网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
In ship construction, frame spacing is().
A
greater at the bow and stern
B
reduced at the bow and stern
C
uniform over the length of the vessel
D
uniform over the length of the vessel, with the exception of the machinery spaces, where it is reduced due to increased stresses
参考答案
参考解析
解析:
暂无解析
更多 “单选题In ship construction, frame spacing is().A greater at the bow and sternB reduced at the bow and sternC uniform over the length of the vesselD uniform over the length of the vessel, with the exception of the machinery spaces, where it is reduced due to increased stresses” 相关考题
考题
The trend nowadays is to build the frame box as a separate fabricated construction and then, after stress relieving and machining the mating surfaces, to mount it on the _____. This has the advantage of saving weight.A.seatingB.bed-plateC.entablatureD.cylinder block
考题
请完善程序(程序文件名:Java_3.java)并进行调试。请在下画线处填入正确内容,然后删除下画线。请勿删除注释行和其他已有的语句内容。[题目要求]生成下面左边图形界面,单击图中的New按钮,弹出如右图所示的对话框。源程序:import java.awt.*;import java.awt.event.*;import javax.swing.*;public class Java_3 {public static void main(String[] args) {MulticastFrame. frame=new MulticastFrame();frame.setDefaultCloseOperation(JFrame.EXIT_ON_CLOSE);frame.show();}}class MulticastFrame. extends JFrame. {public MulticastFrame() {setTitle("MulticastTest");setSize(WIDTH,HEIGHT);MulticastPanel panel=new MulticastPanel();Container contentPane=getContentPane();contentPane.add( (1) );}public static final int WIDTH=300;public static final int HEIGHT=200;}class MulticastPanel extends JPanel }public MulticastPanel() {JButton newButton=new JButton("New");add(newButton);ActionListener newListener=new ActionListener() {public void actionPerformed(ActionEvent event) {makeNewFrame();}};newButton.addActionListener(newListener);closeAllButton=new JButton("Close all");add(closeAllButton);}private void makeNewFrame() {final BlankFrame. frame=new BlankFrame();frame.show();ActionListener closeAllListener=new ActionListener() {public void actionPerformed(ActionEvent event) {frame. (2) (); //使窗口隐藏或消除}};closeAllButton.addActionListener( (3) );}private JButton closeAllButton;}Class BlankFrame. extends JFrame. {public BlankFrame() {(4) ++;setTitle("Frame"+counter);setSize(WIDTH,HEIGHT);setLocation(SPACING*counter,SPACING*counter);}public static final int WIDTH=200;public static final int HEIGHT=150;public static final int SPACING=30;private static int counter=0;}
考题
Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in ______.A.INTERNATIONAL LOADLINE CERTIFICATEB.PASSENGER SHIP SAFETY CERTIFICATEC.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED.GENERAL DECLARATION
考题
______ is issued under the provision of International Convention for the Prevention of Pollution from Ships,1973,as modified by the Protocol of 1978 relating thereto.A.INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATEB.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATEC.CARGO SHIP SAFETY EQUIPMENT CERTIFICATED.CARGO SHIP SAFETY RADIOTELEPHONY CERTIFICATE
考题
In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the ______.A.chemical and physical properties of the materialB.name of the alternative standard or specificationC.the ASTM or ABS specification the material approximatesD.manufacturer or origin of the material
考题
A claim for cargo damages may be held against the shipowner if such damage is the result of failure of the ship's officers to ______.A.ensure the fitness and safety of cargo spacesB.ensure adequate packaging of the cargoC.prevent delays due to quarantine restrictionsD.correct all defects in the ship's construction
考题
What is the period of validity of the SOLAS required Cargo Ship Safety Construction Certificate?A.12 monthsB.24 monthsC.48 monthsD.60 months
考题
Floors aboard ship are ______.A.frames to which the tank top and bottom shell are fastened on a double bottomed shipB.transverse members of the ships frame which support the decksC.longitudinal beams in the extreme bottom of a ship from which the ship's ribs startD.longitudinal angle bars fastened to a surface for strength
考题
A ship under construction or major repair will acquire permanent magnetism due to ______ while sitting stationary in the earth's magnetic field.A.hammering and jarringB.vibration and poundingC.varying magnetic fieldsD.stable or permanent magnetism of the ship
考题
单选题In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().A
chemical and physical properties of the materialB
name of the alternative standard or specificationC
the ASTM or ABS specification the material approximatesD
manufacturer or origin of the material
考题
