Risk()acknowledge the existence of a threat,but no proactive action is taken

A.Avoidance
B.Transfer
C.Mitigate
D.ceptance

参考答案

参考解析
解析:风险()承认存在威胁,但不采取主动行动。
A.回避B.转移C.减轻D.接收
更多 “Risk()acknowledge the existence of a threat,but no proactive action is takenA.Avoidance B.Transfer C.Mitigate D.ceptance” 相关考题
考题 The cost of corrective action taken by the purchaser and chargeable to the supplier under the terms of the contract is:A Payment authorizationB Bid cost considerationsC Release paymentD Back chargeE None of the above.

考题 SWOT analysis is a kind of risk identification method.If the project team chose me WT strategy, they should( ). A.overcome the weakness and reduce the threat B.make full use of the advantage and reduce the threat C.overcome the weakness and catch the opportunity D.make full use of the advantage and catch the opportunity

考题 听力原文:Although it is a normal part of banking, excessive interest rate risk can pose a significant threat to a bank's earnings and capital base.(4)A.Interest rate risk is a normal part of banking operations.B.Interest rate risk is a terrible threat to banking operations.C.A bank's earnings and capital base is a normal part of banking.D.A bank's earnings and capital base can pose a significant threat to banking.

考题 Rule 14 describes the action to be taken by vessels meeting head-on. Which of the following conditions must exist in order for this rule to apply?______.A.Both vessels must be power-driven.B.They must be meeting on reciprocal or nearly reciprocal courses.C.The situation must involve risk of collision.D.All of the above

考题 NAC's(Network Access Control)role is to restrict network access to only compliant endpoints and(66)users. However, NAC is not a complete LAN(67)solution; additional proactive and(68)security measures must be implemented. Nevis is the first and only comprehensive LAN security solution that combines deep security processing of every packet at 10Gbps, ensuring a high level of security plus application availability and performance. Nevis integrates NAC as the first line of LAN security(69). In addition to NAC, enterprises need to implement role-based network access control as well as critical proactive security measures — real-time, multilevel(70)inspection and microsecond threat containment.A.automatedB.distinguishedC.authenticatedD.destructed

考题 Risk ( )acknowledge the existence of a threat ,but no proactive action is taken。 A、avoidanceB、transferC、mitigateD、acceptance

考题 第一组:When a nominated surveyor or recognized organization determines that the condition of the ship or its equipment does not correspond substantially with the particulars of the Certificate (IOPP) or is such that the ship is not fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment, such surveyor or organization shall immediately ensure that corrective action is taken and shall in due course notify the Administration. If such corrective action is not taken, the Certificate shall be withdrawn and the Administration shall be notified immediately; and if the ship is in a port of another Party, the appropriate authorities of the port State shall also be notified immediately. When an officer of the Administration, a nominated surveyor or a recognized organization has notified the appropriate authorities of the port State, the Government of the port State concerned shall give such officer, surveyor or organization any necessary assistance to carry out their obligations under this regulation. When applicable, the Government of the port State concerned shall take such steps as will ensure that the ship shall not sail until it can proceed to sea or leave the port for the purpose of proceeding to the nearest appropriate repair yard available without presenting an unreasonable threat of harm to the marine environment.Whenever an accident occurs to a ship or a defect is discovered which substantially affects the integrity of the ship or the efficiency or completeness of its equipment covered by this Annex the master or owner of the ship shall report at the earliest opportunity to the Administration, the recognized organization or the nominated surveyor responsible for issuing the relevant Certificate, who shall cause investigations to be initiated to determine whether a survey as required by paragraph 1 of this regulation is necessary. If the ship is in a port of another Party, the master or owner shall also report immediately to the appropriate authorities of the port State and the nominated surveyor or recognized organization shall ascertain that such report has been made.When a ship is found not fit to proceed to sea by a nominated surveyor, then corrective action should be taken and be informed immediately. (1)the master (2)the authorities of port State (3)the AdministrationA.(1)B.(2)C.(3)D.(1)(2)(3)

考题 In case of accidents ______ the risk of sinking,all effective measures shall be taken to steer clear of the fairway to avoid ______ the traffic.A.involving/impedingB.involved/to impedeC.involving/to impedeD.involved/impeding

