网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

Should the Vessel become an actual,constructive or compromised ______ before delivery the deposit together with interest earned shall be released immediately to the Buyers whereafter this Agreement shall be null and void.

A.entirely damaged

B.prejudice

C.total loss

D.injury


参考答案

更多 “ Should the Vessel become an actual,constructive or compromised ______ before delivery the deposit together with interest earned shall be released immediately to the Buyers whereafter this Agreement shall be null and void.A.entirely damagedB.prejudiceC.total lossD.injury ” 相关考题
考题 (b) A summary of the information needed to satisfy our obligations under the money laundering legislation andany action that should be taken before agreeing to become tax advisers to the Saturn Ltd group. (5 marks)

考题 Before signing the delivery note, you should check that the consignment is complete. What does "delivery note" mean in Chinese?A、交货单B、便条C、存款单D、资信证明

考题 ________ the vessel have no safety radiotelegraphy certificate at the time of her delivery,she ________ be held to be unseaworthy.A.If/mayB.Will/shallC.Should/wouldD.Would/should

考题 Before a Master relieves a Pilot of the conn,the ______.A.Master should foresee any danger to the vessel on the present courseB.vessel must be in extremisC.Master should agree to sign a release of liability formD.Master must first request the Pilot to take corrective action

考题 Delivery of a vessel to a charterer is called ______.A.charteringB.dispatchingC.fixingD.tendering

考题 When the Vessel is at the place of delivery and in every respect physically ready for delivery in accordance with this Agreement,the Sellers shall give the Buyers a written ______ for delivery.A.information of the of the vesselB.Notice of ReadinessC.Declaration of the Condition of the VesselD.Declaration of DWT or Net DWT

考题 A vessel has been damaged by fire. The survey shows the cost of repairs will exceed the value of the repaired vessel. This is an example of a(n) ______.A.constructive total lossB.salvage lossC.actual lossD.preferred loss

考题 The Shipowner may do what is reasonable ______ any of these liens in view of the fact that they are possessory liens,i.e. they can only be enforced by retaining actual or constructive possession of the cargo.A.to delayB.to arrangeC.to sustainD.to maintain

考题 The liability of the carrier for the economic losses resulting from delay in delivery of the goods shall be limited to the amount equivalent to ______.A.actual value of the goods so lostB.the difference between the values of the goods before and after the damageC.the expenses for the repairD.the freight payable for the goods so delayed

考题 Which operating procedure(s)should be adhered to on a Ro-Ro vessel ________.A.One officer assigned to oversee the initial loading and lashingB.All lashings should be completed before leaving portC.Periodic inspection and retensioning of lashings during the voyageD.All of the above

考题 All the damage and shortage,______ those incurred after discharge and before delivery to receivers,should be noted in the discharging report.A.IncludingB.BesidesC.ExceptD.In addition to

考题 Before personnel are lifted from a vessel in a personnel basket, the vessel should be ______.A.directly under the boomB.moving away from the boomC.stopped dead in the waterD.tied ti the boom

考题 翻译:Prior to delivery and redelivery of the vessel the parties shall each appoint surveyors。

考题 单选题Should the vessel have no deratisation certificate at the time of her delivery,she()be held to be unseaworthy.A shallB shouldC mayD would

考题 单选题A mortgagee does not acquire a right to the freight()he has taken actual or constructive possession of the ship.A whereB ifC andD unless

考题 单选题All the damage and shortage,()those incurred after discharge and before delivery to receivers, should be noted in the discharging report.A includingB besidesC exceptD in addition to

考题 单选题Before personnel are lifted from a vessel in a personnel basket,the vessel should be().A directly under the boomB moving away from the boomC stopped dead in the waterD tied to the boom

考题 单选题When a vessel changes course from one cardinal heading to another cardinal heading whilea djusting the compass,which action should be taken?()A The course change should be made rapidly to prevent transient induced magnetism while passing the intercardinal headingsB After the new heading is reached,the vessel should steam on that course for at least two minutes before the adjustmentC During the course change,you should gently tap the compass to remove any error caused by friction on the pivot bearingD After steadying on the new heading,the compass card should be slewed by a magnet and allowed to oscillate freely to remove any gaussin error

考题 单选题If the Sellers anticipate that,notwithstanding the exercise of due diligence by them,the Vessel will not be ready for delivery by the canceling date they may notify the Buyers in writing()stating the date when they anticipate that the Vessel will be ready for delivery.A the date of declarationB date of Notice of ReadinessC the canceling dateD the date of delivery

考题 单选题()the vessel have no safety radiotelegraphy certificate at the time of her delivery,she()be held to be unseaworthy.A If/mayB Will/shallC Should/wouldD Would/should

考题 单选题You are anchoring in 16 fathoms of water.On a small to medium size vessel,the().A Anchor may be dropped from the hawse pipeB Anchor should be lowered to within 2 fathoms of the bottom before being droppedC Scope should always be at least ten times the depth of the waterD Scope should always be less than 5 times the depth of the water

考题 单选题Before a Master relieves a Pilot of the conn,the ().A Master should foresee any danger to the vessel on the present courseB vessel must be in extremisC Master should agree to sign a release of liability formD Master must first request the Pilot to take corrective action

考题 单选题No claim for constructive total loss based upon the cost of recovery and/or repair of the Vessel shall be recoverable hereunder unless such cost would exceed().A the stated valueB the sound valve of the vessel at the time of occurrenceC the lost valueD the insured value

考题 单选题If a vessel takes a sudden,severe list or trim from an unknown cause,you should FIRST().A determine the cause before taking countermeasuresB assume the shift is due to off-center loadingC counterfloodD assume the cause is environmental forces

考题 单选题When the Vessel is at the place of delivery and in every respect physically ready for delivery in accordance with this Agreement,the Sellers shall give the Buyers a written()for delivery.A information of the of the vesselB Notice of ReadinessC Declaration of the Condition of the VesselD Declaration of DWT or Net DWT

考题 单选题Should the Vessel become an actual,constructive or compromised()before delivery the deposit together with interest earned shall be released immediately to the Buyers whereafter this Agreement shall be null and void.A entirely damagedB prejudiceC total lossD injury

考题 单选题Delivery of a vessel to a charterer is called().A charteringB dispatchingC fixingD tendering