173 The Risk of NOT meeting project quality objectives:

A. can be minimized through continuous monitoring.

B. considered a long term risk.

C. will be reflected in the "in-service" life of the product or service.

D. B and C

E. All of the above.


参考答案

更多 “ 173 The Risk of NOT meeting project quality objectives:A. can be minimized through continuous monitoring.B. considered a long term risk.C. will be reflected in the "in-service" life of the product or service.D. B and CE. All of the above. ” 相关考题
考题 Time management is the allocation of time in a project's life cycle through the process of:A.PlanningB.Estimating.C.Scheduling.D.ControllingE.All of the above.

考题 Of the following, who has the ultimate responsibility for meeting project quality objectives?A . Project EngineerB . Project ManagerC . Functional ManagerD . Quality Assurance ManagerE . Project Owner

考题 The Risk of NOT meeting project quality objectives:A . can be minimized through continuous monitoring.B . considered a long term risk.C . will be reflected in the "in-service" life of the product or service.D . B and CE . All of the above.

考题 The purpose of project Risk Management is to:A Identify those factors that will adversely impact project objectives.B Assess the impact of adverse project factors.C Assess the probability of adverse project factors.D A and CE All of the above.

考题 Project Risk Management is based on which of the following premises:A the future is unknown.B unknowns can result in risks or opportunities.C we cannot control risk events.D project risk impact can be measured and controlledE All of the above.

考题 The Quality Risk _____ .A is minimized through continuous monitoring.B is considered a long term risk.C will be reflected in the in-service life of the project result.D B and CE All of the above.

考题 Sensitivity analysis can be used in risk analysis to:A Substitute for uncertainty analysis in risk quantificationB estimate the level of risk aversion adopted by managementC estimate the effect of change of one project variable on the overall projectD A and BE All of the above.

考题 In Project Risk Management, Risk Response may include actions to:A reduce the probability of risk eventsB change the scope, budget, schedule or quality specifications of the projectC reduce the consequences or severity of impacts of a potential risk eventD A and CE All of the above.

考题 Which phase of the project life cycle typically has the highest uncertainty and risk associated with it?A conceptB developmentC executionD conclusionE All of the above.

考题 79 Time management is the allocation of time in a project's life cycle through the process of:A. PlanningB. Estimating.C. Scheduling.D. ControllingE. All of the above.

考题 85 The purpose of project Risk Management is to:A. Identify those factors that will adversely impact project objectives.B. Assess the impact of adverse project factors.C. Assess the probability of adverse project factors.D. A and CE. All of the above

考题 91 The Risk of NOT meeting project quality objectives:A. can be minimized through continuous monitoring.B. considered a long term risk.C. will be reflected in the "in-service" life of the product or service.D. B and CE. All of the above

考题 112 Of the following, who has the ultimate responsibility for meeting project quality objectives?A. Project EngineerB. Project ManagerC. Functional ManagerD. Quality Assurance ManagerE. Project Owner

考题 125 In Project Risk Management, Risk Response may include actions to:A. reduce the probability of risk eventsB. change the scope, budget, schedule or quality specifications of the projectC. reduce the consequences or severity of impacts of a potential risk eventD. A and CE. All of the above

考题 11 When a project manager is running over the budgeted costs, the project manager can typically _____ to attempt to get the project back on budget.A. Reduce features and/or functionalityB Increase risk.C. Incur a schedule slippage (to obtain more favorable pricing due to lengthened delivery times)D. All of the above.E. A and B only

考题 53 The Quality Risk _____ .A. is minimized through continuous monitoring.B. is considered a long term risk.C. will be reflected in the in-service life of the project result.D. B and CE. All of the above

考题 In Project Risk Management, Risk Response may include actions to:A. reduce the probability of risk eventsB. change the scope, budget, schedule or quality specifications of the projectC. reduce the consequences or severity of impacts of a potential risk eventD. A and CE. All of the above

考题 54 Variables quality data are:A. quantitative or qualitative dataB. quality data for which the product or service is designed and builtC. reflect measurements on a continuous scale of a characteristic of the produce or service.D. Indicate management's understanding of the concept of variabilityE. B and C only

考题 ●Different quality factors of software can be reflected upon user's different points of view,through product running,product modification and product transformation.Of the following properties,which one is connected with product running? (67) .Ⅰ.CorrectnessⅡ.RobustnessⅢ.re-use(67) A.ⅠB.ⅡC.Ⅰ,ⅡD.以上都是

考题 Project Quality Management must address the management of the project and the ()of the project.While Project Quality Management applies to all projects, regardless of the nature of their product,product quality measures and techniques are specific to the particular type of product produced by the project.()A.performance B.process C.product D.object

考题 ● Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance.(75) is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement, and failing to meet requirements.(75)A.Cost-Benefit analysisB.Control chartsC.Quality function deploymentD.Cost of quality analysis

考题 Different quality factors of software can be reflected upon user's different points of view, through product running, product modification and product transformation. Of the following properties, which one is connected with product running?(67).Ⅰ. correctnessⅡ. robustnessⅢ. re-useA.ⅠB.ⅡC.Ⅰ, ⅡD.以上都是

考题 Project Quality Management must address the management of the project and the(72)of the project. While Project Quality Management applies to all projects, regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.A.performanceB.processC.productD.object

考题 Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance.( ) is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement, and failing to meet requirements.A.Cost-Benefit analysis B.Control charts C.Quality function deployment D.Cost of quality analysis

考题 Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance. () is a method that analyze all the costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement, and failing to meet requirements.A.Cost-Benefit B.Control charts C.Quality function deployment D.Cost of quality analysis

考题 Project Quality Management must address the management of the project and the() of the project. While Project Quality Management applies to all projects, regardless of the nature of their product, product quality measures and techniques are specific to the particular type of product produced by the project.A、performanceB、processC、productD、object

考题 Project Quality Management processes include all the activities of the()that determine quality policies, objectives and responsibilities so that the project will satisfy theneeds for which it was undertaken.A、ProjectB、project management teamC、performingorganizationD、customer