网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
SMB network decision makers commonly site which of the following as typical network requirements?()
A
scalability, effectiveness, high availability, mobility
B
cost effectiveness, high availability, hosting multiple protocols, hosting webservers
C
QoS, multicast, cost effectiveness, redundancy
D
centralization, security, highly available, scalability
参考答案
参考解析
解析:
暂无解析
更多 “单选题SMB network decision makers commonly site which of the following as typical network requirements?()A scalability, effectiveness, high availability, mobilityB cost effectiveness, high availability, hosting multiple protocols, hosting webserversC QoS, multicast, cost effectiveness, redundancyD centralization, security, highly available, scalability” 相关考题
考题
An internet is a combination of networks connected by (71) .When a datagram goes from a source to a (72) ,it will probably pass many (73) until it reaches the router attached to the destination network.A router receives a (74) from a network and passes it to another network.A router is usually attached to several networks.When it receives a packet,to which network should it pass the packet? The decision is based on optimization: Which of the available (75) is the optimum pathway?A.modemsB.routersC.switchesD.computers
考题
Which one of the following is the most commonly used layer 2 network device?()
A. HubB. BridgeC. SwitchD. RouterE. RepeatersF. None of the above
考题
If A customers needed to load-balance across multiple data center. which Cisco product would the customer consider?()A、ACE Global Site SelectorB、Site BalancerC、ISR Wide Area Acceleration ServerD、Nexus Site BalancerE、ASR Virtual Balanced Network
考题
According to findings of the bMightyResearch report, which two statements about UC Solutions accurately describe the attributes of SMB decision makers?()A、Only 20% of decision makers understand UC solutions.B、They are generally well-educated on what UC solutions offer.C、Many are yet to be convinced of the need for UC.D、They have a tendency to support current telephony vendors.
考题
Which statements describes the remote sites in a Cisco Single-Site Secure Network Foundation solution with remote teleworkers?()A、They are separate from the central site and use NAT to route through the Internet to the Central SiteB、They are part of the VLANs at the Central Site; they are in the same subnetsC、They use public IP Addresses that are routable through the InternetD、They are in separate subnets but are part of the private address space of the network
考题
Customer concerns about technology maturity, cost effectiveness, quality of work life, and increased productivity and accuracy drive product demand in which SMB technology sector?()A、securityB、wirelessC、network storageD、e-commerceE、switching and routing
考题
Choose the most accurate statement regarding the account qualification and planning service component in the prepare phase.()A、 providing a partner with information regarding customer acceptance of a new solutionB、 providing information regarding current network infrastructure readinessC、 using stakeholder interviews to identify stakeholders and decision-makers high-level solutionrequirements timelines and the scope of an opportunityD、 adjusting a solution to account for a customer’s physical site characteristics
考题
If A customers needed to load-balance across multiple data center. which Cisco productwould the customer consider?()A、ACE Global Site SelectorB、Site BalancerC、ISR Wide Area Acceleration ServerD、Nexus Site BalancerE、ASR Virtual Balanced Network
考题
For which two reasons are Integrated Services Routers well-positioned for the SMB market?()A、They are integrated with firewall capabilities.B、They scan packets for malicious activity.C、They offer superior site-to-site routing.D、They require no configuration to install.E、They offer the best choice for remote access needs.
考题
Which one of the following is the most commonly used layer 2 network device?()A、HubB、BridgeC、SwitchD、RouterE、RepeatersF、None of the above
考题
Which three items should the site survey documentation include?()A、photographsB、floor plansC、wired network layoutD、blueprints
考题
During which phase of the steps to success methodology for Cisco SMB Security Solutions would the Network Readiness Assessment be used to assess the readiness of an existing network infrastructure and determine which,if any modification should be prior to implementation?()A、PrepareB、DesignC、PositionD、DevelopE、PlanF、Perform
考题
There are multiple network interfaces on a server. Which parameters must you set in smb.conf to limit on which interfaces Samba will accept connections? ()A、 listen interfaces B、 bind interfaces only C、 interfaces D、 listen address
考题
多选题There are multiple network interfaces on a server. Which parameters must you set in smb.conf to limit on which interfaces Samba will accept connections? ()Alisten interfacesBbind interfaces onlyCinterfacesDlisten address
考题
单选题Which statements describes the remote sites in a Cisco Single-Site Secure Network Foundation solution with remote teleworkers?()A
They are separate from the central site and use NAT to route through the Internet to the Central SiteB
They are part of the VLANs at the Central Site; they are in the same subnetsC
They use public IP Addresses that are routable through the InternetD
They are in separate subnets but are part of the private address space of the network
考题
多选题On a Cisco network, which of the following modes of flow control are commonly used to mitigate the effects of busy data networks?()ASource Quench.BLearning.CBuffering.DWindowing.ECut-Through.
