Refer to the following architectures, which one is able to supply a core infrastructure so that customers can capitalize quickly with the change of business requirements?()
A
Branch
B
Campus
C
Teleworker
D
Data center
参考答案
参考解析
解析:
暂无解析
更多 “单选题Refer to the following architectures, which one is able to supply a core infrastructure so that customers can capitalize quickly with the change of business requirements?()A BranchB CampusC TeleworkerD Data center” 相关考题
考题
By which means is a contractor able to control cost overruns due to changing requirements?A Project data reviewB Change orderC Purchase order amendmentD Change controlE None of the above.
考题
139 By which means is a contractor able to control cost overruns due to changing requirements? A. Project data reviewB. Change orderC. Purchase order amendmentD. Change controlE. None of the above
考题
Investment is freely transferable, which means one owner can sell his ownership interests to an ________ without a change in the nature of the business.
A.investorB.personC.ownerD.outsider
考题
After a server has been installed into a rack, an administrator must ensure which of the following?()
A. Warm air flow is permitted through the front bezelB. The system is labeled so that it can be identifiedC. Verify the change control process can be implementedD. Determine the correct power requirements
考题
Which architecture provides a core infrastructure that allows customers to capitalize rapidly onchanging business requirements? ()
A. data centerB. campusC. branchD. teleworker
考题
Which of the following is a characteristic of a data center core?()
A. Server-to-server traffic always remains in the core layer.B. The recommended practice is for the core infrastructure to be in Layer 3.C. The boundary between Layer 2 and Layer 3 should be implemented in the aggregation layer.D. The Cisco Express Forwarding hashing algorithm is the default, based on the IP address and Layer 4 port.E. Core layer should run BGP along with an IGP becauseiBGP has a lower administrative distance than any IGP.
考题
It is useful to be able to predict the extent ___________ which a price change will affect supply and demand.A.from
B.with
C.to
D.for
考题
After creating backups of critical system and user data, which of the following is the BEST location to store the backups?()A、In the supply closet so anyone can access them if neededB、Near the server for easy access to restore filesC、Locked in a cabinet in the IT Manager’s officeD、At a secure off-site storage facility
考题
What is one key objective of the operations readiness assessment performed in the plan phase?Select exactly 1 answer(s) from the following:()。A、align business requirements with technical requirementsB、create a plan to recycle used equipmentC、evaluate the readiness of a customers current operations and network management infrastructure to support a new technologyD、install and test system components in a non-production environment
考题
Which architecture provides a core infrastructure that allows customers to capitalize rapidly onchanging business requirements? ()A、data centerB、campusC、branchD、teleworker
考题
Which prepare phase service component involves recommending an appropriate technology that will address a customers business requirements? Select exactly 1 answer(s) from the following:()。A、Technology Strategy DevelopmentB、Account Qualification and PlanningC、Business Case DevelopmentD、Proof of Concept
考题
Which is the most accurate statement regarding the business requirements development service component in the prepare phase. Select exactly 1 answer(s) from the following:()。A、Determine the appropriate cooling temperature for a customers server roomB、Analyze the customers business requirements for a proposed solutionC、Analyze a customers ongoing operational requirementsD、Identify a customers technology requirements
考题
Which service component within the prepare phase recommends the appropriate technology strategy to address a business requirement of the customer? Select exactly 1 answer(s) from the following:()。A、identifying what a customer requires from a proposed solutionB、analyzes the customers business requirements and recommends the appropriate Cisco technologies to meet business requirementsC、determining what end-user training a customer requiresD、addressing a customer’s physical requirements
考题
Refer to the following architectures, which one is able to supply a core infrastructure so that customers can capitalize quickly with the change of business requirements?()A、BranchB、CampusC、TeleworkerD、Data center
考题
After a server has been installed into a rack, an administrator must ensure which of the following?()A、Warm air flow is permitted through the front bezelB、The system is labeled so that it can be identifiedC、Verify the change control process can be implementedD、Determine the correct power requirements
考题
