网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
A system must be upgraded from AIX 5.1 to 5.2. Which of the following scheduling processes should be performed? ()
A
Schedule enough down time to backup, upgrade and reboot.
B
Backup, upgrade, then schedule enough down time to reboot the system.
C
Backup, then schedule enough down time to upgrade and reboot the system.
D
No scheduling processes are necessary because no down time is required.
参考答案
参考解析
解析:
暂无解析
更多 “单选题A system must be upgraded from AIX 5.1 to 5.2. Which of the following scheduling processes should be performed? ()A Schedule enough down time to backup, upgrade and reboot. B Backup, upgrade, then schedule enough down time to reboot the system. C Backup, then schedule enough down time to upgrade and reboot the system. D No scheduling processes are necessary because no down time is required.” 相关考题
考题
Companycom has a system running AIX 5.2 and wants to upgrade to AIX 5.3. What method would provide the quickest recovery if the upgrade failed?()A、Use alt_disk_installB、Backup image to NIM serverC、Backup using mksysb to DVD-RAMD、Apply the upgrade and do not commit
考题
During a routine maintenance visit to a client, an administrator noticed that the last full backup did not complete. Which of the following should the administrator do FIRST?()A、Schedule and perform an incremental backup as soon as possible.B、Inspect backup report logs.C、Schedule and perform a full backup as soon as possible.D、Inspect alert notification settings.
考题
You are the network administrator for All servers run Windows Server 2003. You are creating a backup schedule for the main file server. You need to create a schedule so that backup jobs are completed in the shortest amount of time possible. What should you do?()A、Schedule a normal backup every Sunday. Schedule incremental backups every Monday through Saturday.B、Schedule a normal backup every Sunday. Schedule differential backups every Monday through Saturday.C、Schedule a copy backup every day.D、Schedule a normal backup every day.
考题
An administrator is planning an upgrade of a major software package on an application server.The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()A、Identify necessary operating system updatesB、Implement the changeC、Document the changeD、Schedule system down time
考题
A system must be upgraded from AIX 5.1 to 5.2. Which of the following scheduling processes should be performed? ()A、 Schedule enough down time to backup, upgrade and reboot. B、 Backup, upgrade, then schedule enough down time to reboot the system. C、 Backup, then schedule enough down time to upgrade and reboot the system. D、 No scheduling processes are necessary because no down time is required.
考题
A system administrator completed an upgrade of the maintenance level of their AIX system. Which of the following commands should be run to verify that the operating system is in a consistent state?()A、instfix -iB、lslpp -lC、lppchk -vD、oslevel -r
考题
In order to upgrade from AIX Version 4.3 to AIX Version 5.2, which of the following actions should be performed?()A、Run smit update_allB、Run smit install_allC、Boot from the installation mediaD、Run update_all from the mounted CD
考题
A system administrator needs to quickly migrate a machine from AIX 5.1 to AIX 5.2. The administrator will only be allowed enough downtime to reboot the machine. Which installation method should be used to accomplish this task?()A、Perform a migration installation during the reboot process.B、Perform an alternate disk installation and migration using NIM.C、Copy the /usr directory from another 5.2 server to this server.D、Perform an update_all install from 5.2 media to take effect on reboot.
考题
A system was running properly until a reboot. Following the reboot, the system LED displayed cycles between 0223 and 0229. Which of the following procedures should be performed next?()A、Power down then power up the systemB、Boot into diagnostic mode and run fsckC、Boot from installation media and run bosbootD、Boot into maintenance mode and check the bootlist
考题
A system administrator needs to upgrade the Oracle database from Version 7 to Version 8. Which of the following scheduling concerns should be considered?()A、Schedule enough down time to backup, upgrade and reboot. B、Backup, upgrade, then schedule enough down time to reboot the system.C、Backup, then schedule enough down time to upgrade and reboot the system. D、There are no scheduling concerns because no down time is required.
