______ is not a proper instruction for laying hatch beams.
A.to be laid on their sides
B.to be stood on edge close together
C.be lashed
D.be covered
参考答案
更多 “ ______ is not a proper instruction for laying hatch beams.A.to be laid on their sidesB.to be stood on edge close togetherC.be lashedD.be covered ” 相关考题
考题
____________, Newton was thinking and thinking.A、He lied under the apple treeB、Laying under the apple treeC、He laid under the apple treeD、Lying under the apple tree
考题
______ is known as a long hatch during loading operation.A.The largest hatch of a shipB.The hatch that is double riggedC.The hatch where a disproportionate amount of cargo is stowedD.The hatch where the most cargo is stowed
考题
When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ______.A.Provide the proper trimB.Prevent negative stability from developingC.Prevent excessive longitudinal stressesD.Control list
考题
Tonnage openings must be closed by means of ______.A.Press boardB.Steel hatch boardsC.Steel platesD.Wooden hatch boards
考题
______ is not a proper instruction for handling hatch covers.A.not to obstruct clear fore-and-aft passagewaysB.not to obstruct coaming-to-bulwark passagewaysC.to be lashed or otherwise secured to prevent accidental dislodgementD.to be laid on their sides
考题
What publications should a GMDSS Operator consult regarding the proper set-up and operation of vessel equipment ________.A.ITU PublicationsB.The manufacturers instruction manualsC.Part 90 of the FCC Rules and RegulationsD.Code of Federal Regulations,Title 47,Part 80,Subpart W
考题
______ is not a proper form for Muster lists.A.A separate card given to each crew memberB.A separate instruction booklet given to each crew memberC.A card fixed in each cabin with instructions for the occupant of the cabinD.A well prepared notice posted on water-tight doors and/or in chart-room
考题
The boy( )when he said that he ( )the eggs( )by the hen in the closet before he( )down to have a rest。A.was lying,had laid,laid,lay
B.had laid,lay,laid,was lying
C.lay,was lying,lain, lay
D.laid,lay,lain,lies
考题
2号舱口处的起货机出故障了。()A、There is something wrong with the derrick at hatch No.2.B、There is something wrong with the derrick at hatch No.1.C、There is something wrong with the winch at hatch No.2.D、There is something wrong with the winch at hatch No.1.
考题
Our practices are conformable to the requirements()by international organizations.A、laid downB、lied downC、layd ownD、laid out
考题
If there is a fire in a hold, what should you do?()A、Close the hatch, accesses and ventilators at once. Flood CO2 into hold.B、Open the hatch, accesses and ventilators at once. Flood CO2 into hold.C、Close the hatch, accesses and ventilators at once. Flood water into hold.D、Open the hatch, accesses and ventilators at once. Flood water into hold.
考题
单选题请把吊杆甩到舱口上方好吗?()A
Will you please swing the heavy derrick over the hatch?B
Will you please swing the derrick over the hatch?C
Will you please lower the derrick over the hatch?D
Will you please top the heavy derrick over the hatch?
考题
单选题In preparing a cargo space for receipt of a shipment of bagged cargo,which instruction for laying dunnage should be followed? ()A
Use either 1 or 2 tiers of dunnage,spacing the pieces in each tier a foot apart,and lay pieces in the bottom tier diagonally to the ship's sideB
Use 1 tier of dunnage,laying the pieces tightly together to form a solid floor over the steel deckC
Use 2 tiers of dunnage,spacing the pieces in the bottom tier about a foot apart and the pieces in the top tier 6 inches apartD
Use 2 tiers of dunnage,spacing the pieces in the bottom tier about a foot apart and the pieces in the top tier together
考题
单选题Tell me(),please.A
which hatch will be loaded firstB
will which hatch be loaded firstC
will hatch of which be loaded firstD
first will which hatch be loaded
考题
单选题我船配有自动舱盖。()A
Our ship is equipped with automatic hatch covers.B
Our ship is equipped with folding-type hatch covers.C
Our ship is equipped with side-rolling hatch covers.D
Our ship is equipped with rolling-type hatch covers.
考题
单选题Are you testing the()(液压舱盖)?A
hydraulic hatch coverB
hydraulic release unitC
hydraulic oil jackD
automatic hatch cover
考题
单选题Tonnage openings must be closed by means of().A
Press boardB
Steel hatch boardsC
Steel platesD
Wooden hatch boards
考题
单选题The()(侧滚式舱盖) runs along the guide rail.A
rolling type hatch coverB
side-rolling hatch coverC
folding type hatch coverD
automatic hatch cover
考题
单选题装卸货之前,打开舱盖。()A
After loading and discharging, hatch covers will be opened.B
After loading and discharging, hatch covers will be closed.C
Before loading and discharging, hatch covers will be opened.D
Before loading and discharging, hatch covers will be closed.
考题
单选题每一个舱盖由两个或更多的盖板组成。()A
Each hatch consists of two panels.B
Each hatch cover consists of two panels.C
Each hatch consists of two or more panels.D
Each hatch cover consists of two or more panels.
考题
单选题()is known as a long hatch during loading operation.A
The largest hatch of a shipB
The hatch that is double riggedC
The hatch where a disproportionate amount of cargo is atowedD
The hatch where the most cargo is stowed
考题
单选题What publications should a GMDSS Operator consult regarding the proper set-up and operation of vessel equipment().A
ITU PublicationsB
The manufacturers instruction manualsC
Part 90 of the FCC Rules and RegulationsD
Code of Federal Regulations,Title 47,Part 80,Subpart W
考题
单选题The()(折叠式舱盖) can fold slowly.A
rolling type hatch coverB
side-rolling hatch coverC
folding type hatch coverD
automatic hatch cover
考题
单选题The proper place()the sling is made up is the square of the hatch.A
whichB
whereC
whenD
how
考题
单选题When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ().A
provide the proper trimB
prevent negative stability from developingC
prevent excessive longitudinal stressesD
control list