网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
The deck loads on a ship are distributed through the deck beams to the().
A
frames
B
hull
C
stringers
D
plates
参考答案
参考解析
解析:
暂无解析
更多 “单选题The deck loads on a ship are distributed through the deck beams to the().A framesB hullC stringersD plates” 相关考题
考题
甲板部由大副负责。A.The captain is the head of a ship.B.The master is the head of a ship.C.The deck department is under the command of the chief officer.D.The pilot is the head of a ship.
考题
Deck beams perform ______ of the following functions in the hull structure of a vessel.① They transfer deck loads to the frames;② They help to maintain the shape of the hull.A.① onlyB.② onlyC.Both ① and ②D.Neither ① nor ②
考题
A deck beam does NOT ______.A.act as a beam to support vertical deck loadsB.lessen the longitudinal stiffness of the vesselC.act as a tie to keep the sides of the ship in placeD.act as a web to prevent plate wrinkling due to twisting action on the vessel
考题
Cribbing is ______.A.wooden blocks or dunnage placed between a deck load and the deckB.the chains and shackles used to secure a deck cargoC.a crate in which a deck cargo is packagedD.cardboard separation pieces placed between deck loads to prevent chafing
考题
Freeing ports on a vessel with solid bulwarks ______.A.prevent stress concentration in the bulwarkB.permit easy jettison of deck cargo in an emergencyC.provide openings through the bulwarks for mooring linesD.allow water shipped on deck to flow off rapidly
考题
甲板部由大副负责。()A、The captain is the head of a ship.B、The master is the head of a ship.C、The deck department is under the command of the chief officer.D、The pilot is the head of a ship.
考题
主甲板以下是二层甲板。()A、The deck below the lower deck is known as ‘tween deck.B、The deck below the main deck is known as ‘tween deck.C、The deck above the main deck is known as ‘tween deck.D、The deck below the lower deck is known as main deck.
考题
艏楼甲板位于船艏部。()A、Forecastle deck is located at the ship’s stern.B、Poop deck is located at the ship’s bow.C、Forecastle deck at located in the ship’s bow.D、Poop deck is located at the ship’s stern.
考题
Topside paint is applied to the area of the ship’s ()which is out of water when the ship is loaded.A、hullB、cabinC、cargo holdD、deck
考题
The station lists are posted ()on board a ship.A、in the engine roomB、on the gangwayC、in public placesD、on the deck
考题
甲板分为艏楼甲板,主甲板和艉楼甲板。()A、The deck is divided into forecastle deck, main deck and poop deck.B、The deck is divided into forecastle deck, lower deck and main deck.C、The deck is divided into forecastle deck, main deck and lower deck.D、The deck is divided into main deck, lower deck and poop deck.
考题
单选题On a ship,the deck stringer is the outboardmost deck().A
platingB
beamC
stiffenerD
stanchion
考题
单选题A deck beam does NOT().A
act as a beam to support vertical deck loadsB
lessen the longitudinal stiffness of the vesselC
act as a tie to keep the sides of the ship in placeD
act as a web to prevent plate wrinkling due to twisting action on the vessel
考题
单选题The deck plating on a ship is supported primarily by deck longitudinals and deck().A
girdersB
stanchionsC
framesD
beams
考题
单选题船上的船员属于三个部门:甲板部、轮机部和事务部。()A
Seamen on board the ship are in two departments: Deck Department, Engine Department.B
Seaman on board the ship are in two department: Deck Department, Engine Department and Service Department.C
The Deck Department and the Engine Department are the two departments.D
Seamen on board the ship are in three departments: the Deck Department, the Engine Department and the Service Department.
考题
单选题甲板分为艏楼甲板,主甲板和艉楼甲板。()A
The deck is divided into forecastle deck, main deck and poop deck.B
The deck is divided into forecastle deck, lower deck and main deck.C
The deck is divided into forecastle deck, main deck and lower deck.D
The deck is divided into main deck, lower deck and poop deck.
考题
单选题Stanchions prevent the entire deck load on a ship from being carried by the().A
bulkheadsB
stringersC
frames and beam bracketsD
deck longitudinals
考题
单选题Freeing ports on a vessel with soild bulwards().A
prevent stress concentration in the bulwarkB
permit easy jettison of deck cargo in an emergencyC
provide opening through the bulwarks for mooring linesD
allow water shipped on deck to flow off rapidly
考题
单选题The deck loads on a ship are distributed through the deck beams to the().A
framesB
hullC
stringersD
plates
考题
单选题For occasional heavy loads, two cranes can be arranged to work together. The operating () for deck crane motors may be hydraulic electric.A
principleB
mediumC
instructionD
voltage
考题
单选题The heavier outboard strake of deck plating on a ship is called the deck().A
stiffenerB
beamC
stringerD
doubler
考题
单选题A chock().A
is a deck fitting used to shackle gear to the deckB
permits easy jettisoning of deck cargo in an emergencyC
prevents stress concentration in the bulwarkD
provides openings through the bulwark for mooring lines
考题
单选题Cribbing is().A
wooden blocks or dunnage placed between a deck load and the deckB
the chains and shackles used to secure a deck cargoC
a crate in which a deck cargo is packagedD
cardboard separation pieces placed between deck loads to prevent chafing
考题
单选题The purpose of sheer in ship construction is to().A
allow the ship to ride waves with drier decksB
eliminate the need for butt strapsC
eliminate the need for margin platesD
give greater strength at the deck edge
考题
单选题主甲板以下是二层甲板。()A
The deck below the lower deck is known as ‘tween deck.B
The deck below the main deck is known as ‘tween deck.C
The deck above the main deck is known as ‘tween deck.D
The deck below the lower deck is known as main deck.
热门标签
最新试卷