网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
名词解释题
管道暗设(piping concealment)
参考答案
参考解析
解析:
暂无解析
更多 “名词解释题管道暗设(piping concealment)” 相关考题
考题
下列说法中错误的为( )。A.民用建筑中的非保温管道,明设时,应计算管道的散热量对散热器数量的折减
B.民用建筑中的非保温管道,暗设时,应计算管道中水的冷却对散热器数量的增加
C.工业建筑中的非保温管道,明设时,应计算管道的散热量对散热器数量的折减;暗设时,应计算管道中水的冷却对散热器数量的增加
D.室内温度要求较严格的工业建筑中的非保温管道,明设时,应计算管道的散热量对散热器数量的折减;暗设时,应计算管道中水的冷却对散热器数量的增加
考题
单选题“Any leaks in piping, propeller shaft, machinery, tanks, will have to be repaired, or at least patched up temporarily until the next stop” This sentence means that ().A
Any leaks in piping, propeller shaft, machinery, tanks, will have to be repaired on the spotB
Any leaks in piping, propeller shaft, machinery, tanks, will have to be repaired on the next port of callC
Any leaks in piping, propeller shaft, machinery, tanks, will have to be repaired until the next stopD
Any leaks in piping, propeller shaft, machinery, tanks, will have to be at least patched up
考题
判断题暗设燃气管道的沟槽底部,应设置管垫。A
对B
错
热门标签
最新试卷