单选题
You are attempting to parallel two AC generators and the synchroscope pointer is revolving in the slow directionThis indicates that the frequency of the incoming machine is ().
A
higher than the bus frequency
B
lower than the bus freouencv
C
the same as the bus frequency but out of phase with it
D
the same as the bus frequency, and the circuit breaker may be closed at any pointer position
参考答案
参考解析
解析:
暂无解析
更多 “单选题You are attempting to parallel two AC generators and the synchroscope pointer is revolving in the slow directionThis indicates that the frequency of the incoming machine is ().A higher than the bus frequencyB lower than the bus freouencvC the same as the bus frequency but out of phase with itD the same as the bus frequency, and the circuit breaker may be closed at any pointer position” 相关考题
考题
( ) can provide an asynchronous link between two ac electric power system with different nominal frequencies.
A.The HVDC (high voltage DC) transmissionB.The EHV (extra-high voltage) AC transmissionC.The AC distributionD.Generators
考题
You are attempting to parallel two AC.generators, and the synchroscope pointer revolving in the fast direction.This indicates that the frequency of the incoming machine is
A.higher than the bus equencyB.lower than the bus equencyC.the same as the bus frequency but out of phase with itD.same as the bus frequency and the circuit breaker may be closed at
考题
You upgrade your Oracle database in a multiprocessor environment. As a recommended you execute thefollowing script:SQL > @utlrp.sqlWhich two actions does the script perform?()
A. Parallel compilation of only the stored PL/SQL codeB. Sequential recompilation of only the stored PL/SQL codeC. Parallel recompilation of any stored PL/SQL codeD. Sequential recompilation of any stored PL/SQL codeE. Parallel recompilation of Java codeF. Sequential recompilation of Java code
考题
You are attempting to parallel two AC generators and the synchroscope pointer is revolving in the slow direction. This indicates that the frequency of the incoming machine isA.higher than the bus frequencyB.lower than the bus frequencyC.file same as file bus frequency but out of phase with itD.the same as the bus frequency, and the circuit breaker may be closed at nay pointer position
考题
While paralleling two AC generators using synchronizing lamps only, both lamps will go dark when the generators are______.A.running at the same speedB.groundedC.of the same polarityD.in phase
考题
The load sharing characteristics of two diesel generators operating in parallel are mostly dependent on their governor ______.A.load limit settingsB.idle speed settingsC.speed limit settingsD.speed droop settings
考题
When attempting an upstream landing while pushing empty barges ahead in a hard onshore wind,the approach is best made ______.A.With bow out,stern inB.With bow in,stern outC.Parallel to the dock,as close in as possibleD.Parallel to the dock,as far out as possible
考题
Which data synchronization options between two geographical locations are supported by PowerHA SystemMirror?()A、Parallel and SerialB、Serial and AsynchronousC、Parallel and SynchronousD、Synchronous and Asynchronous
考题
Which two types of attacks are considered to be denial of service?() (Choose two.)A、zombie agentsB、SYN floodC、IP packet fragmentsD、WinNuke
考题
You are managing an Oracle Database 11g database. You want to take the backup of MULT_DATA, a big file tablespace of size 100 TB on tape drive, but you have tapedrives of only 10 GB each. Which method would accomplish the task quickly and efficiently?() A、 parallel image copy backupB、 backup with MAXPIECESIZE configured for the channelC、 parallel backup with MAXPIECESIZE configured for the channeD、 intrafile parallel backup
考题
You upgrade your Oracle database in a multiprocessor environment. As a recommended you execute thefollowing script:SQL @utlrp.sqlWhich two actions does the script perform?()A、Parallel compilation of only the stored PL/SQL codeB、Sequential recompilation of only the stored PL/SQL codeC、Parallel recompilation of any stored PL/SQL codeD、Sequential recompilation of any stored PL/SQL codeE、Parallel recompilation of Java codeF、Sequential recompilation of Java code
考题
单选题The division of the kilowatt load between two AC generators operating in parallel is controlled by the settings and characteristics of the ().A
voltage regulatorsB
field rheostatsC
reverse power relaysD
prime mover governors
考题
单选题Which is a function of the voltage regulators used with AC generators?()A
To cut out generators when they are no longer requiredB
To cut in additional generators automatically as requiredC
To divide the KW load equally between generators operating in parallelD
To divide reactive current between generators operating in parallel
考题
单选题While paralleling two AC generators using synchronizing lamps only, both lamps will go dark when the generators are ().A
running at the same speedB
groundedC
of the same polarityD
in phase
考题
单选题You are managing an Oracle Database 11g database. You want to take the backup of MULT_DATA, a big file tablespace of size 100 TB on tape drive, but you have tapedrives of only 10 GB each. Which method would accomplish the task quickly and efficiently?()A
parallel image copy backupB
backup with MAXPIECESIZE configured for the channelC
parallel backup with MAXPIECESIZE configured for the channeD
intrafile parallel backup
考题
单选题A host is attempting to send data to another host on a different network. What is the first action that the sending host will take?()A
Drop the data.B
Send the data frames to the default gateway.C
Create an ARP request to get a MAC address for the receiving host.D
Send a TCP SYN and wait for the SYN ACK with the IP address of the receiving host.
考题
单选题When measuring AC current flow, you must always connect the meter ()A
in series with the power source and loadB
in parallel with the power source and loadC
insuring correct polarityD
using the lowest range possible to prevent instrument damage
考题
单选题You are docking a vessel starboard side to with the assistance of two tugs.You are attempting to hold the vessel off by operating both tugs at right angles to the vessel and at full power.You must ensure that().A
steerageway is not taken offB
the bow doesn't close the dock firstC
the bow closes the dock firstD
the ship has no headway at the time
考题
单选题When two AC generators are being paralleled, the breaker should be closed with the synchroscope pointer mating in the ()A
slow direction, just before the 12 o'clock positionB
fast direction, just after the 12 o'clock positionC
fast direction, just before the 12 o'clock positionD
slow direction, just after the 12 o'clock position
考题
单选题When paralleled, AC generators must have the same ()A
frequencyB
number of phasesC
phase rotationD
All of the above
考题
单选题When two DC generators operate in parallel, they are protected against motorizing by()A
blow out coilsB
governor relayC
under voltage tripsD
reverse current trips
考题
单选题If two AC generators are to be operated in parallel, the load is distributed evenly by()A
means of rheostat the governor settingsB
a balance coil excitationC
adjusting the governor settingsD
changing excitation
考题
单选题You are attempting to parallel two AC generators, and the syncope pointer is revolving in the fast directionThis indicates that the frequency of the incoming machine is ().A
higher than the bus frequencyB
lower than the bus frequencyC
the same as the bus frequency but out of phase with itD
the same as the bus frequency and the circuit breaker may be closed at any pointer position
考题
单选题If two AC generators are operated in parallel, the load is distributed evenly by()A
a rheostatB
a balancing coilC
changing field excitationD
adjusting the governor settings
考题
单选题If two A.C.generators are to be operated in parallel, the load is distributed evenly by()A
means of rheostat the governor settingsB
a balance coil excitationC
adjusting the governor settingsD
changing excitation
考题
单选题Prior to closing the breaker when paralleling two AC generators, the recommended practice is to have the frequency of the incoming machine ()A
slightly less than the line frequencyB
the same as the line frequencyC
slightly greater than the line frequencyD
All of the above
考题
单选题When paralleling two AC generators, the frequency of the machine coming on-line, immediately prior to closing its breaker, should be ()A
slightly less than the oncoming generator frequencyB
the same as the bus frequencyC
slightly greater than the bus frequencyD
the same as the bus voltage