网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Auxiliary boilers are divided into several classifications, one of which is()
A
fire-tube controlled circulation
B
fire-tube supercritical circulation
C
water-tube natural circulation
D
water-tube express circulation
参考答案
参考解析
解析:
暂无解析
更多 “单选题Auxiliary boilers are divided into several classifications, one of which is()A fire-tube controlled circulationB fire-tube supercritical circulationC water-tube natural circulationD water-tube express circulation” 相关考题
考题
Which is not one of the five classifications of work found in a purchasing operafion?A ManagementB BuyingC Follow-up and expeditingD MarketingE Clerical
考题
Your network consists of a single Active Directory domain.The domain contains more than 300 group objects. The group objects are divided between several regional organizational units (OUs).You need to create a list of all groups that have names that begin with the word Sales.Which command should you use? ()A. Dsget groupB. Dsquery groupC. Netdom queryD. Net group
考题
Classifications of vowels are made up of the followings EXCEPT__________.
A.the. position of the tongue
B.the openness of the mouth
C.the shape of the lip
D.the width of the vowels
考题
Which of the following characteristics applies only to OSPFv3 and not to OSPFv2?()A、Several processes can exist simultaneouslyB、Requires direct connectivity from the backbone area to all other areasC、Has the same packet typesD、Can support multiple subnets on a single linkE、Uses a hierarchical structure divided into areasF、Adjacencies formed with neighbors
考题
船体被甲板和舱壁分隔。()A、The hull is divided by decks and bulwarks.B、The hull is divided by decks and bulkheads.C、The hull is divided by engine room and bulkheads.D、The hull is divided by decks and holds.
考题
甲板分为艏楼甲板,主甲板和艉楼甲板。()A、The deck is divided into forecastle deck, main deck and poop deck.B、The deck is divided into forecastle deck, lower deck and main deck.C、The deck is divided into forecastle deck, main deck and lower deck.D、The deck is divided into main deck, lower deck and poop deck.
考题
Which options must you configure while performing an automated Tablespace Point-in-Time Recovery (TSPITR) by using Recovery Manager (RMAN)?()A、New channels for restore and recovery tasksB、New name for the data files of the tablespaceC、Auxiliary name for the data files of the tablespaceD、Auxiliary destinations for an auxiliary set of data files
考题
Your network consists of a single Active Directory domain. The domain contains more than 300 group objects. The group objects are divided between several regional organizational units (OUs). You need to create a list of all groups that have names that begin with the word Sales. Which command should you use? ()A、Dsget groupB、Dsquery groupC、Netdom queryD、Net group
考题
DWDM全称为()。A、dense wavelength division multiplexingB、dense waveguide division multiplexingC、divided wavelength dimension multiplexingD、divided waveguide dimension mode
考题
单选题Your network contains a Windows Server Update Services (WSUS) server.You need to ensure that the WSUS server automatically downloads service packs. What should you do first?()A
From the Automatic Approvals options, modify the Update Rules list.B
From the Automatic Approvals options, modify the Advanced settings.C
From the Products and Classifications options, modify the Products settings.D
From the Products and Classifications options, modify the Classifications settings.
考题
单选题船体被甲板和舱壁分隔。()A
The hull is divided by decks and bulwarks.B
The hull is divided by decks and bulkheads.C
The hull is divided by engine room and bulkheads.D
The hull is divided by decks and holds.
考题
单选题甲板分为艏楼甲板,主甲板和艉楼甲板。()A
The deck is divided into forecastle deck, main deck and poop deck.B
The deck is divided into forecastle deck, lower deck and main deck.C
The deck is divided into forecastle deck, main deck and lower deck.D
The deck is divided into main deck, lower deck and poop deck.
考题
单选题Boilers and cylinders are().A
raw metallic productsB
finished metallic productsC
consumable productsD
Manufactured goods of large Size
考题
单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A
remove suspended and precipitated solids from the boiler waterB
completely drain the boiler in an emergency situationC
prevent hardened scale deposits in the water drumD
remove floating impurities from the oily water surface
考题
单选题Which command would correctly start a TSPITR of the USERS tablespace?()A
recover tablespace users until time ,,10/06/2008:22:42:00 auxiliary ,,c/oracle/auxiliaryB
recover tablespace users time ,,10/06/2008:22:42:00 auxiliary destination ,,c:/oracle/auxiliary; time ,, 10/06/2008:22:42:00 auxiliary destination ,,c/oracle/auxiliaryC
recover tablespace users to point-in.D
recover tablespace users except time ,,10/06/2008:22:42:00 auxiliary destination ,,c:/oracle/auxiliaryE
recover tablespace users until time ,,10/06/2008:22:42:00 auxiliary destination ,,c:/oracle/auxiliary
考题
单选题What is the holding power ratio of an anchor? ()A
Maximum mooring line tension divided by the anchor's weight in airB
Anchor's weight in air divided by the maximum mooring line tensionC
Preloading tension divided by the anchor's weight in airD
Operating tension divided by the anchor's weight in air
考题
单选题Which options must you configure while performing an automated Tablespace Point-in-Time Recovery (TSPITR) by using Recovery Manager (RMAN)?()A
New channels for restore and recovery tasksB
New name for the data files of the tablespaceC
Auxiliary name for the data files of the tablespaceD
Auxiliary destinations for an auxiliary set of data files
考题
单选题Starting air for auxiliary engines may be taken directly from the main reservoirs or through ().A
an auxiliary reservoirB
a controlling air bottleC
an emergency air compressorD
a main air compressor
考题
单选题The procedures recommended for auxiliary boilers having high salinity include ().A
treating with oxygen scavengersB
securing the boiler and giving it a blowing downC
increasing the pHD
reducing the phosphate level
考题
单选题Auxiliary boilers can be classified as()A
water-tube natural circulation boilersB
fire-tube boilersC
water-tube forced circulation boilersD
all of the above
考题
单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A
completely drain the boiler in an emergencyB
prevent sludge from forming in the drumC
remove floating impurities from the boiler water surfaceD
remove settled solids from the water drum
考题
单选题Who is in charge of the auxiliary boilers?()A
The chief engineerB
The second engineerC
The third engineerD
The fourth engineer
考题
单选题船体被划分为一系列水密隔舱。()A
The hull is divided into a number of watertight compartments.B
The hull is divided into a number of gastight compartments.C
The hull is divided into a number of water compartments.D
The hull is divided into a number of tight compartments.
考题
单选题An auxiliary reservoir for starting auxiliary engines should be kept at ().A
low pressure at all timesB
full pressure at all timesC
low pressure at intermittenceD
full pressure at intermittence
考题
单选题Several agencies divided the donated clothes ______ themselves in order to give them to the needy people.A
withinB
insideC
throughD
among
热门标签
最新试卷