网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
Validate Scope is the process?of?formalizing?acceptance?of the?Complete()。
A.project?deliverables
B.WBS
C.activities
D.milestones
B.WBS
C.activities
D.milestones
参考答案
参考解析
解析:本题翻译:确认范围是正式验收项目已完成的(73)的过程。
A.项目可交付成果B.WBS C.活动D.里程碑
本题考查的是范围管理中的确认范围,正确选项为A项目可交付成果。
确认范围是正式验收项目已完成的可交付成果的过程,其主要作用是使验收过程具有客观性,同时,通过验收每个可交付成果,提高最终产品、服务或成果获得验收的可能性。
A.项目可交付成果B.WBS C.活动D.里程碑
本题考查的是范围管理中的确认范围,正确选项为A项目可交付成果。
确认范围是正式验收项目已完成的可交付成果的过程,其主要作用是使验收过程具有客观性,同时,通过验收每个可交付成果,提高最终产品、服务或成果获得验收的可能性。
更多 “Validate Scope is the process?of?formalizing?acceptance?of the?Complete()。A.project?deliverables B.WBS C.activities D.milestones” 相关考题
考题
Which of the following is not a scope management process?A . InitiationB . Scope planningC . Scope DefinitionD . Scope change controlE . Scope verification
考题
The project charter is prepared in which scope management process?A . InitiationB . Scope planningC . Scope DefinitionD . Scope change controlE . Scope verification
考题
The work breakdown structure (WBS) is first developed in which scope management process?A . InitiationB . Scope planningC . Scope change controlD . Scope DefinitionE . Scope verification
考题
The process of choosing/documenting the best approach to achieve the project objectives is part of:A.The scope baseline.B.Scope authorizationC.Scope definitionD.Scope planning.E.All of the above.
考题
● The project (73)is a key input to quality planning since it documents major project deliverables, the project objectives that serve to define important stakeholder requirements, thresholds, and acceptance criteria.(73)A. work performance informationB. scope statementC. change requestsD. process analysis
考题
78 The process of choosing/documenting the best approach to achieve the project objectives is part of: A. The scope baseline.B. Scope authorizationC. Scope definitionD. Scope planning.E. All of the above.
考题
141 The work breakdown structure (WBS) is first developed in which scope management process? A. InitiationB. Scope planningC. Scope change controlD. Scope DefinitionE. Scope verification
考题
142 The project charter is prepared in which scope management process?A. InitiationB. Scope planningC. Scope DefinitionD. Scope change controlE. Scope verification
考题
144 Which of the following is not a scope management process?A. InitiationB. Scope planningC. Scope DefinitionD. Scope change controlE. Scope verification
考题
23 The work breakdown structure (WBS) is first developed in which scope management process? A. InitiationB. Scope planningC. Scope change controlD. ScopeDefinitionE. Scope verification
考题
● The process of choosing/documenting the best approach to achieve the project objectives is part of:A The scope baseline.B Scope authorizationC Scope definitionD Scope planning.E All of the above.
考题
is the process of obtaining the stakeholdrs'formal acceptance of the completed project scope. Verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.A.WBS CreationB.Scope definitionC.Project acceptanceD.Scope verification
考题
The project()is a key input to quality planning since it documents major project deliverables,the project objectives that serve to define important stakeholder requirements,thresholds,and acceptance criteriaA.work performance informationB.scope statementC.change requestsD.process analysis
考题
The project(73)is a key input to quality planning since it documents major project deliverables, the project objectives that serve to define important stakeholder requirements, thresholds, and acceptance criteria.A.work performance informationB.scope statementC.change requestsD.process analysis
考题
()is the process of formalizing acceptance of the completed project deliverables. The key benefit of this process is that it brings objectivity to the acceptance process and increases the probability of final product, service,or result acceptance by validating each deliverable。A、Validate scopeB、Define scopeC、Control scopeD、Collect requirement
考题
the () is primarily concerned with acceptance of the deliverables.while quality control is primarily concerned with correctness of the deliverables and meeting the quality requirements specified for the deliverablesA.verify scopeB.define scopeC.quality assuranceD.validate scope
考题
Validate Scope is the process of formalizing acceptance of completed().A.project deliverablesB.WBSC.activitiesD.milestones
考题
() is the process of obtaining the stakeholders\' formal acceptance of thecompleted project scope. Verifying the scope includes reviewing deliverables and work results toensure that all were completed satisfactorily. A.Project acceptance
B.Scope verification
C.Scope definition
D.WBS Creation
考题
The()process differs from the()process in that the former is primarily concerned with acceptance of the deliverables,while the latter is primarily concerned with acceptance of the deliverables,while the latter is primarily concerned with correctness of the deliverables.A.perform Quality Assurance
B.Validate Scope
C.Control Quality
D.Define Scope
考题
( )is a process of developing a detailed description of the project and productA.collect requirements
B.Scope definition
C.validate scope
D.Control range
考题
the ( ) is primarily concerned with acceptance of the deliverables.while quality control is primarily concerned with correctness of the deliverables and meeting the quality requirements specified for the deliverables. A.verify scope
B.define scope
C.quality assurance
D.validate scope
考题
The project()is a key input to quality planning since it documents major project deliverables, the project objectives that serve to define important stakeholder requirements,thresholds, and acceptance criteria.A、work performance informationB、scope statementC、changerequestsD、process analysis
考题
When using the steps to success methodology, where does Quote Builder fit into the deal process flow?()A、It encompasses the validate and solve stepsB、It encompasses the Discovery, Validate and Solve stepsC、It encompasses the Discover, Validate, Solve and Present StepsD、It encompasses the Discovery, Solve and Close stepsE、It encompasses the Discovery, Validate and Present Steps
考题
()is the process of obtaining the stakeholders’ formal acceptance of the completed project scope.Verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.A、Project acceptanceB、Scope verificationC、Scope definitionD、WBS Creation
考题
单选题() is the process of obtaining the stakeholders' formal acceptance of the completed project scope .verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.A
projectacceptanceB
scopeverificationC
scopedefinitionD
WBS Creation
考题
单选题()is the process of obtaining the stakeholders’ formal acceptance of the completed project scope.Verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.A
Project acceptanceB
Scope verificationC
Scope definitionD
WBS Creation
考题
单选题When using the steps to success methodology, where does Quote Builder fit into the deal process flow?()A
It encompasses the validate and solve stepsB
It encompasses the Discovery, Validate and Solve stepsC
It encompasses the Discover, Validate, Solve and Present StepsD
It encompasses the Discovery, Solve and Close stepsE
It encompasses the Discovery, Validate and Present Steps
热门标签
最新试卷