网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A continuous watertight bulkhead on a ship is normally also a(n)().
A

structural bulkhead

B

exterior bulkhead

C

centerline bulkhead

D

joiner bulkhead


参考答案

参考解析
解析: 暂无解析
更多 “单选题A continuous watertight bulkhead on a ship is normally also a(n)().A structural bulkheadB exterior bulkheadC centerline bulkheadD joiner bulkhead” 相关考题
考题 The emergency signal for fires is sounded on the ship’s whistle and general alarm as _____.A.a continuous ringing for 10 secondsB.one short ring followed by one long ringC.two long rings of at least 20 secondsD.a continuous ringing until the fire is extinguished

考题 The captain of a ship can be also calledA.masterB.agentC.ship ownerD.pilot

考题 A ship having continuous closely spaced transverse strength members is ______.A.longitudinally framedB.transversely framedC.cellular framedD.web framed

考题 In order to withstand fluid head pressure on a ship,stiffeners are often attached to the bulkhead ______.A.penetrationsB.platingC.framingD.brackets

考题 When shoring a damaged bulkhead,effort should be taken to spread the pressure over the ______.A.maximum possible areaB.minimum possible areaC.nearest watertight doorD.nearest longitudinal girder

考题 A continuous watertight bulkhead is normally also a(n)______.A.Structural bulkheadB.Exterior bulkheadC.Centerline bulkheadD.Joiner bulkhead

考题 Regulations define the bulkhead deck as ______.(subdivision and stability regulations)A.any deck extending from stem to sternB.the uppermost deck to which transverse watertight bulkheads extendC.the lowermost deck to which transverse watertight bulkheads extendD.the uppermost complete deck

考题 The captain of a ship can be also called () .A、masterB、agentC、ship ownerD、pilot

考题 The ship’s centerline is the ()(龙骨).A、frameB、bulwarkC、keelD、bulkhead

考题 单选题On a ship,watertight doors should be operated().A during abandon drillB during fire drillC weeklyD when the rig is being moved

考题 单选题The downflooding angle for a ship is the minimum angle at which().A the load line becomes submergedB a non-watertight opening is at still water levelC offset becomes excessiveD reserve buoyancy is a maximum

考题 单选题A ship having continuous closely spaced transverse strength members is().A longitudinally framedB transversely framedC cellular framedD web framed

考题 单选题In order to withstand fluid head pressure on a ship,stiffeners are often attached to the bulkhead().A penetrationsB platingC framingD brackets

考题 单选题Progressive flooding is controlled by securing watertight boundaries and().A transferring water ballastB jettisoning cargoC pumping out flooded compartmentsD abandoning ship

考题 单选题Progressive flooding on a ship is controlled by securing watertight boundaries and().A transferring drill waterB dumping bulk materialsC pumping out flooded compartmentsD evacuating the unit

考题 单选题Reserve buoyancy is().A also called GMB the void portion of the ship below the waterline which is enclosed and watertightC affected by the number of transverse watertight bulkheadsD the watertight portion of a vessel above the waterline

考题 单选题Fibers of hair and wool are not continuous and must normally be spun into thread when woven into textile fabrics.A as are theyB when to beC that they areD if they are to be

考题 单选题Horizontal subdivision decks forming watertight compartments in the columns of a semisubmersible ship increase the unit’s().A tank capacitiesB stability in the event of damageC towing speedD anchor holding ratio

考题 单选题Structural bulkheads on a ship are usually().A continuousB watertightC transverseD non-watertight

考题 单选题In case a ship is in emergency or distress in any of 4 areas, it is required to use the continuous()alert.A MF/HFB SARTC EPIRBD any of A, B, C

考题 单选题The emergency signal for fires is sounded on the ship’s whistle and general alarm as().A a continuous ringing for 10 secondsB one short ring followed by one long ringC two long rings of at least 20 secondsD a continuous ringing until the fire is extinguished

考题 单选题When shoring a damaged bulkhead,effort should be taken to spread the pressure over the ().A maximum possible areaB minimum possible areaC nearest watertight doorD nearest longitudinal girder

考题 单选题The objective of shoring a damaged bulkhead is to().A force the warped, bulged, or deformed sections back into placeB support and hold the area in the damaged positionC withstand subaequent additional damagedD make a watertight seal at the damaged area

考题 单选题A continuous watertight bulkhead is normally also a (n)().A structural bulkheadB exterior bulkheadC certerline bulkheadD joiner bulkhead

考题 单选题Your ship has run aground and it is necessary to determine whether or not a compartment has floodedTherefore, you should ().A open the watertight door and take a quick lookB open the hatch dogs on the side away from the hingesC tap the bulkhead with a hammer to check for a water levelD feel the bulkhead to see if it is hot

考题 单选题Container-ship capacity is normally expressed in().A deadweight tonsB measurement tonsC displacement tonsD TEU

考题 单选题Right at the top is()It is 300 mm long and 25 mm wide with its upper edgs in line with the uppermost continuous watertight deck.A the deck lineB Plimsoll discC Plimsoll lineD sunmmer load line