网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Bottom blow valves are installed on auxiliary water-tube boilers to ()
A

completely drain the boiler in an emergency

B

prevent sludge from forming in the drum

C

remove floating impurities from the boiler water surface

D

remove settled solids from the water drum


参考答案

参考解析
解析: 暂无解析
更多 “单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A completely drain the boiler in an emergencyB prevent sludge from forming in the drumC remove floating impurities from the boiler water surfaceD remove settled solids from the water drum” 相关考题
考题 The correct procedure for giving an auxiliary boiler a bottom blow, is to begin .A.when the boiler has been secured long enough for most solids to settleB.when the boiler has been cooled to ambient temperatureC.only after raising the water level to within 0.5 inch of the high water cutout onlyD.after bypassing the low pressure

考题 The system of valves and cargo lines in the bottom piping network of a tanker that connects one section of cargo tanks to another section is called a ______.A.come-alongB.crossoverC.manifoldD.runaround

考题 When installing a server in a rack, which of the following locations describes where in the rack a server should be installed?()A、On the very bottom U of the rack, with the UPS above the serverB、In the middle of the rack to help balance the rackC、Closest to the bottom of the rack, above heavier equipmentD、On the very top U of the rack, with the UPS directly below it

考题 单选题The concentration of total dissolved solids in the water of an auxiliary boiler can increase as a result of ().A seawater contaminationB frequent surface blowsC dissolved oxygen deaerationD frequent bottom blows

考题 单选题The purpose of the safety relief valves installed on an auxiliary boiler is to ().A relieve excess fuel oil pressure during the “off” fire cycleB admit water to the dry pipeC throttle the forced draft fan output for proper combustionD reduce excess steam pressure in the boiler

考题 单选题Blow-off of the relief valves of the main cylinders during operation indicates ().A the cylinder cover is crackedB the injector holes is cloggedC the cams are not properly setD fuel pump is leaking

考题 单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()A The safety valve escape piping should be disconnected from the valve body and a blank insertedB The boiler vent valves should be openedC All hand-hole/manhole covers should be tightened up as much as possible to preclude any leaksD All of the above

考题 单选题In the event of a flame failure in an auxiliary water-tube boiler, you must()A relight the boiler immediately to prevent loss of steam pressureB relight the fire off the brickwork as the bricks are cherry redC purge the furnace of any combustible gases before attempting to relight the fireD speed up the feed pump to prevent dry firing when the burner flame is reestablished

考题 单选题The rate of heat transfer in a water-tube auxiliary boiler can be increased by ().A operating the boiler at less than normal water levelB installing fins on the firesides of water-tubesC increasing the amount of excess air to the burnersD treating the boiler water with chemical oxygen scavengers

考题 单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()A The safety valve escape piping should be disconnected from the valve body and a blank insertedB The boiler vent valves should be openedC All handhole/manhole covers should be tightened up as much as possible to preclude any leaksD All of the above

考题 单选题The correct procedure for giving an auxiliary boiler a bottom blow, is to begin()A when the boiler has been secured long enough for most solids to settleB when the boiler has been cooled to ambient temperatureC only after raising the water level to within 0~5 inch of the high water cutout onlyD after bypassing the low pressure

考题 单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A remove suspended and precipitated solids from the boiler waterB completely drain the boiler in an emergency situationC prevent hardened scale deposits in the water drumD remove floating impurities from the oily water surface

考题 单选题The donkey boiler may be given a bottom blow ()A to raise water levelB only while making steamC to remove scumD when fire are secured

考题 单选题Which of the following items isn’t belonging to Docking survey?()A Examination of the shell including bottom, side and bow platingB Examination of sea suctions, overboard discharging valves and sea chestsC Load testing of lifeboat launching devicesD Poker gauge of propeller shaft taken

考题 单选题Blow-off of the relief valves of the engines cylinders may be caused by ().A too low leadB water in fuelC too tight springD leakage

考题 单选题Excessive valve lash in an auxiliary diesel engine will cause the valves to open()A later and close soonerB sooner and close laterC sooner and close soonerD later and close later

考题 单选题The clearance volume for a single stage compressor is defined as the space created between the ().A top of the piston and bottom side of head, with the piston at BDCB piston and head, including the space around the piston to the top of the upper ring and under the valves, with the piston at TDCC bottom of the piston and bottom side of the head at TDC, regardless of upper ring location and valve placementD top of the piston and bottom side of the head at TDC as compared to that which exists between the top of the piston and bottom side of head at BDC

考题 单选题Which of the following actions should normally be taken during each watch when the auxiliary boilers is in operation?()A clean the flame scanner photocell windowB Inspect and clean all solenoid valvesC lift the safety valves by handD Inspect for oil or water leaks

考题 单选题Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()A double bottom fuel oil tank temperatureB heater supply steam flowC pressure of the fuel supplied to the burnersD attemperator steam flow in the heater discharge circuit

考题 单选题A compound gauge is typically installed on the ().A suction side of a bilge pumpB exhaust manifold of an auxiliary dieselC discharge line from an air compressorD chemical feed tank of an evaporator

考题 单选题The exhaust valve opens before bottom dead center in a four stroke engine to() Ⅰ.allow for blow down Ⅱ.Reduce pumping lossesA Ⅰ onlyB Ⅱ onlyC both Ⅰ and ⅡD neither Ⅰ nor Ⅱ

考题 单选题Starting air valves are held firmly on their seats by()A cam rollers on the camshaftB spring forceC air pressure on top of the valve differential pistonD air pressure on the bottom of the valve differential piston

考题 单选题If an auxiliary diesel engine frequently stalls, the trouble may be caused by ()A low exhaust back pressureB air in the fuel systemC gasket blow-by or leakageD incorrect assembly of idler springs

考题 单选题Which of the following conditions can cause above normal air temperature to develop in the intake manifold of a four-stroke/cycle turbo-charged diesel engine?()A Clogged air intake faltersB Piston blow-byC A defective after-coolerD Faulty exhaust valves

考题 单选题Temperature control valves installed in the jacket cooling water system of a diesel engine modulates the rate of water flow through the ().A cooling water pumpB nozzle cooling passagesC cylinder jacketsD heat exchanger

考题 单选题If an operating auxiliary boiler has a water pH reading of 7, you should ().A bottom blow the boilerB treat the water with caustic sodaC treat the water with chemical scavengersD reduce the water alkalinity to recommended readings

考题 单选题Which action should be taken when an auxiliary boiler in is operation?()A Clean all electrical connectionsB Lift the relief valves by handC Inspect and clean all solenoid valvesD Inspect for oil and water leaks