网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
A new water boiler was installed in our building last week, which could provide hot water to the students.
A
inspected carefully
B
placed in service
C
undertaken with care
D
undone casual
参考答案
参考解析
解析:
句意:上周我们楼里新安装了一个热水锅炉,可以给学生们提供热水。be placed in service安装投入使用。inspect carefully仔细调查。undertake with care谨慎行事。undo casually随意地解开。
句意:上周我们楼里新安装了一个热水锅炉,可以给学生们提供热水。be placed in service安装投入使用。inspect carefully仔细调查。undertake with care谨慎行事。undo casually随意地解开。
更多 “单选题A new water boiler was installed in our building last week, which could provide hot water to the students.A inspected carefullyB placed in serviceC undertaken with careD undone casual” 相关考题
考题
In a()boiler the hot gases from the furnace pass gases from the furnace pass water is on the outside.
A.water-tubeB.fire-tubeC.exhaust gasD.composite
考题
what chemicals did you use to treat the boiler water ?when you test alkalinity and acidity of water in boiler by pH test paper ? the result shows the boiler water is in acidiity . please describe what the possible cause is .
考题
In a ______boiler the hot gases from the furnace pass through the tubes while the water is on the outside.A.water-tubeB.fire-tubeC.exhaust gasD.Composite
考题
If the feed pump for an auxiliary boiler fails to deliver the feed water to the boiler, the cause may be ______.A.high steam pressure in the boilerB.abnormally high feed-water temperatureC.abnormally high boiler water temperatureD.steam demand exceeding feed pump capacity
考题
In which case is the IOPP Certificate of an inspected vessel NOT invalidated?A.The required oily-water separator malfunctionsB.The ship is transferred to Liberian registryC.An annual survey is conducted fifteen months after the date of certificate issuanceD.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
考题
单选题When steam is being raised on a boiler, the water level will normally ().A
drop as the boiler warms upB
rise as the boiler warms upC
remain unchanged until the boiler is hot enoughD
rise and fall with the steam demand
考题
单选题For proper operation, auxiliary boiler feed water must have which of the following characteristics?()A
High oxygen concentrationB
Low pHC
Proper alkalinityD
All of the above
考题
单选题A waste heat boiler is installed on some diesel propelled vessels to ().A
provide steam for emergency propulsionB
provide steam for the turbo-generatorC
heat the waste water tanksD
steam for warming engines
考题
单选题According to the instructions, which of the following is TRUE?A
The gasket should be cleaned thoroughly with cold water.B
Mild detergent and hot water can best clean the cooker.C
Soapy water will often damage the cooker.D
Sand can be used to clean the cooker.
考题
单选题The steam boiler is part of a closed loop steam, whereby, after the energy of the steam is used up and it becomes water again, () is collected and returned back to the boiler for heating up again to steam.A
the formerB
the firstC
the latterD
the last
考题
单选题The rate of heat transfer in a water-tube auxiliary boiler can be increased by ().A
operating the boiler at less than normal water levelB
installing fins on the firesides of water-tubesC
increasing the amount of excess air to the burnersD
treating the boiler water with chemical oxygen scavengers
考题
单选题Which of the following statements concerning the water tube and fire tube boilers is not true?()A
natural circulation of the water in the water tube boiler is better than that in the fire tube boilerB
for the same output the water tube boiler will carry less mass of water compared with the fire tube boilerC
the water tube boiler will cost shorter time for steam raisingD
the water tube boiler require lower skill in operating and maintaining
考题
单选题The purpose of the safety relief valves installed on an auxiliary boiler is to ().A
relieve excess fuel oil pressure during the “off” fire cycleB
admit water to the dry pipeC
throttle the forced draft fan output for proper combustionD
reduce excess steam pressure in the boiler
考题
单选题In (), hot diesel engine jacket water passes over the stack and heats the sea water passing through the tubes.A
a flash generatorB
a flash evaporatorC
a vacuum boiling evaporatorD
a boiler
考题
单选题Fins are installed on the fireside of water-tubes used in waste boiler to()A
decrease the velocity of gases flowing past the tubesB
increase the rate of heat transferC
reduce accumulations carbon depositsD
direct the flow of gases
考题
单选题The boiler water alkalinity in a coil-type auxiliary boiler should be maintained at the pH recommended by the boiler manufacturer to()A
precipitate silica from solutionB
reduce corrosion in the heating coilC
prevent clogging and erosion in the coilD
maintain zero water hardness
考题
单选题In which case is the IOPP Certificate of an inspected vessel NOT invalidated().A
The required oily-water separator malfunctionsB
The ship is transferred to Liberian registryC
An annual survey is conducted fifteen months after the date of certificate issuanceD
A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
考题
单选题A new water boiler was installed in our building last week, which could provide hot water to the students.A
inspected carefullyB
placed in serviceC
undertaken with careD
undone casual
考题
单选题Improper maintenance of the fuel oil burners in an automatically fired auxiliary boiler, could result in ()A
increased fuel consumptionB
increased feed water consumptionC
fuel pump failureD
combustion control system failure
考题
单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A
completely drain the boiler in an emergencyB
prevent sludge from forming in the drumC
remove floating impurities from the boiler water surfaceD
remove settled solids from the water drum
考题
单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()A
The safety valve escape piping should be disconnected from the valve body and a blank insertedB
The boiler vent valves should be openedC
All hand-hole/manhole covers should be tightened up as much as possible to preclude any leaksD
All of the above
考题
单选题The water level of an exhaust gas boiler which is independent of the auxiliary boiler and just as the extra heating surface of it ()A
will be modulated in proportionB
will be modulated in proportion and integralC
will be modulated in proportion and differentialD
will not be modulated at all
考题
单选题If an operating auxiliary boiler has a water pH reading of 7, you should ().A
bottom blow the boilerB
treat the water with caustic sodaC
treat the water with chemical scavengersD
reduce the water alkalinity to recommended readings
考题
单选题If the feed pump for an auxiliary boiler fails to deliver the feed water to the boiler, the cause maybe ().A
high steam pressure in the boilerB
abnormally high feed water temperatureC
abnormally high boiler water temperatureD
steam demand exceeding feed pump capacity
考题
单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A
remove suspended and precipitated solids from the boiler waterB
completely drain the boiler in an emergency situationC
prevent hardened scale deposits in the water drumD
remove floating impurities from the oily water surface
考题
单选题In a () boiler the water flows through the inside of the tubes while the hot gases pass around the outside.A
water-tubeB
fire-tubeC
exhaust gasD
none of the above
考题
单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()A
The safety valve escape piping should be disconnected from the valve body and a blank insertedB
The boiler vent valves should be openedC
All handhole/manhole covers should be tightened up as much as possible to preclude any leaksD
All of the above
热门标签
最新试卷