A new water boiler was installed in our building last week, which could provide hot water to the students.
A
inspected carefully
B
placed in service
C
undertaken with care
D
undone casual
参考答案
参考解析
解析:
句意:上周我们楼里新安装了一个热水锅炉,可以给学生们提供热水。be placed in service安装投入使用。inspect carefully仔细调查。undertake with care谨慎行事。undo casually随意地解开。
句意:上周我们楼里新安装了一个热水锅炉,可以给学生们提供热水。be placed in service安装投入使用。inspect carefully仔细调查。undertake with care谨慎行事。undo casually随意地解开。
更多 “单选题A new water boiler was installed in our building last week, which could provide hot water to the students.A inspected carefullyB placed in serviceC undertaken with careD undone casual” 相关考题
考题
38. A new cinema ______ in the city last year.A. built B. was builtC. was building D. is built
考题
--Do you know the youngest perofessor of our school? He diet last week.Oh______________
A.It's hard to believeB.thanks for your informationC.I like his course
考题
They ___a new house at the foot of the hill last year.
A.BuildB. builtC.buildsD. was building
考题
what chemicals did you use to treat the boiler water ?when you test alkalinity and acidity of water in boiler by pH test paper ? the result shows the boiler water is in acidiity . please describe what the possible cause is .
考题
If the feed pump for an auxiliary boiler fails to deliver the feed water to the boiler, the cause may be ______.A.high steam pressure in the boilerB.abnormally high feed-water temperatureC.abnormally high boiler water temperatureD.steam demand exceeding feed pump capacity
考题
The river water was( )from its old course into a new channel where they were building the dam.A.turned
B.switched
C.shifted
D.diverted
考题
--Was it not until last week__________he decided to give up smoking?
--No, he began __________ he saw the new film last month.
A.when; as soon
B.that; immediately
C.did; that
D.that; till
考题
What time does our plane leave?()A、Saturday.B、Eight o'clock in the morningC、Last week.D、This week
考题
单选题The most common cause of scale formation in an auxiliary boiler is ()A
concentrations of calcium sulfate in the boiler waterB
fuel oil in the feed waterC
improper treatment of the feed water with calcium sulfateD
excessive feed water alkalinity
考题
单选题The purpose of a temperature sensing device installed in the stack of a small automatically fired auxiliary steam boiler is to secure the oil burner()A
in the event of a flame failureB
in the event of a stack fireC
when the water level reach the crown sheetD
when the feed pump discharge pressure drops to a preset minimum
考题
单选题The steam boiler is part of a closed loop steam, whereby, after the energy of the steam is used up and it becomes water again, () is collected and returned back to the boiler for heating up again to steam.A
the formerB
the firstC
the latterD
the last
考题
单选题The purpose of the safety relief valves installed on an auxiliary boiler is to ().A
relieve excess fuel oil pressure during the “off” fire cycleB
admit water to the dry pipeC
throttle the forced draft fan output for proper combustionD
reduce excess steam pressure in the boiler
考题
单选题—Was it not until last week he decided to give up smoking?—No, he began _____he saw the new film last month.A
when; as soonB
that; immediatelyC
did; thatD
that; till
考题
单选题Which of the following statements concerning the water tube and fire tube boilers is not true?()A
natural circulation of the water in the water tube boiler is better than that in the fire tube boilerB
for the same output the water tube boiler will carry less mass of water compared with the fire tube boilerC
the water tube boiler will cost shorter time for steam raisingD
the water tube boiler require lower skill in operating and maintaining
考题
单选题The rate of heat transfer in a water-tube auxiliary boiler can be increased by ().A
operating the boiler at less than normal water levelB
installing fins on the firesides of water-tubesC
increasing the amount of excess air to the burnersD
treating the boiler water with chemical oxygen scavengers
考题
单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A
remove suspended and precipitated solids from the boiler waterB
completely drain the boiler in an emergency situationC
prevent hardened scale deposits in the water drumD
remove floating impurities from the oily water surface
考题
单选题Fins are installed on the fireside of water-tubes used in waste boiler to()A
decrease the velocity of gases flowing past the tubesB
increase the rate of heat transferC
reduce accumulations carbon depositsD
direct the flow of gases
考题
单选题The boiler water alkalinity in a coil-type auxiliary boiler should be maintained at the pH recommended by the boiler manufacturer to()A
precipitate silica from solutionB
reduce corrosion in the heating coilC
prevent clogging and erosion in the coilD
maintain zero water hardness
考题
单选题In the last few years, our company ______ a great deal of attention to building up company culture.A
paysB
would payC
is payingD
has been paying
考题
单选题When steam is being raised on a boiler, the water level will normally ().A
drop as the boiler warms upB
rise as the boiler warms upC
remain unchanged until the boiler is hot enoughD
rise and fall with the steam demand
考题
单选题Excessive alkalinity of the water in an auxiliary boiler can cause ().A
caustic embrittlement of the boiler metalB
acidic corrosion of the boiler metalC
hard scale deposits on the boiler tubesD
etching of the heat exchange surfaces
考题
单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A
completely drain the boiler in an emergencyB
prevent sludge from forming in the drumC
remove floating impurities from the boiler water surfaceD
remove settled solids from the water drum
考题
单选题A waste heat boiler is installed on some diesel propelled vessels to ().A
provide steam for emergency propulsionB
provide steam for the turbo-generatorC
heat the waste water tanksD
steam for warming engines
考题
单选题If the feed pump for an auxiliary boiler fails to deliver the feed water to the boiler, the cause maybe ().A
high steam pressure in the boilerB
abnormally high feed water temperatureC
abnormally high boiler water temperatureD
steam demand exceeding feed pump capacity