单选题
The tube in a boiler should be blinded if found ().
A
scaled
B
informed
C
leaky
D
deformed
参考答案
参考解析
解析:
暂无解析
更多 “单选题The tube in a boiler should be blinded if found ().A scaledB informedC leakyD deformed” 相关考题
考题
The boiler water alkalinity in a coil-type auxiliary boiler should be maintained at the pH recommended by the boiler manufacturer to______.A.precipitate(使沉淀) silica (硅石)from solutionB.reduce corrosion in the heating coilC.prevent clogging and erosion in the coilD.maintain zero water hardness
考题
Which statement about the inert gas system is TRUE ________.A.Boiler soot blowers should never be used when the IG system is operatingB.The boiler will produce the best quality of flue gas for the IG system when the boiler load is very lightC.The boiler will produce the most quantity of flue gas for the IG system when the boiler load is very lightD.Flue gas with excessive oxygen content is de-oxygenated in the scrubber
考题
单选题The safety valves should be tested and adjusted when the boiler survey is ()A
completedB
carried outC
cleanedD
steamed
考题
单选题What is NOT a function of the steam drum of a marine water-tube boiler().A
Receives saturated steam from the generating tubesB
Serves as a reservoir of boiler feed waterC
Holds internal fittings for separation of moisture from steamD
Collects steam exhausted from the turbines
考题
单选题Which of the following statements concerning the water tube and fire tube boilers is not true?()A
natural circulation of the water in the water tube boiler is better than that in the fire tube boilerB
for the same output the water tube boiler will carry less mass of water compared with the fire tube boilerC
the water tube boiler will cost shorter time for steam raisingD
the water tube boiler require lower skill in operating and maintaining
考题
单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()A
The safety valve escape piping should be disconnected from the valve body and a blank insertedB
The boiler vent valves should be openedC
All hand-hole/manhole covers should be tightened up as much as possible to preclude any leaksD
All of the above
考题
单选题In the event of a flame failure in an auxiliary water-tube boiler, you must()A
relight the boiler immediately to prevent loss of steam pressureB
relight the fire off the brickwork as the bricks are cherry redC
purge the furnace of any combustible gases before attempting to relight the fireD
speed up the feed pump to prevent dry firing when the burner flame is reestablished
考题
单选题The rate of heat transfer in a water-tube auxiliary boiler can be increased by ().A
operating the boiler at less than normal water levelB
installing fins on the firesides of water-tubesC
increasing the amount of excess air to the burnersD
treating the boiler water with chemical oxygen scavengers
考题
单选题In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()A
The safety valve escape piping should be disconnected from the valve body and a blank insertedB
The boiler vent valves should be openedC
All handhole/manhole covers should be tightened up as much as possible to preclude any leaksD
All of the above
考题
单选题Waterside scale in a fire-tube boiler may cause ().A
increased heat transferB
fireside erosionC
high steam demandD
overheated tubes
考题
单选题Which of the following may hardness of the boiler water cause?() (1) scale formation (2) tube failure (3) corrosionA
(1)and(2)B
(1)and(3)C
(2)and(3)D
(1),(2)and(3)
考题
单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A
remove suspended and precipitated solids from the boiler waterB
completely drain the boiler in an emergency situationC
prevent hardened scale deposits in the water drumD
remove floating impurities from the oily water surface
考题
单选题A distorted furnace in a fire-tube auxiliary boiler may be the result of ()A
firing for extended periods in the low fire modeB
overheating, due to waterside depositsC
varying the water level above the crown sheetD
carrying excessive alkalinity in the boiler water
考题
单选题The water in an auxiliary boiler should be tested daily for ().A
dissolved oxygenB
chloridesC
sludgeD
dissolved nitrogen
考题
单选题Diesel engine waste heat boiler construction is usually of the fire-tube or()A
cyclone furnace boiler typeB
dry back boiler typeC
water-tube typeD
critical circulation boiler type
考题
单选题Which of the following actions should be taken by the engine room watch when the general alarm is sounded continuously?()A
The fire pump should be startedB
The boiler rims should be securedC
The fixed CO2 system should be initiated into actionD
The engine room ventilation should be secured
考题
单选题Pyrometers commonly found on diesel engine exhaust systems, consist of()A
pyrostats and a voltmeterB
a gas-filled bellows, a tube and a pressure gaugeC
thermocouples and a voltmeterD
ammeters and thermocouples
考题
单选题The internal part of boiler should be welded by yard if found ().A
sealedB
crackedC
shape changedD
deformed
考题
单选题The internal part of the boiler, if found (), has to be chemically washed by yard.A
deformedB
rustedC
crackedD
scaled
考题
单选题The internal part of boiler should be cleaned by yard if found ().A
scaledB
wornC
deformedD
rested
考题
单选题The boiler water alkalinity in a coil-type auxiliary boiler should be maintained at the pH recommended by the boiler manufacturer to()A
precipitate silica from solutionB
reduce corrosion in the heating coilC
prevent clogging and erosion in the coilD
maintain zero water hardness
考题
单选题The water in an auxiliary boiler should be tested for chloride content to determine ().A
total dissolved solidsB
salt contaminationC
water hardnessD
chlorine contamination
考题
单选题() should be tested and adjusted when the boiler survey is carried out.A
The boiler oil tankB
The steam pipeC
The fire sideD
The safety valves
考题
单选题(), iea steam cooler, may be filled in the boiler system to control the superheated steam temperature.A
An economizerB
An attemperatorC
A water dramD
A down-comer tube
考题
单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A
completely drain the boiler in an emergencyB
prevent sludge from forming in the drumC
remove floating impurities from the boiler water surfaceD
remove settled solids from the water drum
考题
单选题Before an auxiliary boiler is shutdown for an extended period of time, the water in the boiler should have a pH value of ().A
10B
7C
4D
1
考题
单选题The water in an operating auxiliary boiler should be tested for alkalinity and chloride content each().A
hourB
dayC
weekD
month