考题 Any action ______ collision shall,if the circumstances of the case admit,made in ample time and with due regard to the observance of good seamanship.A.taking to avoidB.taking to avoidingC.taken to avoidD.taken to avoiding

考题 If the goods are not taken delivery of by the receiver from alongside the vessel without delay,the carrier shall be at liberty to land such goods on shore or any other proper places ______.A.at the sole risk and expense of the CarrierB.at the sole risk and expense of the MerchantC.at the sole risk of the Merchant but at the expense of the CarrierD.at the sole risk of the Carrier but at the expense of the Merchant

考题 Failure to comply with the above may______action being taken against the vessel.A.resulted inB.result inC.to result inD.resulting in

考题 What are two benefits for the Cisco partner, derived from the Cisco SBR methodology? ()A、There is faster implementation of new business applications.B、Solution differentiation from the competition allows for premium margins.C、There is less risk through the implementation of proven solutions.D、Proactive planning enhances customer satisfaction.

考题 What are two benefits for the Cisco Partner, derived from the Cisco SBR Methodology?()A、There is less risk through the implementation of proven solutionsB、Proactive planning enhances customer satisfactionC、Thereare faster implementation of new business applicationsD、Solution differentiation from the competition allows for premium margins

考题 单选题In determining if risk of collision exists the following considerations shall be among().A these taken into calculationB those taking into accountC that taken into accountD those taken into account

考题 单选题If you are the stand-on vessel in a crossing situation,you may take action to avoid collision by your maneuver alone. When may this action be taken?().A At any time you feel it is appropriateB Only when you have reached extremisC When you determine that your present course will cross ahead of the other vesselD When it becomes apparent to you that the give-way vessel is not taking appropriate action

考题 单选题You are in charge of a stand-on vessel in a crossing situation.The other vessel is 1.5 miles to port.You believe that risk of collision exists.You should().A take avoiding action immediately upon determining that risk of collision existsB immediately sound the danger signalC take avoiding action only after providing the give-way vessel time to take action ,and determining that her action is not appropriateD hold course and speed until the point of extremis, and then sound the danger signal, taking whatever action will best avert collision

考题 单选题When you doubt the existence of risk of collision,().A such risk shall be deemed to existB such risk shall not be deemed to existC you needn't take any action to avoid collision with any vesselD you should accelerate your speed ahead

考题 单选题Rule 14 describes the action to be taken by vessel meeting head-on. Which of the following conditions must exist in order for this rule to apply?().A Both vessels must be power-drivenB They must be meeting on reciprocal or nearly reciprocal coursesC The situation must involve risk of collisionD All of the above

考题 单选题The erosion of the white cliffs in the south of England _____.A will soon become a problem for people living in central EnglandB has now become a threat to the local residentsC is quickly changing the map of EnglandD can be stopped if proper measures are taken

考题 单选题According to the regulations for life boat falls,which action must be taken at 30-month intervals?()A End-for-endedB RenewedC InspectedD Weight tested

考题 单选题When shall the stand-on vessel in a crossing situation take action to avoid the other vessel().A When a risk of collision existsB When action by the give-way vessel alone will not prevent a collisionC When the bearing to give-way vessel becomes steadyD When the vessels become less than 1/2 mile apart

考题 单选题Although some countries have taken action to solve the shortage of water,it may be sometime_____ the situation improves•A beforeB whenC sinceD until

考题 单选题When in sight of another vessel,any action taken to avoid collision must().A be accompanied by sound signalsB not result in another close quarters situationC include a speed changeD All of the above

考题 单选题When taking action to avoid collision,you should().A Make sure the action is taken in enough timeB Not make any large course changesC Not make any large speed changesD All of the above

考题 单选题The air required for combustion is taken from the engine room through a filter fitted on the turbochargerThis reduces the risk for too and contamination of the combustion air()A high temperaturesB low temperaturesC wetD dirty

考题 单选题According to the regulations for lifeboat falls,which action must be taken with the falls no later than 5-year intervals?()A Proof testedB End-for-endedC RenewedD Weight tested

考题 单选题When action to avoid a close quarter situation is taken,a course change alone may be the most effective action provide that().A it is done in a succession of small course changesB It is not done too earlyC It is a large course changeD the course change is to starboard