单选题What is the period of validity of the SOLAS required Cargo Ship Safety Construction Certificate? ()A
12 monthsB
24 monthsC
48 monthsD
60 months
考题
单选题The construction portfolio may be included as part of the ship().A
general plansB
operating manualC
builders documentationD
CCS file
考题
单选题Floors aboard ship are().A
frames to which the tank top and bottom shell are fastened on a double bottomed shipB
transverse members of the ships frame which support the decksC
longitudinal beams in the extreme bottom of a ship from which the ships ribs startD
longitudinal angle bars fastened to a surface for strength
考题
单选题Floors aboard ship are().A
frames to which the tank top and bottom shell are fastened on a double bottomed shipB
transverse members of the ships frame which support the decksC
longitudinal beams in the extreme bottom of a ship from which the ship's ribs startD
longitudinal angle bars fastened to a surface for strength
考题
单选题Which one is not true?()A
Two main areas of skill are involved in the construction of shipB
There are distinct divisions in responsibilities between naval architects and marine engineersC
Each ship will assume varying proportions according to its typeD
Ships can be divided into different categories from different perspectives
考题
单选题In preparing a cargo space for receipt of a shipment of bagged cargo,which instruction for laying dunnage should be followed? ()A
Use either 1 or 2 tiers of dunnage,spacing the pieces in each tier a foot apart,and lay pieces in the bottom tier diagonally to the ship's sideB
Use 1 tier of dunnage,laying the pieces tightly together to form a solid floor over the steel deckC
Use 2 tiers of dunnage,spacing the pieces in the bottom tier about a foot apart and the pieces in the top tier 6 inches apartD
Use 2 tiers of dunnage,spacing the pieces in the bottom tier about a foot apart and the pieces in the top tier together
考题
单选题In ship construction,bulkheads in the quarters are generally().A
structuralB
watertightC
non-structuralD
continuous
考题
单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().A
INTERNATIONAL LOAD LINE CERTIFICATEB
PASSENGER SHIP SAFETY CERTIFICATEC
CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED
GENERAL DECLARATION
考题
单选题The trend nowadays is to build the frame box as a separate fabricated construction and then, after stress relieving and machining the mating surfaces, to mount it on the ().This has the advantage of saving weight.A
seatingB
bedplateC
entablatureD
cylinder block
考题
单选题()is issued under the provision of International Convention for the Prevention of Pollution from Ships,1973,as modified by the Protocol of 1978 relating thereto.A
INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATEB
CARGO SHIP SAFETY CONSTRUCTION CERTIFICATEC
CARGO SHIP SAFETY EQUIPMENT CERTIFICATED
CARGO SHIP SAFETY RADIOTELEPHONY CERTIFICATE
考题
单选题A ship under construction or major repair will acquire permanent magnetism due to()while sitting stationary in the earth’s magnetic field.A
hammering and jarringB
vibration and poundingC
varying magnetic fieldsD
stable or permanent magnetism of the ship
考题
单选题A claim for cargo damages may be held against the shipowner if such damage is the result of failure of the ship’s officers to().A
ensure the fitness and safety of cargo spacesB
ensure adequate packaging of the cargoC
prevent delays due to quarantine restrictionsD
correct all defects in the ship's construction
考题
单选题A simplified construction plan may be included in the ship construction portfolio provided it adequately defines the().A
areas where special materials are usedB
hazardous areasC
location of emergency repair equipmentD
type and strength of materials used
考题
单选题In ship construction,frame spacing is().A
greater at the bow and sternB
reduced at the bow and sternC
uniform over the length of the vesselD
uniform over the length of the vessel,with the exception of the machinery spaces,where it is reduced due to increased stresses
考题
单选题The purpose of sheer in ship construction is to().A
allow the ship to ride waves with drier decksB
eliminate the need for butt strapsC
eliminate the need for margin platesD
give greater strength at the deck edge
考题
单选题Where is thicker plating usually found in the construction of integral tanks on a ship? ()A
On the outside of the tankB
At the bottom of the tankC
At the top of the tankD
At the center of the tank
考题
单选题A “liner” in riveted construction of a vessel is a(n) ().A
small plate which fills the aperture between riveted strakes and the vessel framingB
backing plate which is used to level the strakes while riveting,and then removedC
internal frame to which the side shell is rivetedD
seam that is welded after riveting is completed
热门标签
最新试卷