网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
The ()(桶装货) should be loaded by cargo net.
A
bagged cargo
B
drummed cargo
C
cased cargo
D
deck cargo
参考答案
参考解析
解析:
暂无解析
更多 “单选题The ()(桶装货) should be loaded by cargo net.A bagged cargoB drummed cargoC cased cargoD deck cargo” 相关考题
考题
Never______stowed like this.A.optional cargo should beB.should optional cargo beC.should be optional cargoD.optional cargo must be
考题
The tentative cargo plan ________ .A.eliminates confusion with the final stowage planB.shows the approximate amount of cargo to be loaded in each holdC.expedites the total operationD.requires an unproportional number of gang hours of work to discharge the cargo
考题
Deadfreight is the charge for the ______.A.carriage of demise cargoB.cost of transshipment of over-carried cargoC.difference in the amount of cargo loaded and the amount of cargo dischargedD.difference in the amount of cargo loaded and the amount of cargo booked,through no fault of the vessel
考题
Yesterday afternoon 2 cargo surveyors appointed by the consignee came on board for investigation. I told them the cargo was loaded between Aug. 14th. and 16th. Under favorable weather without any remarks on __________.A.log bookB.short/over-loaded cargo listC.the mate’s receiptD.manifest
考题
Your vessel is loaded with nonhygroscopic cargoes and is going from a cold to a warm climate.You should ______.A.Start the exhaust blowersB.Start the intake blowersC.Not ventilate the cargo holdsD.Ventilate the cargo holds
考题
Cargo securing for Ro-Ro is based on the concept of _______.A.Solid packingB.Rapid loading and dischargeC.Vessel loaded full and down to her marksD.Palletized cargo
考题
A bonding cable should be connected for cargo operations aboard a tank vessel as soon as the ______.A.Cargo has been loaded or dischargedB.Cargo hose is connectedC.Cargo pumps are startedD.Vessel is ready to handle cargo
考题
The()(非包装货) is loaded and discharged by belt conveyer.A、non-packed cargoB、packed cargoC、cased cargoD、inboard cargo
考题
单选题()may be laid ready for the cargo or may just be put in bundles ready for the stevedores to lay out as the cargo is loaded.A
WedgeB
DunnageC
ShoreD
Store
考题
单选题Your vessel is loaded with nonhygroscopic cargoes and is going from a cold to a warm climate. You should().A
start the exhaust blowersB
start the intake blowersC
not ventilate the cargo holdsD
ventilate the cargo holds
考题
单选题Yesterday afternoon 2 cargo surveyors appointed by the consignee came on board for investigation. I told them the cargo was loaded between Aug.14th.and 16th. Under favorable weather without any remarks on().A
log bookB
short/over-loaded cargo listC
the mate's receiptD
manifest
考题
单选题A ship is responsible for the cargo loaded or unloaded().A
only when the cargo is within its railB
after the cargo is checked by tallymenC
as soon as the cargo loading or unloading beginsD
during the time when loading or unloading is going on
考题
单选题液体散货用泵装卸的。()A
Liquid cargo is loaded and discharged by pumps.B
Liquid cargo is loaded and discharged by tubes.C
Liquid bulk cargo is loaded and discharged by tubes.D
Liquid bulk cargo is loaded and discharged by pumps.
考题
单选题The tentative cargo plan().A
eliminates confusion with the final stowage planB
shows the approximate amount of cargo to be loaded in each holdC
expedites the total operationD
requires an unproportional number of gang hours of work to discharge the cargo
考题
单选题The ship will be responsible for the cargo loaded or unloaded().A
only when the cargo is within its railB
during the time when loading or ynloading is going onC
after the cargo is checked by tallymenD
as soon as loading or discharging begins
考题
单选题()cargo means to check all cargo loaded into or discharged from a vessel.A
TallyingB
ExaminingC
WeighingD
Handling
考题
单选题Cargo securing for Ro-Ro is based on the concept of().A
solid packingB
rapid loading and dischargeC
vessel loaded full and down to her marksD
palletized cargo
考题
单选题A bonding cable should be connected for cargo operations aboards a tank vessel as soon as the().A
cargo has been loaded or dischargedB
cargo ghose is connectedC
cargo pumps are startedD
vessel is ready to handle cargo
考题
单选题The most important principle in the stowage is().A
to ensure the safety of the ship and protect the cargo from being damagedB
to avoid the rearrangement of the cargo loaded on boardC
to reject the damaged cargo during loadingD
to prevent the spontaneous combustion of coal and grain
考题
单选题The()(非包装货) is loaded and discharged by belt conveyer.A
non-packed cargoB
packed cargoC
cased cargoD
inboard cargo
考题
单选题The most important principle in the cargo stowage is().A
to avoid the rearrangement of the cargo loaded on boardB
to ensure the safety of the ship and cargoC
to reject the damaged cargo during loading operationD
to prevent the spontaneous combustion of the coal and grain
考题
单选题The ()(箱装货) should be handled by cargo tray.A
bagged cargoB
drummed cargoC
cased cargoD
packed cargo
考题
单选题The ()(包装货) is loaded and unloaded by cargo sling.A
bagged cargoB
packed cargoC
cased cargoD
deck cargo
考题
单选题Deadfreight is the charge for the().A
carriage of demise cargoB
cost of transshipment of over-carried cargoC
difference in the amount of cargo loaded and the amount of cargo dischargedD
difference in the amount of cargo loaded and the amount of cargo booked,through no fault of the vessel
考题
单选题There should be at least two tiers of dunnage for the cargo loaded on tank top,the first tier laid().A
to prevent crushing of cargoB
to separate cargoesC
to prevent small containers from hanging up on the upper edgesD
to offer the drainage
热门标签
最新试卷