网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
IBM POWER 570最大内存为:()
- A、768GB
- B、512GB
- C、256GB
- D、128GB
参考答案
更多 “IBM POWER 570最大内存为:()A、768GBB、512GBC、256GBD、128GB” 相关考题
考题
Which system provides redundant system clocks?()
A.Power 595B.Power 560C.Power 570D.Power 550
考题
有关IBM POWER 710 服务器,下面的哪些说法是合理的()A、Power 710是IBM System p 服务器一款入门级产品,可配置4核、6核、8核CPUB、Power 710采用power7芯片,支持3.0GHz,3.7GHz,3.55GHz主频C、Power 710支持AIX,LINUX,IBM i操作系统D、以上都正确
考题
A customer is very concerned about maintaining a competitive advantage through the use of state-of-the-art technology. Assuming all solutions meet the customer’s technical requirements, which solution should the IBM team propose to maximize customer satisfaction?()A、p690 with Dynamic LPARB、Grid of SP switch-attached p5-550sC、p690 with Advanced POWER VirtualizationD、p5-570 with Advanced POWER Virtualization
考题
Which is a supported method to upgrade firmware on an IBM Power Systems 570?() A、Use the /usr/sbin/invscout AIX command.B、Use the ’Updates’ panel on the managing HMcC、Boot the 570 using an IBM-provided microcode CdD、Use the /usr/lpp/diagnostics/bin/update_flash AIX command.
考题
What IBM resource will give you details concerning the total power requirements of a server environment?()A、IBM System x and BladeCenter Power Configurator ToolB、IBM Standalone Solutions Configuration Tool (SSCT)C、IBM xREF SheetsD、IBM ServerProven
考题
What is the name of the IBM solution that helps to monitor power consumption to allow better utilization of available power resources?()A、IBM Capacity ManagerB、IBM Active Energy ManagerC、IBM Remote Deployment ManagerD、IBM Virtualization Manager
考题
A customer is evaluating an IBM commercial solution against a 16-way rx8620 Integrity (Itanium). The pSeries technical specialist should lead with which of the following IBM systems?()A、IBM p5-570 8-wayB、IBM p5-570 4-wayC、IBM p5-570 2-wayD、IBM p5-570 16-way
考题
Which is a supported method to upgrade firmware on an IBM Power Systems 570?()A、Use the /usr/sbin/invscout AIX commandB、Use the 'Updates' panel on the managing HMCC、Boot the 570 using an IBM-provided microcode CDD、Use the /usr/lpp/diagnostics/bin/update_flash AIX command
考题
由于TPC组织不对中低端机器进行测试,那么POWER Systems中低端产品的tpc-c 是如何计算的?()A、根据CPU个数估计B、IBM自己测试结果C、根据POWER 570测试值和相关rperf推算D、以上都不对
考题
Which system provides redundant system clocks?()A、Power 595B、Power 560C、Power 570D、Power 550
考题
单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A
An additional switch for the new HMc B
Asynchronous adapters on the new HMcC
The two 570 servers are directly connected to the new HMc D
One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc
考题
单选题A customer is evaluating an IBM commercial solution against a 16-way rx8620 Integrity (Itanium). The pSeries technical specialist should lead with which of the following IBM systems?()A
IBM p5-570 8-wayB
IBM p5-570 4-wayC
IBM p5-570 2-wayD
IBM p5-570 16-way
考题
单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A
An additional switch for the new HMCB
Asynchronous adapters on the new HMCC
The two 570 servers are directly connected to the new HMCD
One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC
热门标签
最新试卷