网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
The pivoting point of a fully loaded vessel with normal trim proceeding ahead at sea speed is().
A
right at the bow
B
one-third the length of the vessel from the bow
C
one-half the length of the vessel from the bow
D
two-thirds the length of the vessel from the bow
参考答案
参考解析
解析:
暂无解析
更多 “单选题The pivoting point of a fully loaded vessel with normal trim proceeding ahead at sea speed is().A right at the bowB one-third the length of the vessel from the bowC one-half the length of the vessel from the bowD two-thirds the length of the vessel from the bow” 相关考题
考题
The phrase VESSEL IN BALLAST usually means________.A.the ship is fully loadedB.the ship loaded with waterC.a ship with cargoD.a ship with no cargo
考题
The primary objective of a Ro-Ro vessel is to ______.A.transfer containers without chassisB.load the vessel with palletized cargoC.transport vehiclesD.be loaded full and down to her marks
考题
Which vessel is most likely to be loaded full but not down ________.A.A bulk carrier loaded with heavy oreB.A bulk carrier loaded with steelC.A break bulk vessel loaded with palletized cargoD.A tanker loaded with heavy grain
考题
Prior to loading barges over the stern of a LASH vessel,the vessel should be trimmed in what manner ________.A.Two to four feet by the bowB.Slightly by the bowC.No trim should be permittedD.Slightly by the stern
考题
Your tanker is loaded down to her marks,and you find that she has too much trim by the stern.To adjust the trim,you may ______.A.Add ballast forwardB.Load more cargo forwardC.Shift bunkers forwardD.All of the above
考题
Your tanker is fully loaded,and you find that she is down slightly by the head.To adjust the trim,you may ______.A.Add ballast aftB.Load more cargo aftC.Shift cargo aftD.All of the above
考题
For a vessel with longitudinal inclination, an increase in GML causes ______.A.list to stabilize at an angle of lollB.trim to stabilize at an angle of lollC.trim to increaseD.trim to decrease
考题
单选题Your vessel was damaged and initially assumed a significant list and trim; however,further increase has been slow. Based on this data,what should you expect?()A
The slowing is only temporary and the vessel will probably suddenly capsize or plunge from loss of stability due to change in the waterplane areaB
The vessel can probably be saved if further flooding can be stoppedC
The vessel will continue to slowly list and/or trim due to the free surface effect and free communication effectD
The vessel will suddenly flop to the same or greater angle of list on the other side and may capsize
考题
单选题The change in trim of a vessel may be found by().A
dividing the trim moments by MT1B
subtracting the LCF from the LCBC
looking at the Hydrostatic Properties Table for the draft of the vesselD
dividing longitudinal moments by the displacement
考题
单选题Prior to loading barges over the stern of a LASH vessel,the vessel should be trimmed in what manner?().A
Two to four feet by the bowB
Slightly by the bowC
No trim should be permittedD
Slightly by the stern
考题
单选题Which factor does NOT affect the required freeboard of a cargo vessel? ()A
Season of the yearB
Geographic zone of operationC
Density of the waterD
Condition of trim in normal operation
考题
单选题Your tanker is loaded down to her marks,and you find that she has too much trim by the stern. To adjust the trim,you may().A
add ballast forwardB
load more cargo forwardC
shift bunkers forwardD
All of the above
考题
单选题Master must ascertain that deck loads are stowed in such a manner as().A
not to affect the vessel's stability and trimB
to affect the vessel's stabilityC
to affect the vessel's trimD
to affect the vessel's atability or trim
考题
单选题How do you determine the weight of the vessel that is supported by the ground when a vessel has run aground?()A
This requires extensive calculation and is usually performed only by a naval architect not by a ship's officerB
Determine the point where aground and the draft at that point,then calculate it using the grounding formulaC
Use the hydrostatic tables and enter with the mean draft before grounding and the mean draft after groundingD
Use the inclining experiment formula and substitute the change of trim for the angle of list
考题
单选题When a ship is fully loaded, it needs to prevent the main engine to be().While a ship is fully empty, it needs to prevent the main engine to be().A
overspeed;overloadB
overload;overspeedC
over mechanical load;over thermal loadD
over torque;overspeed
考题
单选题The trim of a vessel is the ().A
value of the mean draftB
degree of listC
amount of rollD
difference in fore and aft drafts
考题
单选题()cargo means to check all cargo loaded into or discharged from a vessel.A
TallyingB
ExaminingC
WeighingD
Handling
考题
单选题The primary objective of a Ro-Ro vessel is to().A
transfer containers without chassisB
load the vessel with palletized cargoC
transport vehiclesD
be loaded full and down to her marks
考题
单选题A vessel loads edible oil in a deep tank through a manhole at the midlength of the tank. In order to fill the tank to maximum capacity,what trim should the vessel have?()A
Down by the bowB
Down by the sternC
Down by either the bow or sternD
In level trim
考题
单选题What is MTI?().A
The foot/tons needed to trim the vessel by 1 inchB
The foot/tons needed to trim the vessel by 1 footC
The moments needed to trim the vessel by 1 centimeterD
The amount of vessel will trim when loading 100 tons 100 feet from the tipping Center
考题
单选题The normal tendency for a loaded tanker is to().A
hogB
sagC
have a permanent listD
be very tender
考题
单选题Your tank vessel is loaded down to her marks, and you find that she has too much trim by the stern,To adjust the trim, you may().A
add ballast forwardB
load more cargo forwardC
shift bunkers forwardD
All of the above
考题
单选题Your tank vessel is fully loaded, and you find that she is down slightly by the head. To adjust the trim, you may().A
add ballast aftB
load more cargo aftC
shift cargo aftD
All of the above
考题
单选题Which statement concerning the handling characteristics of a fully loaded vessel as compared with those of a light vessel is FALSE?()A
A fully loaded vessel will be slower to respond to the enginesB
A fully loaded vessel will maintain her headway furtherC
A light vessel will be more affected by the windD
A light vessel lose more rudder effect in shallow water
考题
单选题Deadfreight is the charge for the().A
carriage of demise cargoB
cost of transshipment of over-carried cargoC
difference in the amount of cargo loaded and the amount of cargo dischargedD
difference in the amount of cargo loaded and the amount of cargo booked,through no fault of the vessel
热门标签