网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
If a vessel takes a sudden,severe list or trim from an unknown cause,you should FIRST().
A
determine the cause before taking countermeasures
B
assume the shift is due to off-center loading
C
counterflood
D
assume the cause is environmental forces
参考答案
参考解析
解析:
暂无解析
更多 “单选题If a vessel takes a sudden,severe list or trim from an unknown cause,you should FIRST().A determine the cause before taking countermeasuresB assume the shift is due to off-center loadingC counterfloodD assume the cause is environmental forces” 相关考题
考题
It can be inferred from Paragraph 5 that[A] data leakage is more severe in Europe.[B] FTC's decision is essential to data security.[C] California takes the lead in security legislation.[D] legal penalty is a major Solomon to data leakage.
考题
In the absence of external forces,adding weight on one side of a floating vessel causes the vessel to ().A.heel until the angle of loll is reachedB.list until the center of buoyancy is aligned vertically with the center of gravityC.trim to the side opposite TCG until all moments are equalD.decrease draft at the center of flotation
考题
A tow astern is veering from side to side on its towline.The best way of controlling the action is to ______.A.Trim the tow by the bowB.Trim the tow by the sternC.List the tow to windwardD.Adjust the length of the towing bridle
考题
For a vessel with longitudinal inclination, an increase in GML causes ______.A.list to stabilize at an angle of lollB.trim to stabilize at an angle of lollC.trim to increaseD.trim to decrease
考题
For a vessel with transverse inclination, an increase in GMT causes ______.A.list to stabilize at an angle of lollB.trim to decreaseC.list to increaseD.list to decrease
考题
If a vessel takes a sudden severe list or trim from an unknown cause, you should FIRST____.A.determine the cause before taking countermeasuresB.assume the shift is due to off-center loadingC.counterflood on the side opposite the list or trimD.assume the cause is environmental forces
考题
单选题Your vessel was damaged and initially assumed a significant list and trim; however,further increase has been slow. Based on this data,what should you expect?()A
The slowing is only temporary and the vessel will probably suddenly capsize or plunge from loss of stability due to change in the waterplane areaB
The vessel can probably be saved if further flooding can be stoppedC
The vessel will continue to slowly list and/or trim due to the free surface effect and free communication effectD
The vessel will suddenly flop to the same or greater angle of list on the other side and may capsize
考题
单选题The change in trim of a vessel may be found by().A
dividing the trim moments by MT1B
subtracting the LCF from the LCBC
looking at the Hydrostatic Properties Table for the draft of the vesselD
dividing longitudinal moments by the displacement
考题
单选题Which will most likely occur when entering shallow water? ()A
Rudder action will become more effectiveB
The vessel's list will changeC
The vessel's trim will changeD
An increase in speed will occur
考题
单选题The TPC curve,one of the hydrostatic curves in a vessel’s plans,gives the number of tons().A
necessary to change the angle of list 1°at a given draftB
necessary to change trim 1 cm at a given draftC
pressure per square cm on the vessel's hull at a given draftD
necessary to further immerse the vessel 1 cm at a given draft
考题
单选题It can be inferred from paragraph 5 that ______.A
data leakage is more severe in EuropeB
FTC’s decision is essential to data securityC
California takes the lead in security legislationD
legal penalty is a major Solomon to data leakage
考题
单选题Your vessel is damaged with no list,but down by the stern. There is progressive flooding and trim by the stern is increasing. What is the effect on transverse stability after the deck edge at the stern is submerged?()A
KB increases,increasing BM and therefore GMB
KG increases due to the weight of the added water on deckC
BM decreases from loss of water plane and greater volumeD
There is no effect on transverse stability
考题
单选题The pivoting point of a fully loaded vessel with normal trim proceeding ahead at sea speed is().A
right at the bowB
one-third the length of the vessel from the bowC
one-half the length of the vessel from the bowD
two-thirds the length of the vessel from the bow
考题
单选题If the cause of a sudden severe list or trim is negative initial stability,counter flooding into empty tanks may().A
increase the righting momentB
cause an increase in the righting armC
bring the unit to an upright equilibrium positionD
cause the unit to flop to a greater angle
考题
单选题While loading cargo,a white trimming light on the starboard side comes on. This indicates that().A
the vessel has a list of about 1` to starboardB
the chutes should be directed to the starboard sideC
the chutes in No. 1 hold should be directed to the starboard sideD
a severe list to starboard has developed and all loading should cease
考题
单选题How do you determine the weight of the vessel that is supported by the ground when a vessel has run aground?()A
This requires extensive calculation and is usually performed only by a naval architect not by a ship's officerB
Determine the point where aground and the draft at that point,then calculate it using the grounding formulaC
Use the hydrostatic tables and enter with the mean draft before grounding and the mean draft after groundingD
Use the inclining experiment formula and substitute the change of trim for the angle of list
考题
单选题When cargo is shifted from the main deck into the lower hold of a vessel,().A
The metacenter will move downwardB
The GM will increaseC
The center of buoyancy will move upwardD
The list of the vessel will become great
考题
单选题() system is arranged to ensure that water can be drawn from any tank or the sea and discharged to any other tank or the sea as required to trim the vessel.A
The domestic waterB
Bilge waterC
Oil transferD
The ballast
考题
单选题What is NOT a problem area when loading barges on a LASH type vessel? ()A
Frequent stability calculations requiredB
Thorough pre-planning requiredC
Limiting depths alongside berths restrict barge draftsD
Minimum trim and 0°list are required for optimum operations
考题
单选题A vessel loads edible oil in a deep tank through a manhole at the midlength of the tank. In order to fill the tank to maximum capacity,what trim should the vessel have?()A
Down by the bowB
Down by the sternC
Down by either the bow or sternD
In level trim
考题
单选题What is MTI?().A
The foot/tons needed to trim the vessel by 1 inchB
The foot/tons needed to trim the vessel by 1 footC
The moments needed to trim the vessel by 1 centimeterD
The amount of vessel will trim when loading 100 tons 100 feet from the tipping Center
考题
单选题During counterflooding to correct a severe list aggravated by an off-center load,your vessel suddenly takes a list or trim to the opposite side. You should().A
continue counterflooding in the same directionB
continue counterflooding,but in the opposite directionC
immediately stop counterfloodingD
deballast from the low side
考题
单选题If the cause of severe list or trim is off-center ballast,counterflooding into empty tanks will().A
increase the righting momentB
increase the righting armC
increase list or trimD
decrease list or trim
考题
单选题During counterflooding to correct a severe list or trim aggravated by an off-center load,a ship suddenly takes a list or trim to the opposite side. You should().A
continue counterflooding in the same directionB
continue counterflooding,but in the opposite directionC
immediately stop counterfloodingD
deballast from the low side
考题
单选题If a vessel takes a sudden severe list or trim from an unknown cause, you should first().A
determine the cause before taking countermeasuresB
assume the shift is due to off-center loadingC
counterflood on the side opposite the list or trimD
assume the cause is environment forces
考题
单选题While your vessel is docked port side to a wharf,a sudden gale force wind causes the vessel’s stern lines to part. The stern begins to fall away from the dock,and no tugs are immediately available. Which measure(s) should you take FIRST?()A
Notify the engineroom of the need for propulsionB
Shut down any cargo transfer that's in progressC
Let go the port anchor and veer to a short scope of chainD
Obtain assistance from the terminal to put new stern lines out
考题
单选题If the cause of a sudden severe list is negative initial stability,counterflooding into empty tanks may().A
increase the righting momentB
cause an increase in the righting armC
bring the vessel to an upright equilibrium positionD
cause the vessel to flop to a greater angle
热门标签
最新试卷