网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
POWER 570是POWER Systems的高端主流产品,采用模块化的设计,请问最大支持几个CEC模块?()
- A、2个
- B、4个
- C、6个
- D、8个
参考答案
更多 “POWER 570是POWER Systems的高端主流产品,采用模块化的设计,请问最大支持几个CEC模块?()A、2个B、4个C、6个D、8个” 相关考题
考题
Which system provides redundant system clocks?()
A.Power 595B.Power 560C.Power 570D.Power 550
考题
What is the minimum number of CECs required to avoid single points of failure on a Power 570 server?()
A.1B.2C.3D.4
考题
Company.com has recently received a new p5-570 in the data center and intends to Micro-Partition the server. In which order should installation steps be taken?()A、Connect to the network,power on the server,Micro-Partition the serverB、Connect to the HMC,power on the server,Micro-Partition the server,connect to the networkC、Power on server,connect to the network,Micro-Partition the server,connect to the HMCD、Power on the server,connect to the HMC,Micro-Partition the server,connect to the network
考题
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()A、PCIe adaptersB、PCI-X adaptersC、PCI-X andPCIe adaptersD、PCI, PCI-X andPCIe adapters
考题
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or laterB、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMCC、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing oneD、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM
考题
与Sun SPARC Enterprise M4000相比,哪一款POWER Systems服务器性能即可胜出?()A、POWER520即可B、需要POWER550C、需要POWER570D、需要POWER595
考题
A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future. Which pSeries system would be positioned best to meet this customer’s requirements?()A、p5-550 with the Advanced POWER Virtualization feature and AIX 5.2B、p5-550 with the POWER5 processor technology and AIX 5.2C、p5-570 with the Advanced POWER Virtualization feature and AIX 5.3D、p5-570 with the POWER5 processor technology and AIX 5.2
考题
A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()A、A desk, as it not rack mountableB、Ethernet connections to the POWER5 systemsC、Serial connections to the POWER5 systemsD、USB connections for the keyboard and mouse
考题
Which system provides redundant system clocks?()A、Power 595B、Power 560C、Power 570D、Power 550
考题
单选题A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future. Which pSeries system would be positioned best to meet this customer’s requirements?()A
p5-550 with the Advanced POWER Virtualization feature and AIX 5.2B
p5-550 with the POWER5 processor technology and AIX 5.2C
p5-570 with the Advanced POWER Virtualization feature and AIX 5.3D
p5-570 with the POWER5 processor technology and AIX 5.2
考题
单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A
An additional switch for the new HMc B
Asynchronous adapters on the new HMcC
The two 570 servers are directly connected to the new HMc D
One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc
考题
单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A
An additional switch for the new HMCB
Asynchronous adapters on the new HMCC
The two 570 servers are directly connected to the new HMCD
One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC
考题
单选题与SUN SPARC Enterprise T5220相比,哪一款POWER Systems服务器性能即可胜出?()A
POWER520即可B
需要POWER550C
需要POWER570D
需要POWER595
热门标签
最新试卷