网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The ()(包装货) is loaded and unloaded by cargo sling.
A

bagged cargo

B

packed cargo

C

cased cargo

D

deck cargo


参考答案

参考解析
解析: 暂无解析
更多 “单选题The ()(包装货) is loaded and unloaded by cargo sling.A bagged cargoB packed cargoC cased cargoD deck cargo” 相关考题
考题 The adoption of containers facilitated()to a great extent. A、to load and unloadB、the loading and unloadingC、us to load and unloadD、to have loaded and unloaded

考题 The tentative cargo plan ________ .A.eliminates confusion with the final stowage planB.shows the approximate amount of cargo to be loaded in each holdC.expedites the total operationD.requires an unproportional number of gang hours of work to discharge the cargo

考题 Deadfreight is the charge for the ______.A.carriage of demise cargoB.cost of transshipment of over-carried cargoC.difference in the amount of cargo loaded and the amount of cargo dischargedD.difference in the amount of cargo loaded and the amount of cargo booked,through no fault of the vessel

考题 Yesterday afternoon 2 cargo surveyors appointed by the consignee came on board for investigation. I told them the cargo was loaded between Aug. 14th. and 16th. Under favorable weather without any remarks on __________.A.log bookB.short/over-loaded cargo listC.the mate’s receiptD.manifest

考题 ______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.A.Alternate hold loading conditionB.Block hold loading conditionC.Part hold loading conditionD.Homogeneous hold loading condition

考题 Cargo securing for Ro-Ro is based on the concept of _______.A.Solid packingB.Rapid loading and dischargeC.Vessel loaded full and down to her marksD.Palletized cargo

考题 A bonding cable should be connected for cargo operations aboard a tank vessel as soon as the ______.A.Cargo has been loaded or dischargedB.Cargo hose is connectedC.Cargo pumps are startedD.Vessel is ready to handle cargo

考题 The()(非包装货) is loaded and discharged by belt conveyer.A、non-packed cargoB、packed cargoC、cased cargoD、inboard cargo

考题 单选题()may be laid ready for the cargo or may just be put in bundles ready for the stevedores to lay out as the cargo is loaded.A WedgeB DunnageC ShoreD Store

考题 单选题Yesterday afternoon 2 cargo surveyors appointed by the consignee came on board for investigation. I told them the cargo was loaded between Aug.14th.and 16th. Under favorable weather without any remarks on().A log bookB short/over-loaded cargo listC the mate's receiptD manifest

考题 单选题A ship is responsible for the cargo loaded or unloaded().A only when the cargo is within its railB after the cargo is checked by tallymenC as soon as the cargo loading or unloading beginsD during the time when loading or unloading is going on

考题 单选题液体散货用泵装卸的。()A Liquid cargo is loaded and discharged by pumps.B Liquid cargo is loaded and discharged by tubes.C Liquid bulk cargo is loaded and discharged by tubes.D Liquid bulk cargo is loaded and discharged by pumps.

考题 单选题The tentative cargo plan().A eliminates confusion with the final stowage planB shows the approximate amount of cargo to be loaded in each holdC expedites the total operationD requires an unproportional number of gang hours of work to discharge the cargo

考题 单选题The ()(袋装货) can’t be unloaded by hooks.A bagged cargoB drummed cargoC cased cargoD deck cargo

考题 单选题Liquid bulk cargo is loaded and discharged by ()(泵).A pipesB tubesC bucketsD pumps

考题 单选题The ship will be responsible for the cargo loaded or unloaded().A only when the cargo is within its railB during the time when loading or ynloading is going onC after the cargo is checked by tallymenD as soon as loading or discharging begins

考题 单选题()cargo means to check all cargo loaded into or discharged from a vessel.A TallyingB ExaminingC WeighingD Handling

考题 单选题The additional cargo is to be loaded()board our ship.A onB inC fromD to

考题 单选题Cargo securing for Ro-Ro is based on the concept of().A solid packingB rapid loading and dischargeC vessel loaded full and down to her marksD palletized cargo

考题 单选题()cargo is unloaded by large grain elevators.A GeneralB LiquidC DrybulkD Wet

考题 单选题The most important principle in the stowage is().A to ensure the safety of the ship and protect the cargo from being damagedB to avoid the rearrangement of the cargo loaded on boardC to reject the damaged cargo during loadingD to prevent the spontaneous combustion of coal and grain

考题 单选题The ()(桶装货) should be loaded by cargo net.A bagged cargoB drummed cargoC cased cargoD deck cargo

考题 单选题The()(非包装货) is loaded and discharged by belt conveyer.A non-packed cargoB packed cargoC cased cargoD inboard cargo

考题 单选题The()provides a rapid means of tallying when items of the same commodity are being loaded or unloaded in uniform drafts consisting of an equal number of pieces.A unit methodB block methodC straight methodD package method

考题 单选题The most important principle in the cargo stowage is().A to avoid the rearrangement of the cargo loaded on boardB to ensure the safety of the ship and cargoC to reject the damaged cargo during loading operationD to prevent the spontaneous combustion of the coal and grain

考题 单选题Deadfreight is the charge for the().A carriage of demise cargoB cost of transshipment of over-carried cargoC difference in the amount of cargo loaded and the amount of cargo dischargedD difference in the amount of cargo loaded and the amount of cargo booked,through no fault of the vessel

考题 单选题()cargo is unloaded by huge grabs on cranes or by large grain elevators.A DryB Dry generalC Dry bulkD Liquid