网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
floating crane()
A

岸吊

B

起重机

C

浮吊

D

龙门吊


参考答案

参考解析
解析: 暂无解析
更多 “单选题floating crane()A 岸吊B 起重机C 浮吊D 龙门吊” 相关考题
考题 The electrical components for each single crane are installed in its ______.A.crane houseB.machinery baseC.turntableD.All of the above

考题 The mode of control employed by an alarm circuit is aA.two position controlB.single speed floating controlC.proportional speed floating controlD.reset control

考题 The net productivity per gang-hour can be improved through a decrease of ______.A.cranes/derricksB.crane/derrick cyclesC.crane/derrick cycle timeD.weight per package

考题 On no account ______ to be exceeded.A.is the SWL of the craneB.are the SWL of the craneC.the SWL of the crane isD.the SWL of the crane are

考题 Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set ________.A.The cranes may be operated independentlyB.The cranes may be interconnected for twin operationC.When twinned,the crane rotation on the foundation assembly is unlimitedD.All of the above

考题 Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels ________.A.A centerline crane can never be operated in tandemB.One crane is able to work one end of two adjacent hatchesC.These cranes are more economical and weigh less than outboard-mounted cranesD.One crane is able to work both sides of the ship

考题 Which of the following statements is TRUE regarding crane operations ________.A.Radio communications allow the crane operator to disregard the use of hand signalsB.The crane operators and signalman must be familiar with the correct hand signalsC.The forward cranes can be operated from the bridgeD.The aft cranes can be operated from the aft steering station

考题 During which condition should the operator of a pedestal crane shutdown operations ________.A.Bunkering barge alongsideB.Potable water spill on deckC.Crane hydraulic hose burstsD.Trim greater than 4 feet

考题 The ()(浮吊) can float on water used to load and unload the cargo.A、floating craneB、jumbo boomC、union purchaseD、crane

考题 浮吊()A、gantry craneB、floating craneC、shore craneD、overhead crane

考题 I think you’d better use the ()(岸吊).A、derrickB、heavy derrickC、shore craneD、floating crane

考题 floating crane()A、岸吊B、起重机C、浮吊D、龙门吊

考题 水鹤 water crane

考题 英译中:Crane

考题 名词解释题英译中:Crane

考题 单选题Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set().A The cranes may be operated independentlyB The cranes may be interconnected for twin operationC When twinned,the crane rotation on the foundation assembly is unlimitedD All of the above

考题 单选题On no account()to be exceeded.A is the S.W.L. of the craneB are the S.W.L. of the craneC the S.W.L. of the crane isD the S.W.L.of the crane are

考题 单选题On no account()to be exceeded.A is the SWL of the craneB are the SWL of the craneC the SWL of the crane isD the SWL of the crane are

考题 单选题Which of the following statements is TRUE regarding crane operations().A Radio communications allow the crane operator to disregard the use of hand signalsB The crane operators and signalman must be familiar with the correct hand signalsC The forward cranes can be operated from the bridgeD The aft cranes can be operated from the aft steering station

考题 单选题Which action(s) should the operator of a pedestal crane take if crane control is lost?()A Let go of both control levers and return to neutral positionB Press the emergency stopC Notify the mate on watchD All of the above

考题 单选题浮吊()A gantry craneB floating craneC shore craneD overhead crane

考题 单选题Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().A A centerline crane can never be operated in tandemB One crane is able to work one end of two adjacent hatchesC These cranes are more economical and weigh less than outboard-mounted cranesD One crane is able to work both sides of the ship

考题 单选题The mode of control employed by an alarm circuit is a ()A two position controlB signal speed floating controlC proportional speed floating controlD reset control

考题 名词解释题水鹤 water crane

考题 单选题In a ordinary cargo crane, () is fitted to rotate the crane.A the slewing motorB the lulling motorC the hoisting motorD none of the above

考题 单选题0n no account()to be exceeded.A is the S.W.L.of the craneB are the S.W.L. of the craneC the S.W.L. of the crane isD the S.W.L. of the crane are

考题 单选题For a floating vessel,the center of the floating is the point in the waterpiane.().A aboat which the vessel lists and trimsB which coincides with the center of buoyancyC which, in the absence of external forces, is always vertically aligned with the center of gravityD which is shown in the hydrostatic tables as VCB