网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
The()is the intermediate deck between upper deck and the inside bottom of the vessel.
A
forcastle
B
tweendeck
C
hatches
D
peak tanks
参考答案
参考解析
解析:
暂无解析
更多 “单选题The()is the intermediate deck between upper deck and the inside bottom of the vessel.A forcastleB tweendeckC hatchesD peak tanks” 相关考题
考题
Regulations define the bulkhead deck as ______.(subdivision and stability regulations)A.any deck extending from stem to sternB.the uppermost deck to which transverse watertight bulkheads extendC.the lowermost deck to which transverse watertight bulkheads extendD.the uppermost complete deck
考题
Strongbacks unshipped in an intermediate deck shall be secured so that they cannot be ______ into a lower compartment.A.movedB.tipped or draggedC.removedD.put
考题
Strongbacks unshipped in an intermediate deck shall not be placed closer than 15.24 cm from ______.A.the coamingB.hatch wayC.fore bulkheadD.aft bulkhead
考题
Which statement about the deck line is TRUE ________.A.The top of the deck line is marked at the highest point of the freeboard deck,including camber,at the midships pointB.A vessel with wooden planks on a steel deck will have the deck line marked at the intersection of the upper line of the wood sheathing with the side shellC.The deck edge is marked at the intersection of the freeboard deck with the side shell,at the lowest point of sheer,with the vessel at even trimD.On a vessel with a rounded stringer-sheer plate,the deck line is marked where the stringer plate turns down from the plane of the deck line
考题
______:the vertical distance measured on the vessel’s side amidships from the load water line to the upper side of the freeboard deck or a point corresponding to it.A.BuoyancyB.FreeboardC.DraftD.Displacement
考题
Between the side frames on a vessel, suppot for the deck beam is provided by ______.A.bracketsB.web framesC.deck stringersD.stanchions
考题
Cribbing is ______.A.wooden blocks or dunnage placed between a deck load and the deckB.the chains and shackles used to secure a deck cargoC.a crate in which a deck cargo is packagedD.cardboard separation pieces placed between deck loads to prevent chafing
考题
主甲板以下是二层甲板。()A、The deck below the lower deck is known as ‘tween deck.B、The deck below the main deck is known as ‘tween deck.C、The deck above the main deck is known as ‘tween deck.D、The deck below the lower deck is known as main deck.
考题
The deck from bow to stern is called the ()(主甲板).A、main deckB、tweendeckC、upper deckD、lower deck
考题
从船艏贯穿至船艉的甲板叫主甲板。()A、The deck from bow to stern is called the main deck.B、The deck from stern to bow is called the tweendeck.C、The deck from bow to stern is called the upper deck.D、The deck from stern to bow is called the lower deck.
考题
甲板分为艏楼甲板,主甲板和艉楼甲板。()A、The deck is divided into forecastle deck, main deck and poop deck.B、The deck is divided into forecastle deck, lower deck and main deck.C、The deck is divided into forecastle deck, main deck and lower deck.D、The deck is divided into main deck, lower deck and poop deck.
考题
单选题The()is the intermediate deck between upper deck and the inside bottom of the vessel.A
forcastleB
tweendeckC
hatchesD
peak tanks
考题
单选题()is the depth of the vessel at ship’s side from the upper deck to the lowest point of the keel.A
Extreme draftB
Molded draftC
Extreme depthD
Molded depth
考题
单选题The deck plating on a ship is supported primarily by deck longitudinals and deck().A
girdersB
stanchionsC
framesD
beams
考题
单选题()is from baseline to top of the upper deck breadth at the ship’s side amidships.A
Extreme draftB
Molded draftC
Extreme depthD
Molded depth
考题
单选题You must shift a weight from the upper tween deck to the lower hold. This shift will().A
make the vessel more tenderB
make the vessel stifferC
increase the rolling periodD
decrease the metacentric height
考题
单选题By definition,a spar deck is the().A
lower most continuous deck not broken by water tight bulkheadsB
after most weather deck above the main strength deckC
upper or weather deck above the main strength deckD
deck of light construction below the main or strength deck
考题
单选题甲板分为艏楼甲板,主甲板和艉楼甲板。()A
The deck is divided into forecastle deck, main deck and poop deck.B
The deck is divided into forecastle deck, lower deck and main deck.C
The deck is divided into forecastle deck, main deck and lower deck.D
The deck is divided into main deck, lower deck and poop deck.
考题
单选题Between the side frames on a vessel,support for the deck beams is provided by().A
stanchionsB
bracketsC
web framesD
deck stringers
考题
单选题The foremost part of the upper deck is called the().A
forecastleB
tweendeckC
hatchesD
peak tanks
考题
单选题You are loading a cargo that includes cylinders of acetylene aboard your break bulk vessel. Which statement is true? ()A
The cylinders must be stowed at least 10 horizontal feet from corrosive materials in the same spaceB
Stowage in the upper deck-deck is considered to be the equivalent of on deck stowage for this cargoC
The cylinders must have a red label for flammability and a green label for compressed gasD
The cylinders may be protected from the radiant heat of the Sun by laying a tarp on them
考题
单选题What is a spill pipe?()A
A drainage pipe that carries rain or spray from an upper deck to a lower deckB
A pipe under the anchor windlass leading to the chain lockerC
A chute,usually over the stern,to lead dumped garbage clear of the hullD
An opening in the deck leading outside the hull
考题
单选题Cribbing is().A
wooden blocks or dunnage placed between a deck load and the deckB
the chains and shackles used to secure a deck cargoC
a crate in which a deck cargo is packagedD
cardboard separation pieces placed between deck loads to prevent chafing
考题
单选题主甲板以下是二层甲板。()A
The deck below the lower deck is known as ‘tween deck.B
The deck below the main deck is known as ‘tween deck.C
The deck above the main deck is known as ‘tween deck.D
The deck below the lower deck is known as main deck.
考题
单选题从船艏贯穿至船艉的甲板叫主甲板。()A
The deck from bow to stern is called the main deck.B
The deck from stern to bow is called the tweendeck.C
The deck from bow to stern is called the upper deck.D
The deck from stern to bow is called the lower deck.
考题
单选题Right at the top is()It is 300 mm long and 25 mm wide with its upper edgs in line with the uppermost continuous watertight deck.A
the deck lineB
Plimsoll discC
Plimsoll lineD
sunmmer load line
热门标签
最新试卷