汉译英:“装货港;到达日期”,正确的翻译为:( )。
A. Port of loading ; Date of departure B. Port of discharge ; Date of departure
C. Port of loading ; Date of arrival D. Port of discharge ; Date of arrival
考题
翻译:any kraft paper and/of dunnage if required at loading port to be for owners’ account
考题
单选题A note of protest is a declaration made by the Master of a vessel before a notary public.Its purpose is to().A
Protest acts of violence or misconduct by the vessel's crewB
State that damage to cargo or vessel was caused by improper loading or pilferage by others rather than ship's personnelC
State that the damage to ship,cargo or both was due to the perils of the seaD
State that the perishable cargo was damaged because of negligence by port authorities or other officials
考题
单选题The port clearance for a ship should be granted()the completion of loading or discharging in the port.A
beforeB
whenC
afterD
during
考题
单选题The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().A
the port of destinationB
the next port of callC
the port of arrivalD
the last port of call
考题
单选题()my knowledge the figure at the loading port is not quite accurate.A
AtB
InC
ToD
With
考题
单选题When loading a container vessel,the operation is basically that of vertical loading. The important factors to be considered when loading containers are port of discharge,().A
available dunnage,and chockingB
crushability,and inherent viceC
sweat,and weightD
weight,and refrigeration
考题
单选题A vessel has completed loading cargo in the port of San Francisco. What document is signed by the Master stating the terms that goods were delivered by the shipper and were received by the ship?().A
Bill of GoodsB
Bill of LadingC
Cargo ManifestD
Cargo Receipt
考题
单选题If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.A
in the loading placeB
in the port or dockC
in the loading spotD
in the discharging spot
考题
问答题翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port
考题
单选题The present voyage of my ship began at the port of Shanghai after loading 8 000 tons of Cargo on board and ended after discharging the Cargo at the port of Hong Kong,which was().A
the port of destinationB
the next port of callC
the port of arrivalD
the last port of call
考题
单选题How()the cargo at loading port?A
aboutB
inC
withD
from
考题
单选题I’m not fully aware()what happened at the loading port.A
atB
toC
ofD
about
考题
填空题port-of-loading的意思是()