网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()
A

operator training

B

cache size of the two clusters

C

fibre bandwidth capability between the sites

D

number of stacked tape drives attached to each cluster


参考答案

参考解析
解析: 暂无解析
更多 “单选题A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A operator trainingB cache size of the two clustersC fibre bandwidth capability between the sitesD number of stacked tape drives attached to each cluster” 相关考题
考题 A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A. operator trainingB. cache size of the two clustersC. fibre bandwidth capability between the sitesD. number of stacked tape drives attached to each cluster

考题 A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()A.VLANB.zoningC.trunkingD.LUN masking

考题 Your customer wants to build a network for a financial trading floor that has a requirement for multiple high-value transactions, which are also vital to the customer. What are the two most critical requirements? ()(Choose two.)A. no single point of failureB. trading database server locationC. redundant application servers locationD. deterministic response to all failuresE. determine which protocol to use

考题 Your customer wants to build a network for a financial trading floor that has a requirement formultiple high-value transactions, which are also vital to the customer. What are the two mostcritical requirements?() (Choose two.)A、no single point of failureB、trading database server locationC、redundant application servers locationD、deterministic response to all failuresE、determine which protocol to use

考题 Your customer wants to build a network for a financial trading floor that has a requirement for multiple high-value transactions, which are also vital to the customer. What are the two most critical requirements? ()(Choose two.)A、no single point of failureB、trading database server locationC、redundant application servers locationD、deterministic response to all failuresE、determine which protocol to use

考题 A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration:  (1)two Brocade 20-Port SAN Switch Modules  (2)two Nortel Networks 1/10 GB Uplink ESM  (3)a redundant AMM  What is the minimum number of power supplies needed for this configuration to have full redundancy?()A、4B、3C、2D、8

考题 A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()A、VLANB、zoningC、trunkingD、LUN masking

考题 A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A、operator trainingB、cache size of the two clustersC、fibre bandwidth capability between the sitesD、number of stacked tape drives attached to each cluster

考题 A customer wants to expand their current storage environment, but has floor space for only two machine frames or two racks. Their environment consists of IBM SAN Volume Controllers and IBM DS4000 systems. The DS4000 systems are at end of lease. The customer wants the maximum number of disks possible in two frames. Which of the following solutions is best for this customer?()A、add one SVCB、install one DS8700C、install one DS8800D、install one XIV system

考题 A customer has two sites located 500 kilometers apart. The customer has both a high-speedInternet link and dark fiber between the sites. The customer wants to utilize storage resources ateither site leveraging replication for disaster recovery implementations. The customer wants to linkthese two sites together. Which option provides the highest performance and is most reliable?()A、iFCP routerB、FCIP routerC、DWDM and CWDMD、LC multi-mode 50 micron fiber

考题 A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data. Which sequence of actions will properly bring up the secondary site?()A、bring up the secondary site on the target disksB、suspend and bring up the secondary site on the target disksC、perform a FlashCopy and bring up the secondary site on the target disksD、"go-to-sync", perform aFlashCopy, and bring up the secondary site on the target disks

考题 A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()A、Dual power supplies.B、Twice the amount of disk.C、Two dual-port LHEA adapters.D、Two dual-port fibre channel adapters.

考题 A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()A、compatibility of copy functionsB、difference in capacities in the two systemsC、cache size discrepancies between the two systemsD、the necessity of using two storage management products

考题 A customer is planning a PowerHA cluster split across two sites. The sites are located 10km apart. There is aDS8000 storage array at each site with SAN connectivity between the two arrays. There are only enough IPinterfaces for one IP network in this cluster. How can they ensure that disk data is automatically mirrored and synchronized between sites?()A、Purchase PowerHA/XD licenseB、Purchase PowerHA with GLVM licenseC、Implement PowerHA with split-site LVMD、Implement PowerHA with cross-site LVM

考题 A customer has two Ethernet Switch Modules installed in an IBM BladeCenter Enterprise chassis. The modules were configured identically. The Ethernet module in bay one was inadvertenly reset to factory defaults. Which solution returns the module to the customer-specific configuration?()A、Back up the configuration from Ethernet module in bay 2 and restore it to the module in Bay 1 using the switch CLI or Web interface B、Swap the modules, which will automatically resynch the settings stored in the Advanced Management Module C、Back up the configuration of the Ethernet module in bay one and restore it to the Ethernet module in bay two using the AMM D、Restore the configuration from NVRAM using the Switch Module Web interface

