网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A new water boiler was installed in our building last week, which could provide hot water to the students.
A

inspected carefully

B

placed in service

C

undertaken with care

D

undone casual


参考答案

参考解析
解析:
句意:上周我们楼里新安装了一个热水锅炉,可以给学生们提供热水。be placed in service安装投入使用。inspect carefully仔细调查。undertake with care谨慎行事。undo casually随意地解开。
更多 “单选题A new water boiler was installed in our building last week, which could provide hot water to the students.A inspected carefullyB placed in serviceC undertaken with careD undone casual” 相关考题
考题 In a()boiler the hot gases from the furnace pass gases from the furnace pass water is on the outside. A.water-tubeB.fire-tubeC.exhaust gasD.composite

考题 what chemicals did you use to treat the boiler water ?when you test alkalinity and acidity of water in boiler by pH test paper ? the result shows the boiler water is in acidiity . please describe what the possible cause is .

考题 In a ______boiler the hot gases from the furnace pass through the tubes while the water is on the outside.A.water-tubeB.fire-tubeC.exhaust gasD.Composite

考题 If the feed pump for an auxiliary boiler fails to deliver the feed water to the boiler, the cause may be ______.A.high steam pressure in the boilerB.abnormally high feed-water temperatureC.abnormally high boiler water temperatureD.steam demand exceeding feed pump capacity

考题 In which case is the IOPP Certificate of an inspected vessel NOT invalidated?A.The required oily-water separator malfunctionsB.The ship is transferred to Liberian registryC.An annual survey is conducted fifteen months after the date of certificate issuanceD.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator

考题 单选题When steam is being raised on a boiler, the water level will normally ().A drop as the boiler warms upB rise as the boiler warms upC remain unchanged until the boiler is hot enoughD rise and fall with the steam demand

考题 单选题For proper operation, auxiliary boiler feed water must have which of the following characteristics?()A High oxygen concentrationB Low pHC Proper alkalinityD All of the above

考题 单选题A waste heat boiler is installed on some diesel propelled vessels to ().A provide steam for emergency propulsionB provide steam for the turbo-generatorC heat the waste water tanksD steam for warming engines

考题 单选题According to the instructions, which of the following is TRUE?A The gasket should be cleaned thoroughly with cold water.B Mild detergent and hot water can best clean the cooker.C Soapy water will often damage the cooker.D Sand can be used to clean the cooker.

考题 单选题The steam boiler is part of a closed loop steam, whereby, after the energy of the steam is used up and it becomes water again, () is collected and returned back to the boiler for heating up again to steam.A the formerB the firstC the latterD the last

考题 单选题The rate of heat transfer in a water-tube auxiliary boiler can be increased by ().A operating the boiler at less than normal water levelB installing fins on the firesides of water-tubesC increasing the amount of excess air to the burnersD treating the boiler water with chemical oxygen scavengers

考题 单选题Which of the following statements concerning the water tube and fire tube boilers is not true?()A natural circulation of the water in the water tube boiler is better than that in the fire tube boilerB for the same output the water tube boiler will carry less mass of water compared with the fire tube boilerC the water tube boiler will cost shorter time for steam raisingD the water tube boiler require lower skill in operating and maintaining

考题 单选题The purpose of the safety relief valves installed on an auxiliary boiler is to ().A relieve excess fuel oil pressure during the “off” fire cycleB admit water to the dry pipeC throttle the forced draft fan output for proper combustionD reduce excess steam pressure in the boiler

考题 填空题The tall building ____ (complete) last month is our new classroom building.

考题 单选题In (), hot diesel engine jacket water passes over the stack and heats the sea water passing through the tubes.A a flash generatorB a flash evaporatorC a vacuum boiling evaporatorD a boiler

考题 单选题Fins are installed on the fireside of water-tubes used in waste boiler to()A decrease the velocity of gases flowing past the tubesB increase the rate of heat transferC reduce accumulations carbon depositsD direct the flow of gases

考题 单选题The boiler water alkalinity in a coil-type auxiliary boiler should be maintained at the pH recommended by the boiler manufacturer to()A precipitate silica from solutionB reduce corrosion in the heating coilC prevent clogging and erosion in the coilD maintain zero water hardness

考题 单选题In which case is the IOPP Certificate of an inspected vessel NOT invalidated().A The required oily-water separator malfunctionsB The ship is transferred to Liberian registryC An annual survey is conducted fifteen months after the date of certificate issuanceD A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator

考题 单选题A new water boiler was installed in our building last week, which could provide hot water to the students.A inspected carefullyB placed in serviceC undertaken with careD undone casual

考题 单选题Improper maintenance of the fuel oil burners in an automatically fired auxiliary boiler, could result in ()A increased fuel consumptionB increased feed water consumptionC fuel pump failureD combustion control system failure

考题 单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A completely drain the boiler in an emergencyB prevent sludge from forming in the drumC remove floating impurities from the boiler water surfaceD remove settled solids from the water drum

考题 单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()A The safety valve escape piping should be disconnected from the valve body and a blank insertedB The boiler vent valves should be openedC All hand-hole/manhole covers should be tightened up as much as possible to preclude any leaksD All of the above

考题 单选题The water level of an exhaust gas boiler which is independent of the auxiliary boiler and just as the extra heating surface of it ()A will be modulated in proportionB will be modulated in proportion and integralC will be modulated in proportion and differentialD will not be modulated at all

考题 单选题If an operating auxiliary boiler has a water pH reading of 7, you should ().A bottom blow the boilerB treat the water with caustic sodaC treat the water with chemical scavengersD reduce the water alkalinity to recommended readings

考题 单选题If the feed pump for an auxiliary boiler fails to deliver the feed water to the boiler, the cause maybe ().A high steam pressure in the boilerB abnormally high feed water temperatureC abnormally high boiler water temperatureD steam demand exceeding feed pump capacity

考题 单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A remove suspended and precipitated solids from the boiler waterB completely drain the boiler in an emergency situationC prevent hardened scale deposits in the water drumD remove floating impurities from the oily water surface

考题 单选题In a () boiler the water flows through the inside of the tubes while the hot gases pass around the outside.A water-tubeB fire-tubeC exhaust gasD none of the above

考题 单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()A The safety valve escape piping should be disconnected from the valve body and a blank insertedB The boiler vent valves should be openedC All handhole/manhole covers should be tightened up as much as possible to preclude any leaksD All of the above