网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
The cargo gear includes().
A
derrick, winches, cargo ropes and wires
B
derricks, windlass, capstan
C
hatch covers, derricks, windlass
D
cranes, hatches, lashing wires
参考答案
参考解析
解析:
暂无解析
更多 “单选题The cargo gear includes().A derrick, winches, cargo ropes and wiresB derricks, windlass, capstanC hatch covers, derricks, windlassD cranes, hatches, lashing wires” 相关考题
考题
Ropes of wires attached to derricks to prevent them from swinging during cargo handling operations are ______.A.PreventersB.Side ropesC.StaysD.Guide lines
考题
Roll-on/roll-off ships are equipped with ________ .A.cargo elevatorsB.conveyor beltsC.rampsD.derricks and winches for cargo handling
考题
Vessel shall possess International Cargo Gear Certificates ______ duration of Charter Party showing winches and derricks in order.A.validity inB.valid forC.effective atD.effectiveness for
考题
A vessel used for international service shall possess ______ valid for duration of charter party showing winches and derricks in order.A.International Cargo Gear CertificateB.International Loadline CertificateC.International Safety Construction CertificateD.International Seaman Identification
考题
The Charterers to have the right to __________ of all winches,derricks including heavy lift gear and/or cranes to their full capacity.A.Freely useB.Use freelyC.Free useD.Use free
考题
我们需要大量的绑扎钢丝。()A、We need plenty of clamps.B、We need plenty of lashing wires.C、We need plenty of cargo wires.D、We need plenty of lashing bars.
考题
很多船上在每个舱口处都有两个吊杆及两台起货机。()A、Many ships have two derricks at each hatch.B、Many ships have two winches at each hatch.C、Many ships have two derricks and two winches at each hatch.D、Many ships have two derricks and two winches at each hatch cover.
考题
The ()(吊货索套) at hatch No.1 is quite worn out.A、cargo lightB、lashing wireC、cargo slingD、wire rope
考题
这些绑扎工具必须要再次上紧。()A、These lashing tools must be tightened again.B、These lashing wires must be tightened again.C、These lashing bars must be secured again.D、These cargo wires must be loosened again.
考题
杂货船可以用自己的吊杆装卸货物。()A、General cargo ships may load and discharge by her own winch.B、Bulk carriers may handle cargo by her own derricks.C、General cargo ships may load and discharge by her own derricks.D、General cargo ships may load and discharge by cranes.
考题
The cargo gear includes().A、derrick, winches, cargo ropes and wiresB、derricks, windlass, capstanC、hatch covers, derricks, windlassD、cranes, hatches, lashing wires
考题
()has more than ten percent broken wires. Stop using it at once.A、The cargo runnerB、The cargo blockC、The derrick slingD、The lashing wire
考题
单选题The system of derricks and winches has been largely replaced on newer ships by cranes()it is very efficient.A
whenB
becauseC
unlessD
though
考题
单选题Vessel shall possess International Cargo Gear Certificates () duration of Charter Party showing winches and derricks in order.A
validity inB
valid forC
effective atD
effectiveness for
考题
单选题我们需要大量的绑扎钢丝。()A
We need plenty of clamps.B
We need plenty of lashing wires.C
We need plenty of cargo wires.D
We need plenty of lashing bars.
考题
单选题集装箱是由龙门吊装卸。()A
Containers are loaded and discharged by gantry cranes.B
Cases are loaded and discharged by gantry cranes.C
Cases are loaded and discharged by heavy derricks.D
Containers are loaded and discharged by heavy derricks.
考题
单选题The cargo gear includes().A
derrick, winches, cargo ropes and wiresB
derricks, windlass, capstanC
hatch covers, derricks, windlassD
cranes, hatches, lashing wires
考题
单选题Vessel shall possess()valid for duration of charter Party showing winches and derricks in order.A
International Cargo Gear CertificateB
International Loadline CertificateC
International Safety Construction CertificateD
International Seaman Identification
考题
单选题()has more than ten percent broken wires. Stop using it at once.A
The cargo runnerB
The cargo blockC
The derrick slingD
The lashing wire
考题
单选题Deck cranes require() time to prepare for working cargo than derricks.A
lessB
moreC
manyD
much
考题
单选题很多船上在每个舱口处都有两个吊杆及两台起货机。()A
Many ships have two derricks at each hatch.B
Many ships have two winches at each hatch.C
Many ships have two derricks and two winches at each hatch.D
Many ships have two derricks and two winches at each hatch cover.
考题
单选题opes or wires attached to derricks to prevent them from swinging during cargo handling operations are().A
PreventersB
Side ropesC
StaysD
Guide lines
考题
单选题这些绑扎工具必须要再次上紧。()A
These lashing tools must be tightened again.B
These lashing wires must be tightened again.C
These lashing bars must be secured again.D
These cargo wires must be loosened again.
考题
单选题A vessel used for international service shall possess ()valid for duration of charter party showing winches and derricks in order.A
International Cargo Gear CertificateB
International Loadline CertificateC
International Safety Construction CertificateD
International Seaman Identification
考题
单选题杂货船可以用自己的吊杆装卸货物。()A
General cargo ships may load and discharge by her own winch.B
Bulk carriers may handle cargo by her own derricks.C
General cargo ships may load and discharge by her own derricks.D
General cargo ships may load and discharge by cranes.