考题 A current System z customer has 10,000 IBM 3490 tape cartridges, most of which are only 10%utilized, in their tape shelf storage adjacent to the computer room. The customer currently has nospace for the new DS8700 that is on order. What should the IBM storage specialist propose as asolution?()A、IBM Information Archive B、TS3500 with LTO-5 drives C、TS7700 Virtual Tape Server D、TS3310 with two expansion frames

考题 A customer wants to create a custom Junos Pulse configuration. Which two are required?()A、Connection setB、Configuration setC、Custom installerD、Component set

考题 单选题A customer is planning a PowerHA cluster split across two sites. The sites are located 10km apart. There is aDS8000 storage array at each site with SAN connectivity between the two arrays. There are only enough IPinterfaces for one IP network in this cluster. How can they ensure that disk data is automatically mirrored and synchronized between sites?()A Purchase PowerHA/XD licenseB Purchase PowerHA with GLVM licenseC Implement PowerHA with split-site LVMD Implement PowerHA with cross-site LVM

考题 单选题During a planning session, the customer indicates that they intend to build two independent two- Node clusters (cluster ’A’ and ’B’) that will be provided shared storage form an IBM TotalStorage FAStT900 server. The customer intends to present 2 LUNs to cluster ’A’, and 2 LUNs to cluster ’B’. All hosts will be dual attached via fibre.  What additional hardware or software is necessary to make this a valid configuration?()A  SAN switchesB  Fibre channel Hub(s)C  IBM Storage Manager AgentsD  IBM Subsystem Device Driver

考题 单选题A customer has two Ethernet Switch Modules installed in an IBM BladeCenter Enterprise chassis. The modules were configured identically. The Ethernet module in bay one was inadvertenly reset to factory defaults. Which solution returns the module to the customer-specific configuration?()A Back up the configuration from Ethernet module in bay 2 and restore it to the module in Bay 1 using the switch CLI or Web interface B Swap the modules, which will automatically resynch the settings stored in the Advanced Management Module C Back up the configuration of the Ethernet module in bay one and restore it to the Ethernet module in bay two using the AMM D Restore the configuration from NVRAM using the Switch Module Web interface

考题 单选题A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data. Which sequence of actions will properly bring up the secondary site?()A bring up the secondary site on the target disksB suspend and bring up the secondary site on the target disksC perform a FlashCopy and bring up the secondary site on the target disksD go-to-sync, perform aFlashCopy, and bring up the secondary site on the target disks

考题 单选题A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration:  (1)two Brocade 20-Port SAN Switch Modules  (2)two Nortel Networks 1/10 GB Uplink ESM  (3)a redundant AMM  What is the minimum number of power supplies needed for this configuration to have full redundancy?()A 4B 3C 2D 8

考题 单选题A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site.  Which IBM System Storage DS8000 solution should the storage  specialist propose to the client()A Metro/Global MirrorB Metro MirrorC Global CopyD Global Mirror

考题 单选题A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A operator trainingB cache size of the two clustersC fibre bandwidth capability between the sitesD number of stacked tape drives attached to each cluster

考题 单选题A customer wants to expand their current storage environment, but has floor space for only two machine frames or two racks. Their environment consists of IBM SAN Volume Controllers and IBM DS4000 systems. The DS4000 systems are at end of lease. The customer wants the maximum number of disks possible in two frames. Which of the following solutions is best for this customer?()A add one SVCB install one DS8700C install one DS8800D install one XIV system

考题 单选题A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()A compatibility of copy functionsB difference in capacities in the two systemsC cache size discrepancies between the two systemsD the necessity of using two storage management products

考题 单选题A customer has two sites located 500 kilometers apart. The customer has both a high-speedInternet link and dark fiber between the sites. The customer wants to utilize storage resources ateither site leveraging replication for disaster recovery implementations. The customer wants to linkthese two sites together. Which option provides the highest performance and is most reliable?()A iFCP routerB FCIP routerC DWDM and CWDMD LC multi-mode 50 micron fiber

考题 单选题A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()A VLANB zoningC trunkingD LUN masking