A load line for a ship is assigned by the().
A
Minerals Management Service
B
Department of Energy
C
Corps of Engineers
D
A recognized classification society approved by the Coast Guard
参考答案
参考解析
解析:
暂无解析
更多 “单选题A load line for a ship is assigned by the().A Minerals Management ServiceB Department of EnergyC Corps of EngineersD A recognized classification society approved by the Coast Guard” 相关考题
考题
Compliance with the terms of the load line certificate on a ship is the responsibility of the ______.A.Ballast Control OperatorB.Barge SupervisorC.Master or Offshore Installation ManagerD.operators representative
考题
Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding ______.A.18 monthsB.2 yearsC.3 yearsD.5 years
考题
A load line for a ship is assigned by the ______.A.Minerals Management ServiceB.Department of EnergyC.Corps of EngineersD.A recognized classification society approved by the Coast Guard
考题
When must the Master or person in charge of a ship log the position of load line marks in relation to the surface of the water in the logbook?A.Once a dayB.At the change of every watchC.Only when in fresh or brackish waterD.Prior to getting underway
考题
The document that certifies the correctness of the load line marks on a ship is called the ______.A.Certificate of InspectionB.Load line certificateC.Certificate of DocumentationD.SOLAS Certificate
考题
A load line of a ship is assigned by ______.A.Minerals Management ServiceB.Department of EnergyC.Corps of EngineersD.A recognized classification society approved
考题
单选题The downflooding angle for a ship is the maximum angle at which().A
stability is positiveB
neutral equilibrium existsC
the load line is not submergedD
intact stability curves are valid
考题
单选题The downflooding angle for a ship is the minimum angle at which().A
the load line becomes submergedB
a non-watertight opening is at still water levelC
offset becomes excessiveD
reserve buoyancy is a maximum
考题
单选题Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().A
18 monthsB
2 yearsC
3 yearsD
5 years
考题
单选题Berthing means bringing a vessel to her berth until().A
the ship is made fastB
the ship‟s first line is sent ashoreC
the ship is dredging anchorD
the ship‟s pilot disembarks
考题
单选题When a ship is in tropical zone and in seawater of density 1025,she must not load to more than the upper edge of the line marked().A
SB
TC
WD
F
考题
单选题Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().A
LCGB
transverse momentC
righting momentD
inclining moment
考题
单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().A
INTERNATIONAL LOAD LINE CERTIFICATEB
PASSENGER SHIP SAFETY CERTIFICATEC
CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED
GENERAL DECLARATION
考题
单选题When a ship is in summer zone and in seawater of density1025,she must not load to more than the upper edge of the line marked().A
SB
TC
WD
F
考题
单选题A load line is assigned to a ship to insure adequate stability and().A
mooring tensionB
riser tensionC
lifesaving equipmentD
structural strength
考题
单选题Which is the summer load waterline on the load waterline mark?().A
The first line at the bottomB
The second line from the bottomC
The third line from the bottomD
The fourth line from the bottom
考题
单选题Compliance with the terms of the load line certificate on a ship is the responsibility of the().A
Ballast Control OperatorB
Barge SupervisorC
Master or Offshore Installation ManagerD
operators representative
考题
单选题A load line of a ship is assigned by the().A
minerals management serviceB
Department of energyC
corps of engineersD
a recognized classification socitey approved
考题
单选题The International Load Line Certificate is a document indicating () of the various load lines of the vessel.A
decksB
cabinsC
holdsD
positions
考题
单选题The holding power of an anchor is the().A
maximum sustained vertical load an anchor will resist before draggingB
maximum sustained horizontal load an anchor will resist before draggingC
maximum sustained vertical load an anchor will resist before the mooring line breaksD
maximum sustained horizontal load an anchor will resist before the mooring line breaks
考题
单选题The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().A
maximum counter weight requiredB
minimum horsepower requiredC
hoist rope strengthD
allowable load
考题
单选题()is not a static load.A
Actual weight of the ship's structure,outfitting,equipment and machineryB
Ballast load(weight)C
Cargo loadD
Slamming and sloshing load
考题
单选题The duration of an Internationl Load Line Exemption Certificate issued by an Administration to a ship exempted under paragraph(2) of article 6 shall not exceed。()A
2yearB
3yearsC
4yearsD
5years
考题
单选题Your assigned emergency station aboard ship can be found on the ship’s ()A
station billB
clearance papersC
certificate of inspectionD
permit to proceed
考题
单选题Which is the winter load waterline on the load waterline mark?().A
The line over the summer load waterlineB
The line above the tropical load waterlineC
The line below the tropical load waterlineD
The line between the summer and the winter north Atlantic load waterline
考题
单选题The document that certifies the correctness of the load line marks on a ship is called the ().A
Certificate of InspectionB
Load line certificateC
Certificate of DocumentationD
SOLAS Certificate
考题
单选题On a ship crane,the load chart relates the allowable load to the combination of boom length and().A
boom angleB
boom strengthC
load radiusD
cable strength