To ensure the quality of dock repair, C/E should know very well ()
A
the repair standard of main docking repair item
B
the special tool for repair item
C
the skill of repairer
D
the status of docking repair equipment
参考答案
参考解析
解析:
暂无解析
更多 “单选题To ensure the quality of dock repair, C/E should know very well ()A the repair standard of main docking repair itemB the special tool for repair itemC the skill of repairerD the status of docking repair equipment” 相关考题
考题
In the project environment, the individual ultimately responsible for quality control is:A . The line workers who must strive "to do things right the first time" to avoid quality problems.B . the company's quality control manager who must work with the project members to ensure the quality control program is effective.C . The head of the production department who retains ultimate quality control responsibility for all the company's projects.D . The project manager who has ultimate responsibility for the entire project.E . the customer who must ensure that he is receiving a quality product from the vendor.
考题
41 In the project environment, the individual ultimately responsible for quality control is:A. The line workers who must strive "to do things right the first time" to avoid quality problems. B. the company's quality control manager who must work with the project members to ensure the quality control program is effective.C. The head of the production department who retains ultimate quality control responsibility for all the company's projects.D. The project manager who has ultimate responsibility for the entire project.E.the customer who must ensure that he is receiving a quality product from the vendor
考题
● (73)is the application of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.(73)A. Quality assurance (QA)B. Quality planningC. Quality control (QC)D. Quality costs
考题
Although a ship usually has repair in a shipyard, ________ is also necessaryA.the general repair on boardB.the voyage repairC.the annual repairD.the dock repair
考题
______is the application of planned,systematic quality activities to ensure that the project will employ all processes needed to meet requirements.A.euality assurance(QA)B.Quality planningC.Quality control(QC)D.Quality costs
考题
● ()is the application ion of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.()A. Quality assurance (QA) B. Quality planningC. Quality control (QC) D. Quality costs
考题
We should very much like to help you in this matter, but we have already cut our prices down to the absolute minimum.We think you will find that our competitors are offering a product of considerably lower quality in order to compete at this price.(英译中)
考题
What is NOT true about overhaul repair?( )
A.Overhaul repair is a major repair.B.Overhaul repair is carried out in a dock.C.Overhaul repair is carried out once a year.D.Overhaul repair is done for the purpose of rating.
考题
During the dock repair,______should be measured firstly before tail shaft drawn out.A.the sinking of tail shaftB.the clearance of stern bearingC.the total flexure of shaftD.main engine crankshaft deflection
考题
This printer is of good quality. If it _______ break down within the first year, we would repair it at our expense.A. would B. should C. could D. might
考题
You are testing the external inflation bladder on an immersion suit and find it has a very slow leak.Which action should be taken ________.A.Replace the suitB.Replace the inflation bladderC.Take it out of service and repair in accordance with the manufacturers instructionsD.Some leakage should be expected and a topping off tube is provided; no other action is necessary
考题
( ) is the application of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.A.Quality assurance(QA)
B.Quality planning
C.Quality control(QC)
D.Quality costs
考题
()is the application of planned,systematic quality activities to ensure thatthe project will employ all processes needed to meet requirements.A.Quality assurance(QA)
B.Quality planning
C.Quality control(QC)
D.Quality costs
考题
()is the application of planned,systematic.quality activities to ensure that the project will employ all processes to meet requirements.A.Quality assurance
B.Quality planning
C.Quality control
D.Quality cost
考题
单选题After repair, the voyage trial of the M-E should be done ()A
after the mooring trial has passedB
before the mooring trialC
under the surveyors supervisionD
after repair
考题
单选题In regard to the production of goods in greater quantities, the author states that______.A
the price of the goods should dropB
the quality of the goods should improveC
the price and the quality should both riseD
the quality and the price should both drop
考题
单选题During the dock repair, should be measured firstly before tail shaft drawn out()A
the sinking of tail shaftB
the clearance of stern bearingC
the total flexure of shaftD
main engine crankshaft deflection
考题
单选题Which of the following items don’t belong to dock repair works?()A
making the repair list, booking spare parts and special tools for the dock repairB
shutting off all of the S.W valves to outboardC
the sketches or diagrams used for the dock repairD
cleaning up the oil tank and boiler before enter the dock
考题
单选题Which of the following items don’t belong to dock repair works?()A
the SW outboard valvesB
the tailshaft LO stop valveC
the drain valve of the boilerD
propeller shaft sealing device
考题
单选题Which of the following items don’t belong to dock repair works?()A
making the repair list, booking spare parts and special tools for the dock repairB
shutting off all of the SW valves to outboardC
the sketches or diagrams used for the dock repairD
cleaning up the oil tank and boiler before enter the dock
考题
单选题A user is unsatisfied with the quality of the repair that another technician has completed on their PC. Which of the following should be done to help the user?()A
Agree with the user’s complaintsB
Clarify the user’s statementsC
Minimize the user’s criticismD
Shadow the other technician on the next repair
考题
单选题Shore power must be() during dock repair.A
disconnectedB
switched offC
cut offD
connected
考题
单选题When the dock is refilled with water after docking repair, the first work which should be done by engineers is ()A
igniting boilerB
releasing air in sea water systemC
starting generatorD
cut off shore power
考题
问答题Task I(10 marks) You are a member of an organisation which meets regularly at a particular restaurant. The most recent meal you had there was not satisfactory, and you were very disappointed with the quality of the food and the behaviour of the staff. Write a letter to the manager of the restaurant. Explain what was wrong with the meal and the service, and suggest what he/she should do to ensure that you and your group return to the restaurant.You should write about 100 words. You do NOT need to write your own address.
考题
单选题M: Ace photography. W: Oh hello, I wonder if you could help me. I need—I don’t know if you could do this—I need a passport photograph. M: Passport photos? Yes, we do. W: ______? M: Well, we do four passport photos in a group for $4.50.A
Would’ you do it quicklyB
Would it be very expensiveC
Would you please do me a favorD
Would you give me a photo in good quality
考题
单选题To ensure the quality of dock repair, C/E should know very well ()A
the repair standard of main docking repair itemB
the special tool for repair itemC
the skill of repairerD
the status of docking repair equipment
考题
单选题During the dock repair, when installing the tail shaft and propeller, who should be on the spot to supervise?()A
chief engineerB
the engineerC
captainD
any member of the engine department
考题
单选题During the dock repair, each sea valve must be disassembled, cleaned and ground well.Before it reassemble the sealing surface between the valve and the valve seat should be checked by ()A
chief engineerB
surveyorC
the engineerD
the technique personnel of the shipyard