考题
What IBM resource helps to easily identify a business application that has been validated on IBM Systems?() NOTE:// Solutions that are in this resource represent applications that enable IBM Systems and verify, through customer experience, installing and running in a customer location.A、IBM Standalone Solutions Configuration Tool (SSCT)B、IBM Server ProvenC、IBM System x Reference Sheets (xREF)D、IBM Sizing Guides
考题
The customer has recently installed a pSeries p5-570 with EMC attached disk storage. After installation, the customer complained that the disk access appeared to be too slow. How should the pSeries technical specialist best assist the customer?()A、Recommend the customer call EMC.B、Recommend the customer call IBM hardware support.C、Recommend the customer contact SupportLine.D、Recommend the customer re-creates the volume groups.
考题
A customer has ten RS/6000 Model M80, two pSeries 690 Model 681, five POWER5 510 and two POWER6 560 machines installed and running commercial applications. They want to do a server consolidation study in order to replace the existing systems with POWER7 systems. What performance metric is recommended when evaluating the replacement system?()A、IBM CPWB、IBM rPerfC、SPECint_rate2006D、IDEAS International RPE2
考题
A customer has an existing rack environment with 18 x365 and 2 x255 servers. How can the customer monitor and manage the hardware even if the systems are shut down?()A、Use PC Anywhere over the Ethernet LAN.B、Use RDM and Aurema to manage the systems.C、Connect high-speed modems to each of the systems’ serial ports to use IBM Director.D、Interconnect the Remote Supervisor Adapters II (RSA II) in the x365 servers to the x255 servers.
考题
An existing IBM customer has a few pSeries servers running DB2 on AIX in their environment. The DB2 application contains the database for an order entry application. An xSeries SQL database server replicating from DB2 is added for off-line analysis purposes. The customer wants to know if consolidating the storage and centralized backup is possible. What are the options available to accomplish this?()A、pSeries and xSeries use different file systems. Consolidating Storage and backup is not achievable.B、Consolidation is possible by connecting pSeries local storage to the xSeries SQL server using the IXA adapter.C、Storage consolidation can be achieved by connecting the pSeries and xSeries servers to a common DS4000 storage server.D、Storage consolidation is only achievable when raw file systems are used by the databases and both servers run the same Linux file system (e.g., EXT3 or Reiser).
考题
A customer has recently purchased some IBM x445 servers running Red Hat Enterprise AS 3 and wants to connect them to their existing EMC Clarion SAN controller. Which of the following steps must be taken in order to validate the solution?()A、Download the latest drivers from EMC for Red Hat Advanced Server.B、Ensure that the EMC storage server is configured properly and has the latest firmware levels.C、Verify the equipment is on the ServerProven list and complete a Solution Assurance Review (SAR).D、Ensure that the systems are connected to the EMC SAN controller.
考题
retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere.Which of the following should be discussed with this customer? ()A、Is the web content static or dynamic information B、Consider two servers for redundancy and failover C、What is the average CPU utilization of the existing web servers D、Will the servers need a SCSI or Fibre Channel storage solution
考题
An existing IBM customer has some iSeries servers in their environment. The customer is adding an x366 server with an RSA-II installed for their Microsoft Client/Server applications. The customer wants to consolidate the storage and centralize the backup of the iSeries and xSeries platforms. Which of the following will accomplish this?()A、Share the data over the Ethernet LAN.B、Install the IXA Adapter in the iSeries server.C、Install the IXA Adapter in the xSeries server.D、Attach both servers to an IXS switch.
考题
A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()A、Ensure Director Agent is installed on the new servers.B、Ensure a DHCP Sever is installed and configured in the environment.C、Ensure Server Plus Pack option has been installed and configured.D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.
考题
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()A、The EMC storage specialist has not participated in the TDA meetingB、The FC HBAs are 4 Gbps technologyC、The Technical and Delivery Assessment review actions were not executedD、The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
考题
A customer has two locations that host their pSeries servers. Traffic is being routed through the public Internet. The customer needs to exchange confidential financial data between the servers. Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()A、A DCE domainB、A Kerberos domainC、A PPP tunnel between the serversD、An IPSEC tunnel between the servers
考题
A customer with p615, p630 and p650 pSeries servers installed and running AIX is considering Linux as an additional environment. Which Linux capabilities can the pSeries Sales Specialist present as choices that are available to enhance the existing systems?()A、Linux will be restricted to the p650 system, as it is not supported on the p630.B、The customer can run Linux on all the existing systems with or without the presence of AIX.C、Linux can run in LPARs on the existing systems but Linux will require the presence of AIX in at least one LPAR.D、Linux can be installed on all existing systems but will require the AIX Linux Affinity libraries to boot the systems and run Linux.
考题
A customer is running a number of non-IBM servers purchased two years ago and has settled on one of the new IBM xSeries servers as a migration path. From the following options, which is the preferred migration path?()A、Copy the image of the non-IBM servers and copy that image to the IBM servers, then reboot the IBM servers.B、Copy the image from the non-IBM servers with RDM and install them with IBM Director to the new IBM servers. Reboot the IBM servers.C、Install a fresh operating system using ServerGuide, and then install the applications and copy the data from the old servers.D、Install a fresh operating system on the IBM servers and then run ServerGuide on the IBM servers to migrate the applications and data to the IBM servers.
