哪些方法可以避免ACCA考试中丢分,速来get小技巧!

发布时间:2020-02-18


ACCA考场中很多小技巧都可以有助于我们进行良好的发挥,说不定关键时候可以帮助我们提升3-5分的关键分数。那么,哪些小技巧可以帮助我们提分呢?一起来看看以下内容吧,希望能够帮助到大家。

01、填写信息,稳定情绪

试卷发下来后,立即忙于答题是不科学的,应先填写信息,写清姓名和准考证号等,这样做不仅是考试的要求,更是一剂稳定情绪的“良药”。

02、总揽全卷,区别难易

打开试卷,看看哪些是基础题,哪些是中档题,哪些是难题或压轴题,按先易后难的原则,确定解题顺序,逐题进行解答。

力争做到“巧做低档题,题题全做对;稳做中档题,一分不浪费;尽力冲击高分题,做错也无悔。”

03、认真审题,灵活答题

审题要做到一不漏掉题,二不看错题,三要审准题,四要看全题目的条件和结论。

审题中还要灵活运用知识,发现和寻找简捷的解题方法。

04、过程清晰,稳中求快

一要书写清晰,速度略快;

二要一次成功;

三要提高答题速度;

四要科学使用草稿纸;

五要力求准确,防止欲速不达。

05、心理状态,注意调节

考试中,要克服满不在乎的自负心理,要抛弃“胜败在此一举”的负重心理,要克服畏首畏尾的胆怯心理。面对难、中、易的试卷,调节好心理,积极应对。

06、尽量多做,分分必争

ACCA考试评分,多按步骤、按知识点给分、按要点给分,毕竟ACCA考试费用不低。

因此,考生在答题时,就要会多少,答多少,哪怕是一条辅助线,一个符号,一小段文字,都可写上,没有把握也要敢于写,千万不要将不能完全做出或答案算不出的题放弃不做。

07、抓住题眼,构建桥梁

一般难题都有个关键点(称之为题眼”),抓住了题眼,问题就易于解决了。

此外,还要利用相关的知识、规律、信息进行多方联系,构建“桥梁”,找出问题的内在联系,从而构思解题方案,准确、快捷地解决问题。

好的,以上就是今天51题库考试学习网为大家分享的全部内容,在此,51题库考试学习网祝愿大家取得好成绩并在未来的工作道路上一帆风顺!如有其他疑问请继续关注51题库考试学习网!


下面小编为大家准备了 ACCA考试 的相关考题,供大家学习参考。

On 1 April 2009 Pandar purchased 80% of the equity shares in Salva. The acquisition was through a share exchange of three shares in Pandar for every five shares in Salva. The market prices of Pandar’s and Salva’s shares at 1 April

2009 were $6 per share and $3.20 respectively.

On the same date Pandar acquired 40% of the equity shares in Ambra paying $2 per share.

The summarised income statements for the three companies for the year ended 30 September 2009 are:

The following information is relevant:

(i) The fair values of the net assets of Salva at the date of acquisition were equal to their carrying amounts with the exception of an item of plant which had a carrying amount of $12 million and a fair value of $17 million. This plant had a remaining life of five years (straight-line depreciation) at the date of acquisition of Salva. All depreciation is charged to cost of sales.

In addition Salva owns the registration of a popular internet domain name. The registration, which had a

negligible cost, has a five year remaining life (at the date of acquisition); however, it is renewable indefinitely at a nominal cost. At the date of acquisition the domain name was valued by a specialist company at $20 million.

The fair values of the plant and the domain name have not been reflected in Salva’s financial statements.

No fair value adjustments were required on the acquisition of the investment in Ambra.

(ii) Immediately after its acquisition of Salva, Pandar invested $50 million in an 8% loan note from Salva. All interest accruing to 30 September 2009 had been accounted for by both companies. Salva also has other loans in issue at 30 September 2009.

(iii) Pandar has credited the whole of the dividend it received from Salva to investment income.

(iv) After the acquisition, Pandar sold goods to Salva for $15 million on which Pandar made a gross profit of 20%. Salva had one third of these goods still in its inventory at 30 September 2009. There are no intra-group current account balances at 30 September 2009.

(v) The non-controlling interest in Salva is to be valued at its (full) fair value at the date of acquisition. For this

purpose Salva’s share price at that date can be taken to be indicative of the fair value of the shareholding of the non-controlling interest.

(vi) The goodwill of Salva has not suffered any impairment; however, due to its losses, the value of Pandar’s

investment in Ambra has been impaired by $3 million at 30 September 2009.

(vii) All items in the above income statements are deemed to accrue evenly over the year unless otherwise indicated.