考题
A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS. Which of the following must be completed prior to this migration ()A、Upgrade system firmware to latest levelB、Upgrade to AIX 5.3C、Upgrade HMC to version 6.1D、Convert rootvg filesystems to JFS2
考题
A customer has a pSeries that needs to be upgraded from AIX Version 5.1 to AIX Version 5.2. The customer wants to retain /etc/passwd. Which of the following installation types should be used?()A、Preservation InstallB、Retention InstallC、Overwrite InstallD、Migration Install
考题
A System p administrator needs to upgrade a system from AIX 5.2 to AIX 5.3. Which of the following installation methods would minimize downtime()A、Migration installationB、Partition MobilityC、alt_disk_installD、update_all smit fastpath and reboot during the next scheduled outage
考题
A production system needs to be upgraded from AIX V5.1 to AIX V5.2. All logs and users need to be saved. Which installation method will accomplish the upgrade?()A、Update InstallationB、Migration InstallationC、Preservation InstallationD、New and Complete Overwrite Installation
考题
The System Administrator wants to do a backup of the HMC and notices that there are two options on the HMC menu: Backup Critical Console data and Save Upgrade Data. Which of the following best describes the differences between the two options?()A、Both options back up user and partition profile data. Only the Backup Critical Console Data backs up TCP/IP settings or preferencesB、Both options back up partition profile information. Only the Backup Critical Console Data backs up service function settings, such as Inventory Scout, Service Agent, and Service Focal PointC、The Backup Critical Console Data should be performed just before the HMC software update operation. The Save Upgrade Data should be performed each time configuration changes are made to the system or the HMCD、The Save Upgrade Data should be performed just before the HMC software update operation. The Backup Critical Console Data should be performed each time configuration changes are made to the system or the HMC
考题
单选题A System p administrator needs to upgrade a system from AIX 5.2 to AIX 5.3. Which of the following installation methods would minimize downtime()A
Migration installationB
Partition MobilityC
alt_disk_installD
update_all smit fastpath and reboot during the next scheduled outage
考题
单选题A production system needs to be upgraded from AIX V5.1 to AIX V5.2. All logs and users need to be saved. Which installation method will accomplish the upgrade?()A
Update InstallationB
Migration InstallationC
Preservation InstallationD
New and Complete Overwrite Installation
考题
单选题An administrator is planning an upgrade of a major software package on an application server.The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()A
Identify necessary operating system updatesB
Implement the changeC
Document the changeD
Schedule system down time
考题
单选题The System Administrator wants to do a backup of the HMC and notices that there are two options on the HMC menu: Backup Critical Console data and Save Upgrade Data. Which of the following best describes the differences between the two options?()A
Both options back up user and partition profile data. Only the Backup Critical Console Data backs up TCP/IP settings or preferencesB
Both options back up partition profile information. Only the Backup Critical Console Data backs up service function settings, such as Inventory Scout, Service Agent, and Service Focal PointC
The Backup Critical Console Data should be performed just before the HMC software update operation. The Save Upgrade Data should be performed each time configuration changes are made to the system or the HMCD
The Save Upgrade Data should be performed just before the HMC software update operation. The Backup Critical Console Data should be performed each time configuration changes are made to the system or the HMC
考题
单选题A customer has a pSeries that needs to be upgraded from AIX Version 5.1 to AIX Version 5.2. The customer wants to retain /etc/passwd. Which of the following installation types should be used?()A
Preservation InstallB
Retention InstallC
Overwrite InstallD
Migration Install
考题
单选题An administrator is planning an upgrade of a major software package on an application server. The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()A
Identify necessary operating system updatesB
Implement the changeC
Document the changeD
Schedule system down time
考题
单选题In order to upgrade from AIX Version 4.3 to AIX Version 5.2, which of the following actions should be performed?()A
Run smit update_allB
Run smit install_allC
Boot from the installation mediaD
Run update_all from the mounted CD
考题
单选题A system administrator needs to quickly migrate a machine from AIX 5.1 to AIX 5.2. The administrator will only be allowed enough downtime to reboot the machine. Which installation method should be used to accomplish this task?()A
Perform a migration installation during the reboot process.B
Perform an alternate disk installation and migration using NIM.C
Copy the /usr directory from another 5.2 server to this server.D
Perform an update_all install from 5.2 media to take effect on reboot.
考题
单选题A system administrator needs to upgrade the Oracle database from Version 7 to Version 8. Which of the following scheduling concerns should be considered?()A
Schedule enough down time to backup, upgrade and reboot. B
Backup, upgrade, then schedule enough down time to reboot the system.C
Backup, then schedule enough down time to upgrade and reboot the system. D
There are no scheduling concerns because no down time is required.
考题
单选题You are the network administrator for All servers run Windows Server 2003. You are creating a backup schedule for the main file server. You need to create a schedule so that backup jobs are completed in the shortest amount of time possible. What should you do?()A
Schedule a normal backup every Sunday. Schedule incremental backups every Monday through Saturday.B
Schedule a normal backup every Sunday. Schedule differential backups every Monday through Saturday.C
Schedule a copy backup every day.D
Schedule a normal backup every day.
考题
单选题A system was running properly until a reboot. Following the reboot, the system LED displayed cycles between 0223 and 0229. Which of the following procedures should be performed next?()A
Power down then power up the systemB
Boot into diagnostic mode and run fsckC
Boot from installation media and run bosbootD
Boot into maintenance mode and check the bootlist
考题
单选题A system administrator completed an upgrade of the maintenance level of their AIX system. Which of the following commands should be run to verify that the operating system is in a consistent state?()A
instfix -iB
lslpp -lC
lppchk -vD
oslevel -r
热门标签
最新试卷