网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The tube in a boiler should be blinded if found ().
A

scaled

B

informed

C

leaky

D

deformed


参考答案

参考解析
解析: 暂无解析
更多 “单选题The tube in a boiler should be blinded if found ().A scaledB informedC leakyD deformed” 相关考题
考题 The boiler water alkalinity in a coil-type auxiliary boiler should be maintained at the pH recommended by the boiler manufacturer to______.A.precipitate(使沉淀) silica (硅石)from solutionB.reduce corrosion in the heating coilC.prevent clogging and erosion in the coilD.maintain zero water hardness

考题 Which statement about the inert gas system is TRUE ________.A.Boiler soot blowers should never be used when the IG system is operatingB.The boiler will produce the best quality of flue gas for the IG system when the boiler load is very lightC.The boiler will produce the most quantity of flue gas for the IG system when the boiler load is very lightD.Flue gas with excessive oxygen content is de-oxygenated in the scrubber

考题 单选题The safety valves should be tested and adjusted when the boiler survey is ()A completedB carried outC cleanedD steamed

考题 单选题What is NOT a function of the steam drum of a marine water-tube boiler().A Receives saturated steam from the generating tubesB Serves as a reservoir of boiler feed waterC Holds internal fittings for separation of moisture from steamD Collects steam exhausted from the turbines

考题 单选题Which of the following statements concerning the water tube and fire tube boilers is not true?()A natural circulation of the water in the water tube boiler is better than that in the fire tube boilerB for the same output the water tube boiler will carry less mass of water compared with the fire tube boilerC the water tube boiler will cost shorter time for steam raisingD the water tube boiler require lower skill in operating and maintaining

考题 单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()A The safety valve escape piping should be disconnected from the valve body and a blank insertedB The boiler vent valves should be openedC All hand-hole/manhole covers should be tightened up as much as possible to preclude any leaksD All of the above

考题 单选题In the event of a flame failure in an auxiliary water-tube boiler, you must()A relight the boiler immediately to prevent loss of steam pressureB relight the fire off the brickwork as the bricks are cherry redC purge the furnace of any combustible gases before attempting to relight the fireD speed up the feed pump to prevent dry firing when the burner flame is reestablished

考题 单选题The rate of heat transfer in a water-tube auxiliary boiler can be increased by ().A operating the boiler at less than normal water levelB installing fins on the firesides of water-tubesC increasing the amount of excess air to the burnersD treating the boiler water with chemical oxygen scavengers

考题 单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()A The safety valve escape piping should be disconnected from the valve body and a blank insertedB The boiler vent valves should be openedC All handhole/manhole covers should be tightened up as much as possible to preclude any leaksD All of the above

考题 单选题Waterside scale in a fire-tube boiler may cause ().A increased heat transferB fireside erosionC high steam demandD overheated tubes

考题 单选题Which of the following may hardness of the boiler water cause?() (1) scale formation (2) tube failure (3) corrosionA (1)and(2)B (1)and(3)C (2)and(3)D (1),(2)and(3)

考题 单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A remove suspended and precipitated solids from the boiler waterB completely drain the boiler in an emergency situationC prevent hardened scale deposits in the water drumD remove floating impurities from the oily water surface

考题 单选题A distorted furnace in a fire-tube auxiliary boiler may be the result of ()A firing for extended periods in the low fire modeB overheating, due to waterside depositsC varying the water level above the crown sheetD carrying excessive alkalinity in the boiler water

考题 单选题The water in an auxiliary boiler should be tested daily for ().A dissolved oxygenB chloridesC sludgeD dissolved nitrogen

考题 单选题Diesel engine waste heat boiler construction is usually of the fire-tube or()A cyclone furnace boiler typeB dry back boiler typeC water-tube typeD critical circulation boiler type

考题 单选题Which of the following actions should be taken by the engine room watch when the general alarm is sounded continuously?()A The fire pump should be startedB The boiler rims should be securedC The fixed CO2 system should be initiated into actionD The engine room ventilation should be secured

考题 单选题Pyrometers commonly found on diesel engine exhaust systems, consist of()A pyrostats and a voltmeterB a gas-filled bellows, a tube and a pressure gaugeC thermocouples and a voltmeterD ammeters and thermocouples

考题 单选题The internal part of boiler should be welded by yard if found ().A sealedB crackedC shape changedD deformed

考题 单选题The internal part of the boiler, if found (), has to be chemically washed by yard.A deformedB rustedC crackedD scaled

考题 单选题The internal part of boiler should be cleaned by yard if found ().A scaledB wornC deformedD rested

考题 单选题The boiler water alkalinity in a coil-type auxiliary boiler should be maintained at the pH recommended by the boiler manufacturer to()A precipitate silica from solutionB reduce corrosion in the heating coilC prevent clogging and erosion in the coilD maintain zero water hardness

考题 单选题The water in an auxiliary boiler should be tested for chloride content to determine ().A total dissolved solidsB salt contaminationC water hardnessD chlorine contamination

考题 单选题() should be tested and adjusted when the boiler survey is carried out.A The boiler oil tankB The steam pipeC The fire sideD The safety valves

考题 单选题(), iea steam cooler, may be filled in the boiler system to control the superheated steam temperature.A An economizerB An attemperatorC A water dramD A down-comer tube

考题 单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A completely drain the boiler in an emergencyB prevent sludge from forming in the drumC remove floating impurities from the boiler water surfaceD remove settled solids from the water drum

考题 单选题Before an auxiliary boiler is shutdown for an extended period of time, the water in the boiler should have a pH value of ().A 10B 7C 4D 1

考题 单选题The water in an operating auxiliary boiler should be tested for alkalinity and chloride content each().A hourB dayC weekD month