Required:

(a) (i) Calculate the goodwill arising on the acquisition of Salva at 1 April 2009; (6 marks)

(ii) Calculate the carrying amount of the investment in Ambra to be included within the consolidated

statement of financial position as at 30 September 2009. (3 marks)

(b) Prepare the consolidated income statement for the Pandar Group for the year ended 30 September 2009.(16 marks)

正确答案:

(b) Discuss the limitations of the above estimates. (6 marks)

正确答案:

(b) The estimates are based upon unrealistic assumptions and are subject to a considerable margin of error. Possible limitations
include:
(i) Sales, operating costs, replacement investments, and dividends are unlikely to increase by the same amount.
(ii) Forecasts of future growth rates may not be accurate. Paxis is unlikely to have access to enough internal information
about the activities of Wragger to make accurate projections.
(iii) The expected reduction in operating costs might not be achieved.
(iv) The estimates are based upon present values to infinity of expected free cash flows. A shorter time horizon might be
more realistic.
(v) The cost of capital for the combined company could differ from that estimated, depending how the market evaluates the
risk of the combined entity.
(vi) The analysis is based upon the assumption that the initial offer price is accepted.
(vii) There is no information about the fees and other costs associated with the proposed acquisition. In many cases these
are substantial, and must be included in the analysis.
(viii) The post acquisition integration of organisations often involves unforeseen costs which would reduce the benefit of any
potential synergy.


(b) Examine how adopting a Six Sigma approach would help address the quality problems at UPC.

(10 marks)

正确答案:
(b) In many ways Six Sigma started out as a quality control methodology. It focused on measurement and the minimisation of
faults through pursuing Six Sigma as a statistical measure of some aspects of organisational performance. However, Six Sigma
has developed into something much more than a process control technique. It includes a problem-solving process called
DMAIC and a comprehensive toolkit ranging from brainstorming to balanced scorecards and process dashboards. It also has
defined team roles for managers and employees, often with martial arts names such as Black Belt, Green Belt and Master
Black Belt.
Six Sigma was first used in organisations in the early 1990s. However, it was its adoption and promotion by Jack Welch, the
CEO of GE that brought Six Sigma wider publicity. He announced that ‘Six Sigma is the most important initiative GE has ever
undertaken’. As Paul Harmon comments, ‘Welch’s popularity with the business press, and his dynamic style, guaranteed that
Six Sigma would become one of the hot management techniques of the late 1990s’.
Six Sigma uses an approach called DMAIC in its problem solving process. This stands for Define, Measure, Analyse, Improve
and Control. Three aspects of this are considered below in the context of how they would address the problems at UPC.
Defining the problem
Part of defining the problem is the identification of the customer. It is important to understand what customers really want
and value and one of the main themes of Six Sigma is its focus on the customer. Six Sigma explicitly recognises the ‘voice of
the customer’ (VOC) in its approach. In the UPC situation quality requirements are currently defined by the physical condition
of the goods and by the alignment of the image. However, this may be a limiting view of quality because there is no evidence

of any systematic investigation of the requirements of the customer. Solving these problems may not lead to any significant
long-term gain; they may be quickly replaced by other ‘quality issues’. Furthermore, the customer is also perceived in a limited
way. These quality requirements are in the eye of the gift shop owner who is interested in saleable products. The end customer
– the consumer – who buys and uses the product may have other requirements which can also be addressed at this time.
By considering the VOC the problem and scope of the project becomes re-defined and the solution of the problems potentially
more valuable.
Measurement
Measurement is fundamental to Six Sigma. This includes the gathering of data to validate and quantify the problem. The
creation of the inspection team was based on initial evidence about an increase in breakages. This needs to be quantified.
The inaccurate printing of the image had been quantified as 500 units per month, out of the 250,000 shipped out of the
company. This equates to a failure rate of 0·2%, so that 99·8% of items are shipped with a correctly aligned image. This
sounds quite reasonable but it still raises issues and complaints that have to be dealt with, as well as creating wastage costs
of $10,000 per month. The problem is that even a relatively low percentage of defects can lead to a lot of unhappy customers.
Aiming for Six Sigma would reduce defects down to about one faulty item per month, reducing the wastage cost to $20.
Analysis
Analysis is concerned with understanding the process to find the root cause. Six Sigma focuses on processes and their
analysis. Analysis concerns methods, machines, materials, measures, Mother Nature and people. The alignment problem
needs investigation to find out what causes the imaging machine to irregularly produce misaligned images. Management
currently appear to blame the machine but it may be due to the way that certain people load the machine. The analysis of
the breakages is particularly important. It is unclear at present where these breakages occur (for example, are some of the
items broken before they leave UPC’s despatch facility) or are they all broken in transit? Neither is it understood why the
breakages occur. Management appear to blame the packers for packing incorrectly and not following the correct method.
However, it may be that the material is just not strong enough to withstand heavy handling by couriers who are outside the
control of UPC. Additionally, the breakages may be due to some manufacturing problem or raw material imperfection in the
items that break. Six Sigma stresses understanding the problem before solving it.
Although DMAIC has been selected as the framework for the sample answer, focusing on other aspects of Six Sigma would
be acceptable – as long as they are presented in the context of the UPC scenario.

声明:本文内容由互联网用户自发贡献自行上传,本网站不拥有所有权,未作人工编辑处理,也不承担相关法律责任。如果您发现有涉嫌版权的内容,欢迎发送邮件至:contact@51tk.com 进行举报,并提供相关证据,工作人员会在5个工作日内联系你,一经查实,本站将立刻删除涉嫌侵权内容。