考题
An HP UNIX server customer running Oracle is interested in knowing more about IBM’s future direction because of the uncertainty of HP hardware platforms changing to Itanium. Which of the following advantages should be communicated as a compelling reason to consider a pSeries server solution?()A、IBM pSeries servers support Oracle on both POWER4 and ItaniumB、AIX has Itanium affinity with any ISV application including OracleC、Oracle and thousands of other ISV applications are already available for AIX on pSeriesD、IBM Data Migration Services can migrate the HP UNIX operating system to a pSeries solution
考题
A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()A、Explain to the customer that they need an additional HMC for the POWER5 system.B、Obtain a PO from the customer to purchase additional serial connections to the HMC.C、Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.D、Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
考题
单选题An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()A
The EMC storage specialist has not participated in the TDA meetingB
The FC HBAs are 4 Gbps technologyC
The Technical and Delivery Assessment review actions were not executedD
The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
考题
单选题An existing IBM customer has some iSeries servers in their environment. The customer is adding an x366 server with an RSA-II installed for their Microsoft Client/Server applications. The customer wants to consolidate the storage and centralize the backup of the iSeries and xSeries platforms. Which of the following will accomplish this?()A
Share the data over the Ethernet LAN.B
Install the IXA Adapter in the iSeries server.C
Install the IXA Adapter in the xSeries server.D
Attach both servers to an IXS switch.
考题
单选题The customer has recently installed a pSeries p5-570 with EMC attached disk storage. After installation, the customer complained that the disk access appeared to be too slow. How should the pSeries technical specialist best assist the customer?()A
Recommend the customer call EMC.B
Recommend the customer call IBM hardware support.C
Recommend the customer contact SupportLine.D
Recommend the customer re-creates the volume groups.
考题
单选题retail company plans to consolidate 180 existing dual processor Xeon servers, all running a web server application on Windows Server 2003. They are planning consolidating to a single x3950 X5 running vSphere.Which of the following should be discussed with this customer? ()A
Is the web content static or dynamic information B
Consider two servers for redundancy and failover C
What is the average CPU utilization of the existing web servers D
Will the servers need a SCSI or Fibre Channel storage solution
考题
单选题A customer is running a number of non-IBM servers purchased two years ago and has settled on one of the new IBM xSeries servers as a migration path. From the following options, which is the preferred migration path?()A
Copy the image of the non-IBM servers and copy that image to the IBM servers, then reboot the IBM servers.B
Copy the image from the non-IBM servers with RDM and install them with IBM Director to the new IBM servers. Reboot the IBM servers.C
Install a fresh operating system using ServerGuide, and then install the applications and copy the data from the old servers.D
Install a fresh operating system on the IBM servers and then run ServerGuide on the IBM servers to migrate the applications and data to the IBM servers.
考题
单选题A customer has two locations that host their pSeries servers. Traffic is being routed through the public Internet. The customer needs to exchange confidential financial data between the servers. Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()A
A DCE domainB
A Kerberos domainC
A PPP tunnel between the serversD
An IPSEC tunnel between the servers
考题
单选题A customer with p615, p630 and p650 pSeries servers installed and running AIX is considering Linux as an additional environment. Which Linux capabilities can the pSeries Sales Specialist present as choices that are available to enhance the existing systems?()A
Linux will be restricted to the p650 system, as it is not supported on the p630.B
The customer can run Linux on all the existing systems with or without the presence of AIX.C
Linux can run in LPARs on the existing systems but Linux will require the presence of AIX in at least one LPAR.D
Linux can be installed on all existing systems but will require the AIX Linux Affinity libraries to boot the systems and run Linux.
考题
单选题An HP UNIX server customer running Oracle is interested in knowing more about IBM’s future direction because of the uncertainty of HP hardware platforms changing to Itanium. Which of the following advantages should be communicated as a compelling reason to consider a pSeries server solution?()A
IBM pSeries servers support Oracle on both POWER4 and ItaniumB
AIX has Itanium affinity with any ISV application including OracleC
Oracle and thousands of other ISV applications are already available for AIX on pSeriesD
IBM Data Migration Services can migrate the HP UNIX operating system to a pSeries solution
考题
单选题A customer is running system management software on one of their Windows xSeries servers, and the software seems to slow down their database application over time. The customer is running IBM Director in their environment. Which IBM Director tool can they utilize to guarantee processor time for the different applications and optimize the server performance?()A
Software RejuvenationB
Capacity ManagerC
Capacity Workload ManagerD
Aurema Application Workload Manager
考题
单选题A customer has an existing rack environment with 18 x365 and 2 x255 servers. How can the customer monitor and manage the hardware even if the systems are shut down?()A
Use PC Anywhere over the Ethernet LAN.B
Use RDM and Aurema to manage the systems.C
Connect high-speed modems to each of the systems’ serial ports to use IBM Director.D
Interconnect the Remote Supervisor Adapters II (RSA II) in the x365 servers to the x255 servers.
考题
单选题The pSeries sales representative has done an excellent job in educating the customer on the benefits of working with IBM. The customer is planning to implement their first ERP application. This new application will be critical to running their business. The customer has only a competitor’s UNIX systemcurrently installed. They are interested in obtaining a proposal from IBM. In addition to the AIX hardware and HACMP software, what else should be included in the IBM proposal for the new ERP solution?()A
I/T services and education to help with the implementation of the hardware and softwareB
A Supportline specialist to work directly with the customer to manage any issues that ariseC
The services required to move the currently installed applications from the competitor’s systems to the IBM systemsD
A slimmed down solution to ensure that the IBM solution is less expensive than the competitor’s solution
考题
单选题A customer has recently purchased some IBM x445 servers running Red Hat Enterprise AS 3 and wants to connect them to their existing EMC Clarion SAN controller. Which of the following steps must be taken in order to validate the solution?()A
Download the latest drivers from EMC for Red Hat Advanced Server.B
Ensure that the EMC storage server is configured properly and has the latest firmware levels.C
Verify the equipment is on the ServerProven list and complete a Solution Assurance Review (SAR).D
Ensure that the systems are connected to the EMC SAN controller.