考题
单选题Which one of the following is the most commonly used layer 2 network device?()A
HubB
BridgeC
SwitchD
RouterE
RepeatersF
None of the above
考题
单选题Choose the most accurate statement regarding the account qualification and planning service component in the prepare phase. Select exactly 1 answer(s) from the following:()。A
providing a partner with information regarding customer acceptance of a new SolutionB
providing information regarding current network infrastructure readinessC
using stakeholder interviews to identify stakeholders and decision-makers, high-level solution requirements, timelines, and the scope of an opportunityD
adjusting a solution to account for a customers physical site characteristics
考题
单选题During which phase of the steps to success methodology for Cisco SMB Security Solutions would the Network Readiness Assessment be used to assess the readiness of an existing network infrastructure and determine which,if any modification should be prior to implementation?()A
PrepareB
DesignC
PositionD
DevelopE
PlanF
Perform
考题
单选题According to the passage, which of the following is RIGHT?A
It’s difficult to satisfy everyone.B
The cultural site is not so important.C
It’s easy to make a decision on the problem.D
The villagers will lose their jobs with the development of their hometown
考题
单选题During which phase of the steps to success methodology for Cisco SMB security solutions would the Network Readiness Assessment be used to assess the readiness of an existing network infrastructure and determine which, if any, modification should be made prior to implementation?()A
PositionB
PrepareC
DesignD
PerformE
Plan
考题
单选题If A customers needed to load-balance across multiple data center. which Cisco productwould the customer consider?()A
ACE Global Site SelectorB
Site BalancerC
ISR Wide Area Acceleration ServerD
Nexus Site BalancerE
ASR Virtual Balanced Network
考题
多选题For which two reasons are Integrated Services Routers well-positioned for the SMB market?()AThey are integrated with firewall capabilities.BThey scan packets for malicious activity.CThey offer superior site-to-site routing.DThey require no configuration to install.EThey offer the best choice for remote access needs.
考题
单选题If A customers needed to load-balance across multiple data center. which Cisco product would the customer consider?()A
ACE Global Site SelectorB
Site BalancerC
ISR Wide Area Acceleration ServerD
Nexus Site BalancerE
ASR Virtual Balanced Network
考题
单选题An internet is a combination of networks connected by (1). When a datagram goes from a source to a (2), it will probably pass many (3) until it reaches the router attached to the destination network. A router receives a (4) from a network and passes it to another network. A router is usually attached to several networks. When it receives a packet, to which network should it pass the packet? The decision is based on optimization: Which of the available (5) is the optimum pathway?
空白(4)处应选择()A
destinationB
resourceC
packetD
source
考题
多选题According to findings of the bMightyResearch report, which two statements about UC Solutions accurately describe the attributes of SMB decision makers?()AOnly 20% of decision makers understand UC solutions.BThey are generally well-educated on what UC solutions offer.CMany are yet to be convinced of the need for UC.DThey have a tendency to support current telephony vendors.
考题
单选题Choose the most accurate statement regarding the account qualification and planning service component in the prepare phase.()A
providing a partner with information regarding customer acceptance of a new solutionB
providing information regarding current network infrastructure readinessC
using stakeholder interviews to identify stakeholders and decision-makers high-level solutionrequirements timelines and the scope of an opportunityD
adjusting a solution to account for a customer’s physical site characteristics
热门标签
最新试卷