网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Guide tolerances during elevation of the jack-up rig will().
A
reduce spud can bearing pressure
B
keep the unit level and reduce overloading
C
reduce stresses on the hull
D
minimize the potential for punch-through
参考答案
参考解析
解析:
暂无解析
更多 “单选题Guide tolerances during elevation of the jack-up rig will().A reduce spud can bearing pressureB keep the unit level and reduce overloadingC reduce stresses on the hullD minimize the potential for punch-through” 相关考题
考题
A good tour guide tells visitors().A. What they couldn't miss during the tripB. What during the trip they couldn't missC. What couldn't miss they during the trip
考题
Ropes of wires attached to derricks to prevent them from swinging during cargo handling operations are ______.A.PreventersB.Side ropesC.StaysD.Guide lines
考题
A jack-up drilling rig being towed must ______.A.turn off all lights that interfere with the navigation lightsB.turn on all available working lights on deckC.ring the bell rapidly for five seconds once a minuteD.display two black diamonds in a vertical line during the day
考题
It is the responsibility of the person in charge to ______.A.revise the operating manual when rig personnel changeB.be fully aware of the provisions in the operating manualC.maintain the rig's construction portfolioD.All of the above
考题
OAG的全称是( )。
A.Official Airlines Guide
B.Official Airways Guide
C.Online Airlines Guide
D.Online Airways Guide
考题
OAG的全称是()。A.OffiCiAl Airlines GuiDE.B.OffiCiAl AirwA.ys GuiDE.C.Online Airlines GuiDE.D.Online AirwA.ys GuiDe
考题
把引航员梯装在下风舷。()A、Fit the rope ladder in the lee side.B、Rig the rope ladder in the lee side.C、Rig the pilot ladder on the lee side.
考题
The running wheel runs along ()on top of the hatch coaming.A、the guide railB、the guide ropeC、the side coamingD、the guide roller
考题
What other type of document accompanies the SAPR Guide to provide guidelines and pointers for use during Pre-Sale Reviews? ()A、TechdocsB、Process GuideC、Product ChecklistsD、Site Planning Guide
考题
单选题The purpose of a preventer as it is used on a conventional yard and stay cargo rig is to().A
allow greater than normal loads to be handled by the gearB
act as an inboard guy in the event the inboard guy parts during cargo handlingC
assist the outboard guy in supporting stresses during cargo handlingD
prevent the inboard guy from parting due to stresses during cargo handling
考题
单选题When cargo aboard a jack-up in transit becomes adrift,the tow vessel should be asked to ().A
turn into the seasB
turn to be parallel to the seasC
reduce speedD
increase speed
考题
单选题The plunger is machined to very fine tolerances, as is the matched()in which it reciprocates.A
barrelB
ramC
pistonD
rod
考题
单选题Maintaining the close tolerances in diesel fuel pumps and injectors requires the use of().A
fuel/water separatorsB
day tanksC
injector test standD
fuel filters
考题
单选题The running wheel runs along ()on top of the hatch coaming.A
the guide railB
the guide ropeC
the side coamingD
the guide roller
考题
问答题Practice 1 Suppose you had a bad cold during your last trip to a famous mountain. The tourist guide has helped you a lot. Write a letter of thanks to the travel agency. Your letter should include: (1) a description of your case (2) thanks to the tourist guide and the travel agency You should write approximately 100 words. Do not sign your own name at the end of the letter. Use “Wang Lin” instead.
考题
单选题Fighting a rig fire in a watertight compartment with hoses could reduce the stability of the rig by().A
progressive downfloodingB
reducing the level of drill water from the storage tanksC
causing a list due to the water in the compartmentD
reducing the KG to minimum allowable
考题
单选题The muster list shows each rig hand’s muster station,his duties during abandonment,basic instructions,and().A
all emergency signalsB
instructions for lowering the survival craftC
the time each weekly drill will be heldD
work schedule
考题
单选题During transfer operations,a quantity of propylamine spills on deck. According to the Chemical Data Guide,the correct procedure would be to().A
immediately flush the spill with large quantities of fresh waterB
cover the contaminated surface with soda-ash-soaked lime solutionC
add sodium bisulfate on the contaminated surface and spray it down with waterD
move to a position upwind of the spill and allow the product to boil off
考题
单选题Before replacing a piston you should check the rings to see that all clearances and gaps are () the permissible tolerances.A
aboveB
atC
overD
within
考题
单选题It is the responsibility of the person in charge to().A
revise the operating manual when rig personnel changeB
be fully aware of the provisions in the operating manualC
maintain the rig's construction portfolioD
All of the above
考题
单选题A jack-up drilling rig being towed must().A
turn off all lights that interfere with the navigation lightsB
turn on all available working lights on deckC
ring the bell rapidly for five seconds once a minuteD
display two black diamonds in a vertical line during the day
考题
单选题Where would you find the call sign or call letters of the radio station on your ship?()A
In the rig safety manualB
On the Certificate of InspectionC
On the Ship Station LicenseD
On the rig Watch Bill
考题
单选题Where would you find the “call sign” or “call letters”of the radio station on your rig?()A
In the rig safety manualB
On the Certificate of InspectionC
On the Ship Station LicenseD
On the rig Watch Bill
热门标签
最新试卷