A customer requires an infrastructure to support disaster recovery of critical applications between two remote data centers. One data center is in Tokyo and one is in Beijing. The customer’s Recovery Point Objective (RPO) requires a six-hour window for a bandwidth of 100 MB/s and a new storage system for a total of 4 TB of data. They estimate 100 MB of new data produced hourly. What data synchronization method would be recommended to meet the requirements()A、Metro MirrorB、FlashCopyC、Global MirrorD、Snapshot
考题
单选题Which service component within the prepare phase recommends the appropriate technology strategy to address a business requirement of the customer? Select exactly 1 answer(s) from the following:()。A
identifying what a customer requires from a proposed solutionB
analyzes the customers business requirements and recommends the appropriate Cisco technologies to meet business requirementsC
determining what end-user training a customer requiresD
addressing a customer’s physical requirements
考题
单选题After creating backups of critical system and user data, which of the following is the BEST location to store the backups?()A
In the supply closet so anyone can access them if neededB
Near the server for easy access to restore filesC
Locked in a cabinet in the IT Manager’s officeD
At a secure off-site storage facility
考题
单选题Which of the following is a characteristic of a data center core?()A
Server-to-server traffic always remains in the core layer.B
The recommended practice is for the core infrastructure to be in Layer 3.C
The boundary between Layer 2 and Layer 3 should be implemented in the aggregation layer.D
The Cisco Express Forwarding hashing algorithm is the default, based on the IP address and Layer 4 port.E
Core layer should run BGP along with an IGP becauseiBGP has a lower administrative distance than any IGP.
考题
单选题An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center. Which of the following site types should be considered to meet these requirements? ()A
Hot siteB
Warm siteC
Cold siteD
Active failover site
考题
单选题After a server has been installed into a rack, an administrator must ensure which of the following?()A
Warm air flow is permitted through the front bezelB
The system is labeled so that it can be identifiedC
Verify the change control process can be implementedD
Determine the correct power requirements
考题
单选题Refer to the following architectures, which one is able to supply a core infrastructure so that customers can capitalize quickly with the change of business requirements?()A
BranchB
CampusC
TeleworkerD
Data center
考题
单选题What is one key objective of the operations readiness assessment performed in the plan phase?Select exactly 1 answer(s) from the following:()。A
align business requirements with technical requirementsB
create a plan to recycle used equipmentC
evaluate the readiness of a customers current operations and network management infrastructure to support a new technologyD
install and test system components in a non-production environment
考题
单选题Which architecture provides a core infrastructure that allows customers to capitalize rapidly onchanging business requirements? ()A
data centerB
campusC
branchD
teleworker
考题
单选题A customer requires an infrastructure to support disaster recovery of critical applications between two remote data centers. One data center is in Tokyo and one is in Beijing. The customer’s Recovery Point Objective (RPO) requires a six-hour window for a bandwidth of 100 MB/s and a new storage system for a total of 4 TB of data. They estimate 100 MB of new data produced hourly. What data synchronization method would be recommended to meet the requirements()A
Metro MirrorB
FlashCopyC
Global MirrorD
Snapshot
考题
单选题Which prepare phase service component involves recommending an appropriate technology that will address a customers business requirements? Select exactly 1 answer(s) from the following:()。A
Technology Strategy DevelopmentB
Account Qualification and PlanningC
Business Case DevelopmentD
Proof of Concept
考题
单选题Which of the following is a characteristic of a data center core?()A
Server-to-server traffic always remains in the core layer.B
The recommended practice is for the core infrastructure to be in Layer 3.C
The boundary between Layer 2 and Layer 3 should be implemented in the aggregation layer.D
The Cisco Express Forwarding hashing algorithm is the default, based on the IP address andLayer 4 port.E
Core layer should run BGP along with an IGP because iBGP has a lower administrativedistance than any IGP.
考题
单选题Which is the most accurate statement regarding the business requirements development service component in the prepare phase. Select exactly 1 answer(s) from the following:()。A
Determine the appropriate cooling temperature for a customers server roomB
Analyze the customers business requirements for a proposed solutionC
Analyze a customers ongoing operational requirementsD
Identify a customers technology requirements